메뉴 건너뛰기




Volumn 27, Issue 9-10, 2005, Pages 647-655

A value-based probabilistic approach to designing urban distribution systems

Author keywords

Distribution system reliability; Urban distribution system; Value based approach

Indexed keywords

COSTS; ELECTRIC LOADS; ELECTRIC TRANSFORMERS; MATHEMATICAL MODELS; OPTIMIZATION; PROBABILITY DISTRIBUTIONS; RELIABILITY THEORY; REPAIR; URBAN PLANNING; VALUE ENGINEERING;

EID: 27644555627     PISSN: 01420615     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijepes.2005.08.006     Document Type: Conference Paper
Times cited : (23)

References (9)
  • 1
    • 0242368962 scopus 로고    scopus 로고
    • Reliability modeling of distributed generation in conventional distribution systems planning and analysis
    • A.A. Chowdhury, S.K. Agarwal, and D.O. Koval Reliability modeling of distributed generation in conventional distribution systems planning and analysis IEEE Trans Ind Appl 39 5 2003 1493 1498
    • (2003) IEEE Trans Ind Appl , vol.39 , Issue.5 , pp. 1493-1498
    • Chowdhury, A.A.1    Agarwal, S.K.2    Koval, D.O.3
  • 2
    • 0031647237 scopus 로고    scopus 로고
    • Value-based distribution system reliability planning
    • A.A. Chowdhury, and D.O. Koval Value-based distribution system reliability planning IEEE Trans Ind Appl 34 1 1998 23 29
    • (1998) IEEE Trans Ind Appl , vol.34 , Issue.1 , pp. 23-29
    • Chowdhury, A.A.1    Koval, D.O.2
  • 3
    • 0035509762 scopus 로고    scopus 로고
    • Application of customer interruption costs in transmission network reliability planning
    • A.A. Chowdhury, and D.O. Koval Application of customer interruption costs in transmission network reliability planning IEEE Trans Ind Appl 37 6 2001 1590 1596
    • (2001) IEEE Trans Ind Appl , vol.37 , Issue.6 , pp. 1590-1596
    • Chowdhury, A.A.1    Koval, D.O.2
  • 4
    • 0032204324 scopus 로고    scopus 로고
    • Distribution reliability cost/worth analysis using analytical and sequential simulation techniques
    • R. Billinton, and P. Wang Distribution reliability cost/worth analysis using analytical and sequential simulation techniques IEEE Trans Power Syst 13 4 1998 1245 1250
    • (1998) IEEE Trans Power Syst , vol.13 , Issue.4 , pp. 1245-1250
    • Billinton, R.1    Wang, P.2
  • 5
    • 0031118145 scopus 로고    scopus 로고
    • Automated primary distribution system design: Reliability and cost optimization
    • R.E. Brown, S. Gupta, R.D. Christie, S.S. Venkata, and R. Fletcher Automated primary distribution system design: reliability and cost optimization IEEE Trans Power Deliv 12 2 1997 1017 1022
    • (1997) IEEE Trans Power Deliv , vol.12 , Issue.2 , pp. 1017-1022
    • Brown, R.E.1    Gupta, S.2    Christie, R.D.3    Venkata, S.S.4    Fletcher, R.5
  • 6
    • 0034501504 scopus 로고    scopus 로고
    • Current practices and customer value-based distribution system reliability planning
    • A.A. Chowdhury, and D.O. Koval Current practices and customer value-based distribution system reliability planning Proc IEEE/IAS Annu Meet 2 2000 909 916
    • (2000) Proc IEEE/IAS Annu Meet , vol.2 , pp. 909-916
    • Chowdhury, A.A.1    Koval, D.O.2
  • 7
    • 0034186827 scopus 로고    scopus 로고
    • Budget constrained planning to optimize power system reliability
    • R.E. Brown, and M.M. Marshall Budget constrained planning to optimize power system reliability IEEE Trans Power Syst 15 2 2000 887 892
    • (2000) IEEE Trans Power Syst , vol.15 , Issue.2 , pp. 887-892
    • Brown, R.E.1    Marshall, M.M.2
  • 8
    • 0033877589 scopus 로고    scopus 로고
    • The impact of heuristic initialization on distribution system reliability optimization
    • R.E. Brown The impact of heuristic initialization on distribution system reliability optimization Int J Eng Intell Syst Electr Eng Commun 8 1 2000 45 52
    • (2000) Int J Eng Intell Syst Electr Eng Commun , vol.8 , Issue.1 , pp. 45-52
    • Brown, R.E.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.