메뉴 건너뛰기




Volumn 21, Issue 4, 2005, Pages 179-188

Nature of engineering consulting projects

Author keywords

Consulting firms; Costs; Data collection; Engineering firms; Productivity; Profits

Indexed keywords

COSTS; DATA ACQUISITION; ENGINEERING RESEARCH; INFORMATION ANALYSIS; PROBLEM SOLVING; PRODUCTIVITY; UNCERTAIN SYSTEMS;

EID: 26644465082     PISSN: 0742597X     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0742-597X(2005)21:4(179)     Document Type: Article
Times cited : (20)

References (25)
  • 1
    • 0028467091 scopus 로고
    • Improving project management of design
    • Anderson, S. D., and Tucker, R. L. (1994). "Improving project management of design." J. Manage. Eng., 10(4), 35-44.
    • (1994) J. Manage. Eng. , vol.10 , Issue.4 , pp. 35-44
    • Anderson, S.D.1    Tucker, R.L.2
  • 5
    • 0036162657 scopus 로고    scopus 로고
    • Reasons for cost and schedule increase for engineering design projects
    • Chang, A. S. (2002), "Reasons for cost and schedule increase for engineering design projects." J. Manage. Eng., 18(1), 29-36.
    • (2002) J. Manage. Eng. , vol.18 , Issue.1 , pp. 29-36
    • Chang, A.S.1
  • 6
    • 0035273872 scopus 로고    scopus 로고
    • Work time model for engineers
    • Chang, A. S. (2001). "Work time model for engineers." J. Constr. Eng. Manage., 127(2), 163-172.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.2 , pp. 163-172
    • Chang, A.S.1
  • 8
    • 0001229241 scopus 로고
    • Organizational information requirements, media richness and structural design
    • Daft, R. L., and Lengel, R. H. (1986). "Organizational information requirements, media richness and structural design." Manage. Sci., 32(5), 554-571.
    • (1986) Manage. Sci. , vol.32 , Issue.5 , pp. 554-571
    • Daft, R.L.1    Lengel, R.H.2
  • 9
    • 0005176421 scopus 로고
    • Construction industry attitudes toward disputes and prevention/resolution techniques
    • Diekmann, J. E., and Girard, M. (1995). "Construction industry attitudes toward disputes and prevention/resolution techniques." Proj. Manage. J., 26(1), 3-11.
    • (1995) Proj. Manage. J. , vol.26 , Issue.1 , pp. 3-11
    • Diekmann, J.E.1    Girard, M.2
  • 10
    • 0026131257 scopus 로고
    • Management of engineering/design phase
    • Eidin, N. N. (1991). "Management of engineering/design phase." J. Manage. Eng., 117(1), 163-175.
    • (1991) J. Manage. Eng. , vol.117 , Issue.1 , pp. 163-175
    • Eidin, N.N.1
  • 12
    • 0035392368 scopus 로고    scopus 로고
    • Improving design coordination for building projects. I: Information model
    • Hegazy, T., Zaneldin, E., and Grierson, D. (2001). "Improving design coordination for building projects. I: Information model." J. Constr. Eng. Manage., 127(4), 322-329.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.4 , pp. 322-329
    • Hegazy, T.1    Zaneldin, E.2    Grierson, D.3
  • 14
    • 0011466189 scopus 로고    scopus 로고
    • Adaptability of information classification systems for civil works
    • Kang, L. S., and Paulson, B. C. (1997). "Adaptability of information classification systems for civil works." J. Constr. Eng. Manage., 123(4), 419-426.
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.4 , pp. 419-426
    • Kang, L.S.1    Paulson, B.C.2
  • 16
    • 0033358240 scopus 로고    scopus 로고
    • Simulating project work processes and organizations: Toward a micro-contingency theory of organizational design
    • Levitt, R. E., Thomsen, J., Christiansen, T. R., Kunz. J. C., Jin, Y., and Nass, C. (1999). "Simulating project work processes and organizations: Toward a micro-contingency theory of organizational design." Manage. Sci., 45(11), 1479-1495.
    • (1999) Manage. Sci. , vol.45 , Issue.11 , pp. 1479-1495
    • Levitt, R.E.1    Thomsen, J.2    Christiansen, T.R.3    Kunz, J.C.4    Jin, Y.5    Nass, C.6
  • 17
    • 0141959788 scopus 로고    scopus 로고
    • Innovation and performance in engineering design
    • Salter, A., and Torbett, R. (2003). "Innovation and performance in engineering design." Constr. Manage. Econom., 21(6), 573-580.
    • (2003) Constr. Manage. Econom. , vol.21 , Issue.6 , pp. 573-580
    • Salter, A.1    Torbett, R.2
  • 18
  • 19
    • 21144480088 scopus 로고
    • Information processing in strategie alliance building: A multiple-case approach
    • Thomas, J. B., and Trevino, L. K. (1993). "Information processing in strategie alliance building: A multiple-case approach." J. Manage. Stud. (Oxford), 30(5), 779-814.
    • (1993) J. Manage. Stud. (Oxford) , vol.30 , Issue.5 , pp. 779-814
    • Thomas, J.B.1    Trevino, L.K.2
  • 21
    • 0001163670 scopus 로고
    • Technical communication in R & D laboratories: The impact of project work characteristics
    • Tushman, M. L. (1978). "Technical communication in R & D laboratories: The impact of project work characteristics." Acad. Manage J., 21(4), 624-645.
    • (1978) Acad. Manage J. , vol.21 , Issue.4 , pp. 624-645
    • Tushman, M.L.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.