|
Volumn 33, Issue 5, 2006, Pages 1326-1344
|
A heuristic approach for tow-machine no-wait flowshop scheduling with due dates and class setups
|
Author keywords
Flowshop scheduling; Heuristic; Job class setups; Maximum lateness; No wait
|
Indexed keywords
COMPUTATIONAL METHODS;
HEURISTIC METHODS;
JOB ANALYSIS;
FLOWSHOP SCHEDULING;
HEURISTIC;
JOB CLASS SETUPS;
MAXIMUM LATENESS;
NO-WAIT;
SCHEDULING;
|
EID: 26444474118
PISSN: 03050548
EISSN: None
Source Type: Journal
DOI: 10.1016/j.cor.2004.09.018 Document Type: Article |
Times cited : (24)
|
References (10)
|