메뉴 건너뛰기




Volumn 3, Issue 6, 2001, Pages 600-622

A fuzzy basis real-time monitoring system designed for the control of cutting tools in flexible manufacturing cells

Author keywords

FMC; fuzzy logic; scheduling; Tool management

Indexed keywords


EID: 27844513147     PISSN: 13682148     EISSN: None     Source Type: Journal    
DOI: 10.1504/IJMTM.2001.001432     Document Type: Article
Times cited : (6)

References (17)
  • 1
    • 0024716540 scopus 로고
    • Real-time tool control and job dispatching in flexible manufacturing systems
    • Han, M.H., Na, Y.K. and Hogg, G.L. (1989) ‘Real-time tool control and job dispatching in flexible manufacturing systems’, International Journal of Production Research, Vol. 27, pp.1257–1267.
    • (1989) International Journal of Production Research , vol.27 , pp. 1257-1267
    • Han, M.H.1    Na, Y.K.2    Hogg, G.L.3
  • 2
    • 0028452748 scopus 로고
    • Multi-period tool and production assignment in flexible manufacturing systems
    • Sodhi, M.S., Askin, R.G. and Sen, S. (1995) ‘Multi-period tool and production assignment in flexible manufacturing systems’, International Journal of Production Research, Vol. 32, pp.1281–1294.
    • (1995) International Journal of Production Research , vol.32 , pp. 1281-1294
    • Sodhi, M.S.1    Askin, R.G.2    Sen, S.3
  • 5
    • 0010061612 scopus 로고
    • The selection of optimum tool sizes for three-axis and multi-axis machining of highly curved features
    • Smith, G. and Stephenson, H. (1991) ‘The selection of optimum tool sizes for three-axis and multi-axis machining of highly curved features’, Proceedings of the 7th National Conference on Production Research, pp.316–320.
    • (1991) Proceedings of the 7th National Conference on Production Research , pp. 316-320
    • Smith, G.1    Stephenson, H.2
  • 6
    • 0027574372 scopus 로고
    • The application of an inclined end mill machining strategy on 3-axis machining centre
    • Ip, W.L.R. and Loftus, M. (1993) ‘The application of an inclined end mill machining strategy on 3-axis machining centre’, International Journal of Machine Tools and Manufacture, Vol. 33, pp.115–133.
    • (1993) International Journal of Machine Tools and Manufacture , vol.33 , pp. 115-133
    • Ip, W.L.R.1    Loftus, M.2
  • 7
    • 0023981354 scopus 로고
    • Graph-based heuristics for recognition of machined features from a 3D solid model
    • Joshi, S. and Chang, T.C. (1988) ‘Graph-based heuristics for recognition of machined features from a 3D solid model’, Computer Aided Design, Vol. 20, pp.58–66.
    • (1988) Computer Aided Design , vol.20 , pp. 58-66
    • Joshi, S.1    Chang, T.C.2
  • 12
    • 0027802003 scopus 로고
    • Simulation approach to assembly line modification: a case study
    • Chan, T.S. and Smith, A.M. (1993) ‘Simulation approach to assembly line modification: a case study’, International Journal of Manufacturing Systems, Vol. 12, pp.239–245.
    • (1993) International Journal of Manufacturing Systems , vol.12 , pp. 239-245
    • Chan, T.S.1    Smith, A.M.2
  • 14
    • 0027928107 scopus 로고
    • Intermediate tool requirement planning for FMS
    • Khator, K. and Leung, L.C. (1994) ‘Intermediate tool requirement planning for FMS’, Journal of Manufacturing Systems, Vol. 13, pp.9–19.
    • (1994) Journal of Manufacturing Systems , vol.13 , pp. 9-19
    • Khator, K.1    Leung, L.C.2
  • 15
    • 0023384747 scopus 로고
    • The machine loading and tool allocation problem in a flexible manufacturing system
    • Sarin, S.C. and Chen, C.S. (1987) ‘The machine loading and tool allocation problem in a flexible manufacturing system’, International Journal of Production Research, Vol. 25, pp.1081–1094.
    • (1987) International Journal of Production Research , vol.25 , pp. 1081-1094
    • Sarin, S.C.1    Chen, C.S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.