-
2
-
-
0023977010
-
The shifting bottleneck procedure for job shop scheduling
-
J. Adams, E. Balas and D. Zawack, The Shifting Bottleneck Procedure for job shop scheduling, Management Science, 34(1988), 391-401.
-
(1988)
Management Science
, vol.34
, pp. 391-401
-
-
Adams, J.1
Balas, E.2
Zawack, D.3
-
3
-
-
0029636121
-
Global lower bounds for flowshops with multiple processors
-
D.L. Santos, J.L. Hunssucker and D.E. Deal, Global lower bounds for flowshops with multiple processors, European Journal of Operational Research, 80(1995), 112-120.
-
(1995)
European Journal of Operational Research
, vol.80
, pp. 112-120
-
-
Santos, D.L.1
Hunssucker, J.L.2
Deal, D.E.3
-
4
-
-
0024016313
-
An adaptable scheduling algorithm for flexible flow lines
-
R. Wittrock, An adaptable scheduling algorithm for flexible flow lines, Operations Research, 36(1988), 445-453.
-
(1988)
Operations Research
, vol.36
, pp. 445-453
-
-
Wittrock, R.1
-
5
-
-
0346485830
-
A shifting bottleneck approach for a parallel-machine flowshop scheduling problem
-
J. Cheng, Y. Karuno, H. Kise, A Shifting Bottleneck Approach for a Parallel-Machine Flowshop Scheduling Problem, Journal of the Operations Research Society of Japan, 44(2001), 140-156.
-
(2001)
Journal of the Operations Research Society of Japan
, vol.44
, pp. 140-156
-
-
Cheng, J.1
Karuno, Y.2
Kise, H.3
-
7
-
-
0031103568
-
Scheduling of flexible flow lines in an automobile assembly plant
-
A. Agnetis, A. Pacifici, F. Rossi, M. Lucertini, S. Nicoletti, F. Nicolo, G. Oriolo, D. Pacciarelli, E. Pesaro, Scheduling of flexible flow lines in an automobile assembly plant, European Journal of Operational Research, 97(1997), 348-362.
-
(1997)
European Journal of Operational Research
, vol.97
, pp. 348-362
-
-
Agnetis, A.1
Pacifici, A.2
Rossi, F.3
Lucertini, M.4
Nicoletti, S.5
Nicolo, F.6
Oriolo, G.7
Pacciarelli, D.8
Pesaro, E.9
-
8
-
-
0028426236
-
Learning-based scheduling in a flexible manufacturing flow line
-
S. Piramuthu, N. Raman, M.J. Shaw, Learning-based scheduling in a flexible manufacturing flow line, IEEE Transactions on Engineering Management 41(1994), 172-182.
-
(1994)
IEEE Transactions on Engineering Management
, vol.41
, pp. 172-182
-
-
Piramuthu, S.1
Raman, N.2
Shaw, M.J.3
-
9
-
-
2942674864
-
Scheduling flexible flow lines with sequence-dependent setup times
-
M.E. Kurz, R.G. Askin, Scheduling flexible flow lines with sequence-dependent setup times, European Journal of Operational Research, 159(2003), 66-82.
-
(2003)
European Journal of Operational Research
, vol.159
, pp. 66-82
-
-
Kurz, M.E.1
Askin, R.G.2
-
10
-
-
0001096735
-
Genetic algorithms and random keys for sequencing and optimization
-
J.C. Bean, Genetic algorithms and random keys for sequencing and optimization, ORSA Journal on Computing, 6(1994), 154-160.
-
(1994)
ORSA Journal on Computing
, vol.6
, pp. 154-160
-
-
Bean, J.C.1
-
11
-
-
0000478428
-
FLOWMULT: Permutation sequences for flow shops with multiple processors
-
D.L. Santos, J.L. Hunssucker and D.E. Deal, FLOWMULT: Permutation sequences for flow shops with multiple processors, Journal of Information and Optimization Sciences 16-2(1995), 351-366.
-
(1995)
Journal of Information and Optimization Sciences
, vol.16
, Issue.2
, pp. 351-366
-
-
Santos, D.L.1
Hunssucker, J.L.2
Deal, D.E.3
-
15
-
-
27144447252
-
A shifting bottleneck genetic algorithm for scheduling flexible flow shops
-
University of Essex, Uk
-
A. Salhi and J.A.Vázquez Rodríguez. A Shifting Bottleneck Genetic Algorithm for Scheduling Flexible Flow Shops, Working paper. University of Essex, Uk.
-
Working Paper
-
-
Salhi, A.1
Rodríguez, J.A.V.2
|