Volumn 3644, Issue PART I, 2005, Pages 947-956

Single-machine partial rescheduling with Bi-criterion based on genetic algorithm

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTATIONAL METHODS; COMPUTER SCIENCE; GENETIC ALGORITHMS; INFORMATION TECHNOLOGY; OPTIMIZATION; PROBLEM SOLVING; SCHEDULING; ECONOMIC AND SOCIAL EFFECTS; EFFICIENCY; JOB SHOP SCHEDULING;

EID: 27144433219     PISSN: 03029743     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1007/11538059_98     Document Type: Conference Paper
Times cited : (6)

References (11)
  • 1
    • 0034326104 scopus 로고    scopus 로고
    • Analysis of reactive scheduling problems in a job shop environment
    • Sabuncuoglu, I., Bayiz, M.: Analysis of Reactive Scheduling Problems in a Job Shop Environment. European Journal of Operational Research. 126(2000) 567-586
    • (2000) European Journal of Operational Research , vol.126 , pp. 567-586
    • Sabuncuoglu, I.1    Bayiz, M.2
  • 2
    • 0027224847 scopus 로고
    • One-machine rescheduling heuristics with efficiency and stability as criteria
    • Wu, S.D., Storer, R.H., Chang, P.C.: One-machine Rescheduling Heuristics with Efficiency and Stability as Criteria. Computers in Operations Research. 20(1993) 1-14
    • (1993) Computers in Operations Research , vol.20 , pp. 1-14
    • Wu, S.D.1    Storer, R.H.2    Chang, P.C.3
  • 3
    • 13844266916 scopus 로고    scopus 로고
    • Terminal penalty rolling scheduling based on an initial schedule for single-machine scheduling problem
    • Wang, B., Xi, Y.G., Gu, H.Y.: Terminal Penalty Rolling Scheduling Based on an Initial Schedule for Single-machine Scheduling Problem. Computers and Operations Research. 32(2005) 3059-3072
    • (2005) Computers and Operations Research , vol.32 , pp. 3059-3072
    • Wang, B.1    Xi, Y.G.2    Gu, H.Y.3
  • 4
    • 17644381257 scopus 로고    scopus 로고
    • An improved rolling horizon procedure for single-machine scheduling with release times
    • Wang, B., Xi, Y.G., Gu, H.Y.: An Improved Rolling Horizon Procedure for Single-machine Scheduling with Release Times. Kongzhi yu Juece. 20(2005) 257-260
    • (2005) Kongzhi yu Juece , vol.20 , pp. 257-260
    • Wang, B.1    Xi, Y.G.2    Gu, H.Y.3
  • 7
    • 0000229534 scopus 로고
    • Match-up scheduling with multiple resources, release dates and disruption
    • Mittenehal J and Noon C E
    • Bean, J.C., Birge, J.R.: Mittenehal J and Noon C E Match-up Scheduling with Multiple Resources, Release Dates and Disruption. Operations Research. 39(1991) 470-483
    • (1991) Operations Research , vol.39 , pp. 470-483
    • Bean, J.C.1    Birge, J.R.2
  • 10
    • 0031506199 scopus 로고    scopus 로고
    • Rolling horizon procedures for the single machine deterministic total completion time scheduling problem with release dates
    • Chand, S., Traub, R., Uzsoy, R.: Rolling Horizon Procedures for the Single Machine Deterministic Total Completion Time Scheduling Problem with Release Dates. Annals of Operations Research. 11(1997) 115-125
    • (1997) Annals of Operations Research , vol.11 , pp. 115-125
    • Chand, S.1    Traub, R.2    Uzsoy, R.3
  • 11
    • 0019342692 scopus 로고
    • An algorithm for single machine sequencing with release dates to minimize total weighted completion time
    • Hariri, A.M.A., Potts, C.N.: An Algorithm for Single Machine Sequencing with Release Dates to Minimize Total Weighted Completion Time. Discrete Applied Mathematics. 11(1983) 99-109
    • (1983) Discrete Applied Mathematics , vol.11 , pp. 99-109
    • Hariri, A.M.A.1    Potts, C.N.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.