메뉴 건너뛰기




Volumn , Issue , 2005, Pages 1751-1764

Intelligent selection of concrete bridge construction methods in Egypt

Author keywords

Analytic Hierarchy Process; Bridge Construction Methods; Concrete Bridges; Decision Support Systems; Egypt; Multicriteria Decision Making

Indexed keywords

DECISION SUPPORT SYSTEMS; HIERARCHICAL SYSTEMS; MAINTENANCE; PRODUCT DESIGN;

EID: 27144503855     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (8)

References (17)
  • 2
    • 33847154901 scopus 로고    scopus 로고
    • Decision model for selection of demolition techniques
    • Elsevier Science Ltd., UK
    • Abdullah, A. and Anumba, C. J. (2002). "Decision Model For Selection of Demolition Techniques." Advances in Building Technology, Elsevier Science Ltd., UK, Vol 2 1671-1679.
    • (2002) Advances in Building Technology , vol.2 , pp. 1671-1679
    • Abdullah, A.1    Anumba, C.J.2
  • 3
    • 0000365630 scopus 로고    scopus 로고
    • Project procurement system selection model
    • ASCE
    • Alhazmi, T. and McCaffer, R. (2000). "Project Procurement System Selection Model." J. Constr. Engrg. and Mgmt., ASCE, 126 (3) 176-184.
    • (2000) J. Constr. Engrg. and Mgmt. , vol.126 , Issue.3 , pp. 176-184
    • Alhazmi, T.1    McCaffer, R.2
  • 6
    • 84993044890 scopus 로고    scopus 로고
    • Utility of consistency measure in the analytic hierarchy process
    • Cheng, E.W.L. and Li, H. (2003). "Utility of consistency measure in the analytic hierarchy process." Construction Innovation, 3 (4) 231-247.
    • (2003) Construction Innovation , vol.3 , Issue.4 , pp. 231-247
    • Cheng, E.W.L.1    Li, H.2
  • 7
    • 0036812939 scopus 로고    scopus 로고
    • Multi-Criteria evaluation model for the selection of architectural consultants
    • Cheung, K. T. and Kuen, J. L. F. (2002). "Multi-Criteria evaluation model for the selection of architectural consultants." Construction Management and Economics, 20 (7) 569-580.
    • (2002) Construction Management and Economics , vol.20 , Issue.7 , pp. 569-580
    • Cheung, K.T.1    Kuen, J.L.F.2
  • 8
    • 0001119781 scopus 로고    scopus 로고
    • Final contractor selection using the analytic hierarchy process
    • Fong, P. S. and Choi, S. K. (2000). "Final contractor selection using the analytic hierarchy process." Construction Management and Economics, 18 (5) 547-557.
    • (2000) Construction Management and Economics , vol.18 , Issue.5 , pp. 547-557
    • Fong, P.S.1    Choi, S.K.2
  • 9
    • 0004554435 scopus 로고    scopus 로고
    • Technology strategy and competitive performance in bridge construction
    • Hampson, K. and Tatum, C.B. (1997). "Technology strategy and competitive performance in bridge construction." Journal of Construction Engineering and Management, 123 (2) 153-161.
    • (1997) Journal of Construction Engineering and Management , vol.123 , Issue.2 , pp. 153-161
    • Hampson, K.1    Tatum, C.B.2
  • 14
    • 84993065116 scopus 로고    scopus 로고
    • Factors affecting construction quality in Egypt: Identification and relative importance
    • Refaat H. (1998) "Factors affecting construction quality in Egypt: Identification and relative importance." Engineering Construction and Architectural Management, 5 (3) 220-227.
    • (1998) Engineering Construction and Architectural Management , vol.5 , Issue.3 , pp. 220-227
    • Refaat, H.1
  • 16
    • 0026918184 scopus 로고
    • Evaluation of advanced construction technology with AHP method
    • Skibniewski, M. J. and Chao, L. (1992). "Evaluation of advanced construction technology with AHP method." ASCE, J. of Constr. Engrg. and Mgmt., 118 (3) 577-593.
    • (1992) ASCE, J. of Constr. Engrg. and Mgmt. , vol.118 , Issue.3 , pp. 577-593
    • Skibniewski, M.J.1    Chao, L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.