|
Volumn 16, Issue 1-2, 2005, Pages 27-41
|
A hybrid methodology for enhancing reliability of large systems in conceptual design and its application to the design of a multiphase flow station
|
Author keywords
Axiomatic design; Crude oil production; Multiphase pump; RCM; Reliability; Robust design; TRIZ
|
Indexed keywords
CRUDE PETROLEUM;
PLANNING;
PREVENTIVE MAINTENANCE;
PROBLEM SOLVING;
RELIABILITY;
SYSTEMS ANALYSIS;
AXIOMATIC DESIGN;
CRUDE OIL PRODUCTION;
HYBRID METHODOLOGY;
MAINTENANCE PLANNING;
MULTIPHASE PUMP;
RCM;
RELIABILITY ANALYSIS;
ROBUST DESIGN;
TRIZ;
LARGE SCALE SYSTEMS;
|
EID: 27744559246
PISSN: 09349839
EISSN: None
Source Type: Journal
DOI: 10.1007/s00163-005-0003-1 Document Type: Article |
Times cited : (17)
|
References (18)
|