-
2
-
-
0004174773
-
-
M. Dekker, New York
-
M. Shahidehpour, M. Alomoush: Restructured Electrical Power Systems, Operations, Trading, and Volatility, M. Dekker, New York, 2001.
-
(2001)
Restructured Electrical Power Systems, Operations, Trading, and Volatility
-
-
Shahidehpour, M.1
Alomoush, M.2
-
3
-
-
0028371902
-
Unit commitment literature synopsis
-
February
-
G. B. Sheble and G. N. Fand, "Unit Commitment Literature Synopsis", IEEE Trans. Power Syst., vol. 9, No. 1, pp. 128-135, February 1994.
-
(1994)
IEEE Trans. Power Syst.
, vol.9
, Issue.1
, pp. 128-135
-
-
Sheble, G.B.1
Fand, G.N.2
-
4
-
-
2542598480
-
Unit commitment-a bibliographical survey
-
May
-
N. P. Padhy, "Unit commitment-a bibliographical survey," IEEE Trans. Power Syst., Vol. 19, No. 2, May 2004
-
(2004)
IEEE Trans. Power Syst.
, vol.19
, Issue.2
-
-
Padhy, N.P.1
-
5
-
-
0037631146
-
Making unit commitment decisions when electricity is traded at spot market prices
-
J. Valenzuela and M. Mazumdar, "Making Unit Commitment Decisions When Electricity is Traded at Spot Market Prices", Proceedings of IEEE Winter Meeting, 2001.
-
(2001)
Proceedings of IEEE Winter Meeting
-
-
Valenzuela, J.1
Mazumdar, M.2
-
7
-
-
0034186741
-
A profit-based unit commitment for the competitive environment
-
May
-
C. W. Richter, Jr., and G. B. Sheble, "A Profit-Based Unit Commitment For The Competitive Environment", IEEE Transactions on Power Systems, vol. 15, pp. 715-721, May 2000.
-
(2000)
IEEE Transactions on Power Systems
, vol.15
, pp. 715-721
-
-
Richter Jr., C.W.1
Sheble, G.B.2
-
8
-
-
0029356615
-
A direct method of security-constrained unit commitment
-
August
-
J. J. Shaw, "A Direct Method of Security-Constrained Unit Commitment," IEEE Trans. Power Syst., Vol. 10, No. 3, pp. 1329-1342, August 1995.
-
(1995)
IEEE Trans. Power Syst.
, vol.10
, Issue.3
, pp. 1329-1342
-
-
Shaw, J.J.1
-
9
-
-
0034243270
-
The B.C. Hydro short term hydro scheduling optimization model
-
Aug.
-
Z.K. Shawwash, T. K. Siu, S.O.D. Russell, "The B.C. Hydro short term hydro scheduling optimization model," IEEE Trans. Power Syst., Vol. 15, No: 3, Aug. 2000, pp.1125-1131.
-
(2000)
IEEE Trans. Power Syst.
, vol.15
, Issue.3
, pp. 1125-1131
-
-
Shawwash, Z.K.1
Siu, T.K.2
Russell, S.O.D.3
-
10
-
-
0035339615
-
A practical hydro, dynamic unit commitment and loading model
-
May
-
T. K. Siu; G. A. Nash, Z. K. Shawwash; "A practical hydro, dynamic unit commitment and loading model," IEEE Trans. Power Syst.,Volume: 16, Issue: 2, May 2001, pp. 301-306.
-
(2001)
IEEE Trans. Power Syst.
, vol.16
, Issue.2
, pp. 301-306
-
-
Siu, T.K.1
Nash, G.A.2
Shawwash, Z.K.3
-
12
-
-
84888896780
-
-
Western Electricity Coordinating Council (Aug 9th, 2002) NERC/WECC Planning Standards and Minimum Operating Reliability Criteria. Available: Http://www.wecc.biz/documents/publications/PCCTOFC.pdf
-
-
-
-
13
-
-
0024001585
-
Towards a more rigorous and practical unit commitment by lagrangian relaxation
-
May
-
T. Zhuang and F. D. Galiana., "Towards A More Rigorous And Practical Unit Commitment By Lagrangian Relaxation", IEEE Trans. Power Syst., vol. 3, No. 2, pp. 763-773, May 1988.
-
(1988)
IEEE Trans. Power Syst.
, vol.3
, Issue.2
, pp. 763-773
-
-
Zhuang, T.1
Galiana, F.D.2
-
14
-
-
0024765474
-
Implementation of a langrangian relaxation based unit commitment problem
-
November
-
S. Virmani, E. Adrian, K. Imhof, and S. Mukherjee, "Implementation of a Langrangian Relaxation based Unit Commitment Problem," IEEE Trans. on Power Syst., vol. 4, No. 4, pp. 1373-1379, November 1989.
-
(1989)
IEEE Trans. on Power Syst.
, vol.4
, Issue.4
, pp. 1373-1379
-
-
Virmani, S.1
Adrian, E.2
Imhof, K.3
Mukherjee, S.4
-
15
-
-
0029356616
-
Short term generation scheduling with transmission and environmental constraints using an augmented lagrangian relaxation
-
August
-
S. J. Wang, S. M. Shahidehpour, D. S. Kirschen, S. Mokhtari, and G. D. Irisarri, "Short term Generation Scheduling with Transmission and Environmental Constraints Using An Augmented Lagrangian Relaxation," IEEE Trans. on Power Systems, vol. 10, no. 3, pp. 1294-1301, August 1995.
-
(1995)
IEEE Trans. on Power Systems
, vol.10
, Issue.3
, pp. 1294-1301
-
-
Wang, S.J.1
Shahidehpour, S.M.2
Kirschen, D.S.3
Mokhtari, S.4
Irisarri, G.D.5
-
18
-
-
84888889252
-
-
Aug 12th
-
BC Hydro-Grid Operations & InterUtility Affairs (Aug 12th, 1998) TTC and ATC Calculation Methodology. Available: http://www2.bctransco.com/system/ eng_repts.html
-
(1998)
TTC and ATC Calculation Methodology
-
-
|