-
1
-
-
0024716540
-
Real-time tool control and job dispatching in flexible manufacturing systems
-
Han, M.H., Na, Y.K. and Hogg, G.L. (1989) ‘Real-time tool control and job dispatching in flexible manufacturing systems’, International Journal of Production Research, Vol. 27, pp.1257–1267.
-
(1989)
International Journal of Production Research
, vol.27
, pp. 1257-1267
-
-
Han, M.H.1
Na, Y.K.2
Hogg, G.L.3
-
2
-
-
0028452748
-
Multi-period tool and production assignment in flexible manufacturing systems
-
Sodhi, M.S., Askin, R.G. and Sen, S. (1995) ‘Multi-period tool and production assignment in flexible manufacturing systems’, International Journal of Production Research, Vol. 32, pp.1281–1294.
-
(1995)
International Journal of Production Research
, vol.32
, pp. 1281-1294
-
-
Sodhi, M.S.1
Askin, R.G.2
Sen, S.3
-
4
-
-
0002107023
-
Tool management: the key issues for integrated manufacture
-
Little, D., Kehoe, D.F. and Al-Maliki, I. (1998) ‘Tool management: the key issues for integrated manufacture’, Proceedings of 7th International Conference on Flexible Manufacturing Systems, pp.53–68.
-
(1998)
Proceedings of 7th International Conference on Flexible Manufacturing Systems
, pp. 53-68
-
-
Little, D.1
Kehoe, D.F.2
Al-Maliki, I.3
-
6
-
-
0027574372
-
The application of an inclined end mill machining strategy on 3-axis machining centre
-
Ip, W.L.R. and Loftus, M. (1993) ‘The application of an inclined end mill machining strategy on 3-axis machining centre’, International Journal of Machine Tools and Manufacture, Vol. 33, pp.115–133.
-
(1993)
International Journal of Machine Tools and Manufacture
, vol.33
, pp. 115-133
-
-
Ip, W.L.R.1
Loftus, M.2
-
7
-
-
0023981354
-
Graph-based heuristics for recognition of machined features from a 3D solid model
-
Joshi, S. and Chang, T.C. (1988) ‘Graph-based heuristics for recognition of machined features from a 3D solid model’, Computer Aided Design, Vol. 20, pp.58–66.
-
(1988)
Computer Aided Design
, vol.20
, pp. 58-66
-
-
Joshi, S.1
Chang, T.C.2
-
9
-
-
0028014137
-
Minimising the number of tool switches on a flexible machine
-
Crama, Y., Kolen, A.W.J., Oerlemans, A.G. and Spieksma, F.C.R. (1994) ‘Minimising the number of tool switches on a flexible machine’, International Journal of Flexible Manufacturing Systems, Vol. 6, pp.33–54.
-
(1994)
International Journal of Flexible Manufacturing Systems
, vol.6
, pp. 33-54
-
-
Crama, Y.1
Kolen, A.W.J.2
Oerlemans, A.G.3
Spieksma, F.C.R.4
-
12
-
-
0027802003
-
Simulation approach to assembly line modification: a case study
-
Chan, T.S. and Smith, A.M. (1993) ‘Simulation approach to assembly line modification: a case study’, International Journal of Manufacturing Systems, Vol. 12, pp.239–245.
-
(1993)
International Journal of Manufacturing Systems
, vol.12
, pp. 239-245
-
-
Chan, T.S.1
Smith, A.M.2
-
13
-
-
0003438817
-
-
Prentice Hall, New York
-
Yan, J., Ruan, M. and Power, J. (1994) Using Fuzzy Logic, Prentice Hall, New York.
-
(1994)
Using Fuzzy Logic
-
-
Yan, J.1
Ruan, M.2
Power, J.3
-
14
-
-
0027928107
-
Intermediate tool requirement planning for FMS
-
Khator, K. and Leung, L.C. (1994) ‘Intermediate tool requirement planning for FMS’, Journal of Manufacturing Systems, Vol. 13, pp.9–19.
-
(1994)
Journal of Manufacturing Systems
, vol.13
, pp. 9-19
-
-
Khator, K.1
Leung, L.C.2
-
15
-
-
0023384747
-
The machine loading and tool allocation problem in a flexible manufacturing system
-
Sarin, S.C. and Chen, C.S. (1987) ‘The machine loading and tool allocation problem in a flexible manufacturing system’, International Journal of Production Research, Vol. 25, pp.1081–1094.
-
(1987)
International Journal of Production Research
, vol.25
, pp. 1081-1094
-
-
Sarin, S.C.1
Chen, C.S.2
-
16
-
-
0028516734
-
Tool addition strategies for flexible manufacturing system
-
Sodhi, M.S., Agnetis, A. and Askin, R.G. (1994) ‘Tool addition strategies for flexible manufacturing system’, The International Journal of Flexible Manufacturing Systems, Vol. 6, pp.287–310.
-
(1994)
The International Journal of Flexible Manufacturing Systems
, vol.6
, pp. 287-310
-
-
Sodhi, M.S.1
Agnetis, A.2
Askin, R.G.3
|