-
1
-
-
0028467091
-
Improving project management of design
-
Anderson, S. D., and Tucker, R. L. (1994). "Improving project management of design." J. Manage. Eng., 10(4), 35-44.
-
(1994)
J. Manage. Eng.
, vol.10
, Issue.4
, pp. 35-44
-
-
Anderson, S.D.1
Tucker, R.L.2
-
2
-
-
0008236248
-
-
Transportation Research Board, National Research Council, Washington, D. C.
-
Bramble, B. B., and Cipollini, M. D. (1995). National cooperative highway research program synthesis of Highway Practice 214: Resolution of disputes to avoid construction claims, Transportation Research Board, National Research Council, Washington, D. C.
-
(1995)
National Cooperative Highway Research Program Synthesis of Highway Practice 214: Resolution of Disputes to Avoid Construction Claims
-
-
Bramble, B.B.1
Cipollini, M.D.2
-
4
-
-
0008226836
-
-
Rep., to The Construction Industry Institute, the University of Texas, Austin, Tex.
-
Chalabi, A. F., Salazar, G. F., and Beaudin, B. J. (1986). "Defining and evaluating input variables impacting design effectiveness. Research Phase I." Rep., to The Construction Industry Institute, the University of Texas, Austin, Tex.
-
(1986)
Defining and Evaluating Input Variables Impacting Design Effectiveness. Research Phase I
-
-
Chalabi, A.F.1
Salazar, G.F.2
Beaudin, B.J.3
-
5
-
-
0036162657
-
Reasons for cost and schedule increase for engineering design projects
-
Chang, A. S. (2002), "Reasons for cost and schedule increase for engineering design projects." J. Manage. Eng., 18(1), 29-36.
-
(2002)
J. Manage. Eng.
, vol.18
, Issue.1
, pp. 29-36
-
-
Chang, A.S.1
-
6
-
-
0035273872
-
Work time model for engineers
-
Chang, A. S. (2001). "Work time model for engineers." J. Constr. Eng. Manage., 127(2), 163-172.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.2
, pp. 163-172
-
-
Chang, A.S.1
-
8
-
-
0001229241
-
Organizational information requirements, media richness and structural design
-
Daft, R. L., and Lengel, R. H. (1986). "Organizational information requirements, media richness and structural design." Manage. Sci., 32(5), 554-571.
-
(1986)
Manage. Sci.
, vol.32
, Issue.5
, pp. 554-571
-
-
Daft, R.L.1
Lengel, R.H.2
-
9
-
-
0005176421
-
Construction industry attitudes toward disputes and prevention/resolution techniques
-
Diekmann, J. E., and Girard, M. (1995). "Construction industry attitudes toward disputes and prevention/resolution techniques." Proj. Manage. J., 26(1), 3-11.
-
(1995)
Proj. Manage. J.
, vol.26
, Issue.1
, pp. 3-11
-
-
Diekmann, J.E.1
Girard, M.2
-
10
-
-
0026131257
-
Management of engineering/design phase
-
Eidin, N. N. (1991). "Management of engineering/design phase." J. Manage. Eng., 117(1), 163-175.
-
(1991)
J. Manage. Eng.
, vol.117
, Issue.1
, pp. 163-175
-
-
Eidin, N.N.1
-
12
-
-
0035392368
-
Improving design coordination for building projects. I: Information model
-
Hegazy, T., Zaneldin, E., and Grierson, D. (2001). "Improving design coordination for building projects. I: Information model." J. Constr. Eng. Manage., 127(4), 322-329.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.4
, pp. 322-329
-
-
Hegazy, T.1
Zaneldin, E.2
Grierson, D.3
-
13
-
-
0005127535
-
-
Rep. No. 20 to the Construction Industry Institute, Austin, Tex., March
-
Ibbs, C. W., Back, W. E., Kim, J. J., Wall, D. E., DelaGarza, J. M., Hassanein, M. A., Schran, S. M., and Twardock, R. K. (1986). "Determining the impact of various construction contract types and clauses on project performance." Rep. No. 20 to the Construction Industry Institute, Austin, Tex., March.
-
(1986)
Determining the Impact of Various Construction Contract Types and Clauses on Project Performance
-
-
Ibbs, C.W.1
Back, W.E.2
Kim, J.J.3
Wall, D.E.4
DelaGarza, J.M.5
Hassanein, M.A.6
Schran, S.M.7
Twardock, R.K.8
-
14
-
-
0011466189
-
Adaptability of information classification systems for civil works
-
Kang, L. S., and Paulson, B. C. (1997). "Adaptability of information classification systems for civil works." J. Constr. Eng. Manage., 123(4), 419-426.
-
(1997)
J. Constr. Eng. Manage.
, vol.123
, Issue.4
, pp. 419-426
-
-
Kang, L.S.1
Paulson, B.C.2
-
16
-
-
0033358240
-
Simulating project work processes and organizations: Toward a micro-contingency theory of organizational design
-
Levitt, R. E., Thomsen, J., Christiansen, T. R., Kunz. J. C., Jin, Y., and Nass, C. (1999). "Simulating project work processes and organizations: Toward a micro-contingency theory of organizational design." Manage. Sci., 45(11), 1479-1495.
-
(1999)
Manage. Sci.
, vol.45
, Issue.11
, pp. 1479-1495
-
-
Levitt, R.E.1
Thomsen, J.2
Christiansen, T.R.3
Kunz, J.C.4
Jin, Y.5
Nass, C.6
-
17
-
-
0141959788
-
Innovation and performance in engineering design
-
Salter, A., and Torbett, R. (2003). "Innovation and performance in engineering design." Constr. Manage. Econom., 21(6), 573-580.
-
(2003)
Constr. Manage. Econom.
, vol.21
, Issue.6
, pp. 573-580
-
-
Salter, A.1
Torbett, R.2
-
18
-
-
0008194804
-
-
W. J. Palmer, J. M. Maloney, and J. L. Heffron III, Eds., McGraw-Hill, New York
-
Smith, M. A. (1996). Construction insurance, bonding, and risk management, W. J. Palmer, J. M. Maloney, and J. L. Heffron III, Eds., McGraw-Hill, New York.
-
(1996)
Construction Insurance, Bonding, and Risk Management
-
-
Smith, M.A.1
-
19
-
-
21144480088
-
Information processing in strategie alliance building: A multiple-case approach
-
Thomas, J. B., and Trevino, L. K. (1993). "Information processing in strategie alliance building: A multiple-case approach." J. Manage. Stud. (Oxford), 30(5), 779-814.
-
(1993)
J. Manage. Stud. (Oxford)
, vol.30
, Issue.5
, pp. 779-814
-
-
Thomas, J.B.1
Trevino, L.K.2
-
21
-
-
0001163670
-
Technical communication in R & D laboratories: The impact of project work characteristics
-
Tushman, M. L. (1978). "Technical communication in R & D laboratories: The impact of project work characteristics." Acad. Manage J., 21(4), 624-645.
-
(1978)
Acad. Manage J.
, vol.21
, Issue.4
, pp. 624-645
-
-
Tushman, M.L.1
-
24
-
-
0003594152
-
-
Sage, Newbury Park, Calif.
-
Weller, S. C., and Romney, A. K. (1988). Systematic data collection, Sage, Newbury Park, Calif.
-
(1988)
Systematic Data Collection
-
-
Weller, S.C.1
Romney, A.K.2
|