메뉴 건너뛰기




Volumn 24, Issue 1, 2003, Pages 111-146

INTEGRATING PRODUCTION AND TRANSPORTATION SCHEDULING DECISIONS BETWEEN TWO GEOGRAPHICALLY SEPARATED PLANTS

Author keywords

[No Author keywords available]

Indexed keywords


EID: 27844465616     PISSN: 07353766     EISSN: 21581592     Source Type: Journal    
DOI: 10.1002/j.2158-1592.2003.tb00034.x     Document Type: Article
Times cited : (19)

References (31)
  • 1
    • 84952521179 scopus 로고
    • “On The Design of Hierarchical Production Planning Systems”
    • Bitran, Gabriel R. and Arnaldo C. Hax (1977), “On The Design of Hierarchical Production Planning Systems”, Decision Sciences, Vol. 8 No. 1, pp. 28–55.
    • (1977) Decision Sciences , vol.8 , Issue.1 , pp. 28-55
    • Bitran, G.R.1    Hax, A.C.2
  • 3
    • 0023163926 scopus 로고
    • “Reducing Logistics Costs at General Motors”
    • Blumenfeld, Dennis E., Lawrence D. Burns, Carlos F. Daganzo, Michael C. Frick, and Randolf W. Hall (1987), “Reducing Logistics Costs at General Motors”, Interfaces, Vol. 17 No. 1, pp. 26–47.
    • (1987) Interfaces , vol.17 , Issue.1 , pp. 26-47
    • Blumenfeld, D.E.1    Burns, L.D.2    Daganzo, C.F.3    Frick, M.C.4    Hall, R.W.5
  • 4
    • 0022267380 scopus 로고
    • “Analyzing Tradeoffs Between Transportation, Inventory and Production Costs and Freight Networks”
    • Blumenfeld, Dennis E., Lawrence D. Burns, David Diltz, and Carlos F. Daganzo (1985), “Analyzing Tradeoffs Between Transportation, Inventory and Production Costs and Freight Networks”, Transportation Research, Vol. 19B, No. 5, pp. 361–380.
    • (1985) Transportation Research , vol.19B , Issue.5 , pp. 361-380
    • Blumenfeld, D.E.1    Burns, L.D.2    Diltz, D.3    Daganzo, C.F.4
  • 5
    • 0034221140 scopus 로고    scopus 로고
    • “Coordination of Production/Distribution Networks With Unbalanced Lead Times”
    • Bramel, Julien, Goyal Shobhna, and Paul Zipkin (2000) “Coordination of Production/Distribution Networks With Unbalanced Lead Times”, Operations Research, Vol. 48, No. 4, pp. 570–577.
    • (2000) Operations Research , vol.48 , Issue.4 , pp. 570-577
    • Bramel, J.1    Shobhna, G.2    Zipkin, P.3
  • 6
    • 0023984228 scopus 로고
    • “Strategic Analysis of Integrated Production Distribution Systems: Models and Methods”
    • Cohen, Morris and Hau Lee (1988), “Strategic Analysis of Integrated Production Distribution Systems: Models and Methods”, Operations Research, Vol. 36 No. 2, pp. 216–228.
    • (1988) Operations Research , vol.36 , Issue.2 , pp. 216-228
    • Cohen, M.1    Lee, H.2
  • 7
    • 0028424147 scopus 로고
    • “Dynamic Production Scheduling for a Process Industry”
    • de Matta, Renato and Monique Guignard (1994a), “Dynamic Production Scheduling for a Process Industry”, Operations Research, Vol. 42, No. 3, pp. 492–503.
    • (1994) Operations Research , vol.42 , Issue.3 , pp. 492-503
    • de Matta, R.1    Guignard, M.2
  • 8
    • 0028766168 scopus 로고
    • “The Effects of Changeover with Production Loss on Capacity-Oriented Production Scheduling”
    • de Matta, Renato and Monique Guignard (1994b), “The Effects of Changeover with Production Loss on Capacity-Oriented Production Scheduling”, European Journal of Operational Research, Vol. 72, No. 1, pp. 62–73.
    • (1994) European Journal of Operational Research , vol.72 , Issue.1 , pp. 62-73
    • de Matta, R.1    Guignard, M.2
  • 9
    • 0029392094 scopus 로고
    • “The Performance of Rolling Production Schedules in a Process Industry”
    • de Matta, Renato and Monique Guignard (1995), “The Performance of Rolling Production Schedules in a Process Industry”, IIE Transactions, Vol. 27 No. 5, pp. 564–573.
    • (1995) IIE Transactions , vol.27 , Issue.5 , pp. 564-573
    • de Matta, R.1    Guignard, M.2
  • 10
    • 21144480146 scopus 로고
    • “A Note on the Growth of a Production Planning System: A Case Study in Evolution”
    • de Matta, Renato and Tan Miller (1993) “A Note on the Growth of a Production Planning System: A Case Study in Evolution”, Interfaces, Vol. 23, No. 4, pp. 116–122.
    • (1993) Interfaces , vol.23 , Issue.4 , pp. 116-122
    • de Matta, R.1    Miller, T.2
  • 11
    • 3142572907 scopus 로고    scopus 로고
    • “Evaluating the Tradeoffs Between Idling and Shutting Down Production Lines in Process Industries”
    • de Matta, Renato and Tan Miller (1996), “Evaluating the Tradeoffs Between Idling and Shutting Down Production Lines in Process Industries”, Production and Operations Management, Vol. 5 No. 4, pp. 371–390.
    • (1996) Production and Operations Management , vol.5 , Issue.4 , pp. 371-390
    • de Matta, R.1    Miller, T.2
  • 13
    • 0017682606 scopus 로고
    • “Scheduling Production on One Machine With Changeover Costs”
    • Driscoll, Wade C. and Hamilton Emmons (1977), “Scheduling Production on One Machine With Changeover Costs”, AIIE, Vol. 9 No. 4, pp. 388–395.
    • (1977) AIIE , vol.9 , Issue.4 , pp. 388-395
    • Driscoll, W.C.1    Emmons, H.2
  • 14
    • 0023563839 scopus 로고
    • “Inventory/Routing: Reduction from an Annual to a Short Period Problem”
    • Dror, Moshe and Michael Ball (1987), “Inventory/Routing: Reduction from an Annual to a Short Period Problem”, Naval Research Logistics, Vol. 34 No. 4, pp. 891–905.
    • (1987) Naval Research Logistics , vol.34 , Issue.4 , pp. 891-905
    • Dror, M.1    Ball, M.2
  • 15
    • 0023287266 scopus 로고
    • “A Large Mixed Integer Production and Distribution Program”
    • Duran, F. (1987), “A Large Mixed Integer Production and Distribution Program”, European Journal of Operational Research, Vol. 28 No. 2, pp. 207–217.
    • (1987) European Journal of Operational Research , vol.28 , Issue.2 , pp. 207-217
    • Duran, F.1
  • 16
    • 0017931081 scopus 로고
    • “The Economic Lot Scheduling Problem (ELSP): Review and Extension”
    • Elmaghra by
    • Elmaghra by, Salah E. (1978), “The Economic Lot Scheduling Problem (ELSP): Review and Extension”, Management Science, Vol. 24 No. 6, pp. 587–598.
    • (1978) Management Science , vol.24 , Issue.6 , pp. 587-598
    • Salah, E.1
  • 17
    • 0019574134 scopus 로고
    • “A Generalized Heuristic for Vehicle Routing”
    • Fisher, Marshall L. and Ramchandran Jaikumar (1981), “A Generalized Heuristic for Vehicle Routing”, Networks, Vol. 11 No. 1, pp. 109–124.
    • (1981) Networks , vol.11 , Issue.1 , pp. 109-124
    • Fisher, M.L.1    Jaikumar, R.2
  • 18
    • 0023817926 scopus 로고
    • “A Dynamic Programming Solution of the Dynamic, Multi-Item Single Machine Scheduling Problem”
    • Gascon, Andre and Robert C. Leachman (1988), “A Dynamic Programming Solution of the Dynamic, Multi-Item Single Machine Scheduling Problem”, Operations Research, Vol. 36 No. 1, pp. 50–56.
    • (1988) Operations Research , vol.36 , Issue.1 , pp. 50-56
    • Gascon, A.1    Leachman, R.C.2
  • 19
    • 0000949843 scopus 로고
    • “Minimum Changeover Scheduling of Several Products on One Machine”
    • Glassey C. Roger (1968), “Minimum Changeover Scheduling of Several Products on One Machine”, Operations Research, Vol. 16 No. 2, pp. 342–352.
    • (1968) Operations Research , vol.16 , Issue.2 , pp. 342-352
    • Roger, G.C.1
  • 20
    • 0006040250 scopus 로고
    • “An Integrated Production, Distribution, and Inventory Planning System”
    • Glover, Fred, Gene Jones, David Karney, Darwin Klingman, and John Mote (1979), “An Integrated Production, Distribution, and Inventory Planning System”, Interfaces, Vol. 9 No. 5, pp. 21–35.
    • (1979) Interfaces , vol.9 , Issue.5 , pp. 21-35
    • Glover, F.1    Jones, G.2    Karney, D.3    Klingman, D.4    Mote, J.5
  • 21
    • 0029288359 scopus 로고
    • “The Economic Lot and Delivery Scheduling Problem: The Common Cycle Case”
    • Hahm, Juho and Candice Yano (1995), “The Economic Lot and Delivery Scheduling Problem: The Common Cycle Case”, IIE Transactions, Vol. 27 No. 2, pp. 113–125.
    • (1995) IIE Transactions , vol.27 , Issue.2 , pp. 113-125
    • Hahm, J.1    Yano, C.2
  • 22
    • 0002957476 scopus 로고
    • “Hierarchical Integration of Production Planning and Scheduling”
    • M. A. Geisler, ed., North Holland, Amsterdam
    • Hax, Arnoldo C. and Harlan C. Meal (1975), “Hierarchical Integration of Production Planning and Scheduling”, in Studies in the Management Sciences, M. A. Geisler ed., Vol. 1, North Holland, Amsterdam.
    • (1975) Studies in the Management Sciences , vol.1
    • Hax, A.C.1    Meal, H.C.2
  • 23
    • 0041847995 scopus 로고    scopus 로고
    • “The Newspaper Production/Distribution Problem”
    • Hurter, Arthur P. and M. G. Van Buer (1996), “The Newspaper Production/Distribution Problem”, Journal Of Business Logistics, Vol. 17 No. 1, pp. 85–107.
    • (1996) Journal Of Business Logistics , vol.17 , Issue.1 , pp. 85-107
    • Hurter, A.P.1    Van Buer, M.G.2
  • 24
    • 0022022738 scopus 로고
    • “The Deterministic Dynamic Product Cycling Problem”
    • Karmarkar, Uday S. and Linus Schrage (1985), “The Deterministic Dynamic Product Cycling Problem”, Operations Research, Vol. 33 No. 2, pp. 326–345.
    • (1985) Operations Research , vol.33 , Issue.2 , pp. 326-345
    • Karmarkar, U.S.1    Schrage, L.2
  • 25
    • 0022101534 scopus 로고
    • “A Hierarchical Production Planning System”
    • Liberatore, Matthew J. and Tan Miller (1985), “A Hierarchical Production Planning System”, Interfaces, Vol. 15 No. 4, pp. 1–11.
    • (1985) Interfaces , vol.15 , Issue.4 , pp. 1-11
    • Liberatore, M.J.1    Miller, T.2
  • 26
    • 0025434528 scopus 로고
    • “A Strong Cutting Plane Algorithm for Production Scheduling with Changeover Costs”
    • Magnanti, Tom L. and Rita Vachani (1990), “A Strong Cutting Plane Algorithm for Production Scheduling with Changeover Costs”, Operations Research, Vol. 38 No. 3, pp. 456–473.
    • (1990) Operations Research , vol.38 , Issue.3 , pp. 456-473
    • Magnanti, T.L.1    Vachani, R.2
  • 28
    • 0015400859 scopus 로고
    • “Optimum Production Scheduling of Multicommodity in Flow Line”
    • Mitsumori, S. (1972), “Optimum Production Scheduling of Multicommodity in Flow Line”, IEEE Trans-SMC, Vol. 2, pp. 486–493.
    • (1972) IEEE Trans-SMC , vol.2 , pp. 486-493
    • Mitsumori, S.1
  • 29
    • 0001343645 scopus 로고
    • “Rounding Off to Powers of Two in Continuous Relaxations of Capacitated Lot Sizing Problems”
    • Roundy, Robin (1986), “Rounding Off to Powers of Two in Continuous Relaxations of Capacitated Lot Sizing Problems”, Management Science, Vol. 35 No. 12, pp. 1433–1442.
    • (1986) Management Science , vol.35 , Issue.12 , pp. 1433-1442
    • Roundy, R.1
  • 30
    • 85077039770 scopus 로고    scopus 로고
    • “A Review Of Integrated Analysis Of Production-Distribution Systems”
    • Sarmiento, Ana Maria and Rakesh Nagi (1999), “A Review Of Integrated Analysis Of Production-Distribution Systems”, IEEE Transactions, Vol. 13 No. 11, pp. 1061–1074.
    • (1999) IEEE Transactions , vol.13 , Issue.11 , pp. 1061-1074
    • Sarmiento, A.M.1    Nagi, R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.