메뉴 건너뛰기




Volumn 93, Issue 11, 2005, Pages 1942-1954

Blackout prevention in the United States, Europe, and Russia

Author keywords

Cascading failures; Centralized control; Emergency control; Frequency control; Load flow control; Power generation control; Power generation dispatch; Power system blackouts; Power system control; Power system restoration; Protective relaying

Indexed keywords

CONTROL SYSTEMS; MATHEMATICAL MODELS; OPTICAL INTERCONNECTS; PERSONNEL; POWER GENERATION; PROBLEM SOLVING;

EID: 27744513137     PISSN: 00189219     EISSN: None     Source Type: Journal    
DOI: 10.1109/JPROC.2005.857486     Document Type: Conference Paper
Times cited : (214)

References (43)
  • 3
    • 42549096705 scopus 로고    scopus 로고
    • Technical analysis of the August 14, 2003, blackout: What happened, why, and what did we learn?
    • PSS, July 13, [Online]
    • "Technical analysis of the August 14, 2003, blackout: What happened, why, and what did we learn?" PSS, July 13, 2004 [Online]. Available: ftp://www.nerc.com/pub/sys/all_updl/docs/ blackout/NERC_Final_Blackout_Report_07_13_04.pdf, report to the NERC Board of Trustees by the NERC Steering Group
    • (2004) Report to the NERC Board of Trustees by the NERC Steering Group
  • 5
    • 27744505251 scopus 로고    scopus 로고
    • It was possible to avoid the blackout
    • S. Vakhterov, "It was possible to avoid the blackout," in Russian, Power Market, no. 1, 2004.
    • (2004) Power Market , Issue.1
    • Vakhterov, S.1
  • 8
    • 8744220110 scopus 로고    scopus 로고
    • Union for the Coordination of Transmission of Electricity (UCTE), Brussels, Belgium, Oct. 3, [Online]
    • "Interim report of the Investigation Committee on the 28 September 2003 blackout in Italy" Union for the Coordination of Transmission of Electricity (UCTE), Brussels, Belgium, Oct. 3, 2003 [Online]. Available: http://www.energie-schweiz.ch/imperia/md/content/ medienmitteilungen/mm06-122003/82.pdf
    • (2003) Interim Report of the Investigation Committee on the 28 September 2003 Blackout in Italy
  • 9
    • 84861284203 scopus 로고    scopus 로고
    • Black-out: The events of 28 September 2003
    • Italy, Oct. 1, [Online], Press Release
    • "Black-out: The events of 28 September 2003" Gesture Rete Transmissione Nazionale, Italy, Oct. 1, 2003 [Online]. Available: http://www.grtn.it/eng/documentinewsstatiche/blackout28set03. pdf, Press Release
    • (2003) Gesture Rete Transmissione Nazionale
  • 13
    • 84861280287 scopus 로고    scopus 로고
    • How Russia maintains a reliable power grid
    • Apr. [Online]
    • V. A. Semenov, "How Russia maintains a reliable power grid," Transmission Distribution World Apr. 1997 [Online]. Available: http://tdworld.com/mag/power_russia_maintains_reliable/
    • (1997) Transmission Distribution World
    • Semenov, V.A.1
  • 20
    • 27744487086 scopus 로고    scopus 로고
    • Emergency control in the united power system of Russia
    • V. A. Stroev and V. A. Semenov, "Emergency control in the united power system of Russia," J. Elect. Eng., vol. 51, no. 5-6, pp. 120-132, 2000.
    • (2000) J. Elect. Eng. , vol.51 , Issue.5-6 , pp. 120-132
    • Stroev, V.A.1    Semenov, V.A.2
  • 22
    • 84861280832 scopus 로고    scopus 로고
    • North American Electric Reliability Council (NERC) [Online]
    • "Policy1-Generation control and performance" North American Electric Reliability Council (NERC) [Online]. Available: http:// www.nerc.com/~oc/rs.html
    • Policy1-generation Control and Performance
  • 24
    • 0003938191 scopus 로고    scopus 로고
    • Control performance standards for interconnected operation
    • Priority-Based Control Engineering, Dublin, OH, April
    • N. Jaleeli and L. S. VanSlyck, "Control performance standards for interconnected operation," Priority-Based Control Engineering, Dublin, OH, EPRI Tech. Rep. TR-107817, April 1997.
    • (1997) EPRI Tech. Rep. , vol.TR-107817
    • Jaleeli, N.1    VanSlyck, L.S.2
  • 26
    • 84861275491 scopus 로고    scopus 로고
    • California ISO Operating Procedure I-1202 [Online]
    • Time error monitor, version 1.5, California ISO Operating Procedure I-1202 [Online]. Available: http://www.caiso.com/docs/ 1998/12/02/199812021741014859.pdf
    • Time Error Monitor, Version 1.5
  • 27
    • 84861274410 scopus 로고    scopus 로고
    • Western Electricity Coordinating Council (WECC), Oct. [Online]
    • "WECC procedure for time error control" Western Electricity Coordinating Council (WECC), Oct. 2002 [Online]. Available: http://www.wecc.biz/documents/standards/recently_approved/ Time_Error_Procedure_10-04-02.pdf
    • (2002) WECC Procedure for Time Error Control
  • 28
    • 84861276846 scopus 로고    scopus 로고
    • Western Electricity Coordinating Council (WECC), Oct. [Online]
    • "Description of area control error (ACE) calculation (automatic time error control)" Western Electricity Coordinating Council (WECC), Oct. 2002 [Online]. Available: http://www. wecc.biz/documents/standards/recently_approved/ACEequation_ 10-04-02.pdf
    • (2002) Description of Area Control Error (ACE) Calculation (Automatic Time Error Control)
  • 29
    • 0020129042 scopus 로고
    • Decomposition of time deviation and inadvertent interchange on interconnected systems. Part I: Identification, separation and measurement of components
    • May
    • N. Cohn, "Decomposition of time deviation and inadvertent interchange on interconnected systems. Part I: Identification, separation and measurement of components," IEEE Trans. Power App. Syst., vol. PAS-101, no. 5, pp. 1144-1151, May 1982.
    • (1982) IEEE Trans. Power App. Syst. , vol.PAS-101 , Issue.5 , pp. 1144-1151
    • Cohn, N.1
  • 30
    • 0020129041 scopus 로고
    • Decomposition of time deviation and inadvertent interchange on interconnected systems. Part II: Utilization of components for performance evaluation and corrective control
    • May
    • N. Cohn, "Decomposition of time deviation and inadvertent interchange on interconnected systems. Part II: Utilization of components for performance evaluation and corrective control," IEEE Trans. Power App. Syst., vol. PAS-101, no. 5, pp. 1152-1158, May 1982.
    • (1982) IEEE Trans. Power App. Syst. , vol.PAS-101 , Issue.5 , pp. 1152-1158
    • Cohn, N.1
  • 31
    • 84861279520 scopus 로고    scopus 로고
    • North American Electric Reliability Council (NERC) [Online]
    • Balance resources and demand standard ver. 2, North American Electric Reliability Council (NERC) [Online]. Available: http:// www.nerc.com/~filez/standards/Balance-Resources-Demand.html
    • Balance Resources and Demand Standard Ver. 2
  • 32
    • 84861273832 scopus 로고    scopus 로고
    • North American Electric Reliability Council (NERC) [Online]
    • Version 0 reliability standard, North American Electric Reliability Council (NERC) [Online]. Available: http://www.nerc.com/~filez/ standards/Version-0.html
    • Version 0 Reliability Standard
  • 35
    • 27744484229 scopus 로고    scopus 로고
    • A eulogy for RTOs-Interregional is better
    • Oct. 15
    • M. Ilic, "A eulogy for RTOs-Interregional is better," Public Utilities Fortnightly, vol. 138, no. 19, Oct. 15, 2000.
    • (2000) Public Utilities Fortnightly , vol.138 , Issue.19
    • Ilic, M.1
  • 39
    • 0038617538 scopus 로고    scopus 로고
    • North American Electric Reliability Council (NERC), Jun. 15, [Online]
    • "NERC operating manual" North American Electric Reliability Council (NERC), Jun. 15, 2004 [Online]. Available: ftp://www.nerc.com/pub/sys/all_updl/oc/opman/opman.pdf
    • (2004) NERC Operating Manual
  • 40
    • 84861272542 scopus 로고    scopus 로고
    • California ISO Operating Procedure RS-902 [Online]
    • Reliability coordinator ver. 1.2, California ISO Operating Procedure RS-902 [Online]. Available: http://www.caiso.com/docs/ 2001/09/10/2001091008580310034.pdf
    • Reliability Coordinator Ver. 1.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.