Modeling cost escalation as a risk factor in construction projects

Author keywords

Computer model; Construction projects; Cost escalation; Inflation; Probabilistic method; Risk analysis

Indexed keywords

COMPUTER MODEL; CONSTRUCTION PROJECTS; COST ESCALATION; INFLATION; PROBABILISTIC METHODS; RISK ANALYSIS;

EID: 27644442227     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (2)

References (13)
  • 2
    • 27644591512 scopus 로고    scopus 로고
    • Applying accepted economic indicators to predict cost escalation for construction
    • April
    • Capano, Graig D., and Karshenas, Saeed. (2003). "Applying Accepted Economic Indicators to Predict Cost Escalation for Construction." ASC Proceedings of the 39th Annual Conference, April, 277-288.
    • (2003) ASC Proceedings of the 39th Annual Conference , pp. 277-288
    • Capano, G.D.1    Karshenas, S.2
  • 3
    • 27644553295 scopus 로고    scopus 로고
    • Long term forecasts of inflation rates using quantitative tools
    • February
    • Clark, James M. (2001). "Long Term Forecasts of Inflation Rates Using Quantitative Tools." Financial Engineering News, No. 20, February, (available at http://www.fenews.com/fen20/longtermforecasts.html).
    • (2001) Financial Engineering News , Issue.20
    • Clark, J.M.1
  • 4
    • 0037242979 scopus 로고    scopus 로고
    • How common and how large are cost overruns in transport infrastructure projects?
    • Flyvbjerg, B., Holm, M. K. S., and Buhl, S. L. (2003), "How Common and How Large are Cost Overruns in Transport Infrastructure Projects?." Transport Reviews, Vol. 23, No. 1, 71-88.
    • (2003) Transport Reviews , vol.23 , Issue.1 , pp. 71-88
    • Flyvbjerg, B.1    Holm, M.K.S.2    Buhl, S.L.3
  • 5
    • 0442328937 scopus 로고    scopus 로고
    • What causes cost overrun in transportation infrastructure projects?
    • January
    • Flyvbjerg, B., Holm, M. K. S., and Buhl, S. L. (2004), "What Causes Cost Overrun in Transportation Infrastructure Projects?." Transport Reviews, Vol. 24, No. 1, 3-18, January.
    • (2004) Transport Reviews , vol.24 , Issue.1 , pp. 3-18
    • Flyvbjerg, B.1    Holm, M.K.S.2    Buhl, S.L.3
  • 6
    • 0027205810 scopus 로고
    • Computerized approach for forecasting the rate of cost escalation
    • Hanna, Award S., and Blair, Andrew N. (1993). "Computerized Approach for Forecasting the Rate of Cost Escalation." Computing in Civil and Building Engineering, 401-408.
    • (1993) Computing in Civil and Building Engineering , pp. 401-408
    • Hanna, A.S.1    Blair, A.N.2
  • 10
    • 9144258565 scopus 로고    scopus 로고
    • The development of a new cost-risk estimating process for transportation infrastructure projects
    • Spring/Summer
    • Reilly, J., McBride, M., Sangrey, D., MacDonald, D., and Brown, J. (2004), "The Development of a New Cost-Risk Estimating Process for Transportation Infrastructure Projects," Civil Engineering Practice, Vol. 19, No. 1, 53-75, Spring/Summer.
    • (2004) Civil Engineering Practice , vol.19 , Issue.1 , pp. 53-75
    • Reilly, J.1    McBride, M.2    Sangrey, D.3    MacDonald, D.4    Brown, J.5
  • 13


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.