메뉴 건너뛰기




Volumn 32, Issue 5, 2004, Pages 333-344

Real-time schedule adjustment decisions: A case study

Author keywords

Case study; Labor scheduling; Schedule adjustment decision; Service operations

Indexed keywords

EMPLOYMENT; HUMAN RESOURCE MANAGEMENT;

EID: 2642559423     PISSN: 03050483     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.omega.2004.01.002     Document Type: Article
Times cited : (12)

References (28)
  • 2
    • 0028496547 scopus 로고
    • Solving large-scale tour scheduling problems
    • Jarrah A.I. Bard J.F. deSilva A.H. Solving large-scale tour scheduling problems Management Science 40 9 1994 1124-1144
    • (1994) Management Science , vol.40 , Issue.9 , pp. 1124-1144
    • Jarrah, A.I.1    Bard, J.F.2    deSilva, A.H.3
  • 3
    • 0005326952 scopus 로고    scopus 로고
    • Assigning telephone operations to shifts at New Brunswick telephone company
    • Thompson G.M. Assigning telephone operations to shifts at New Brunswick telephone company Interfaces 27 4 1997 1-11
    • (1997) Interfaces , vol.27 , Issue.4 , pp. 1-11
    • Thompson, G.M.1
  • 4
    • 0009953778 scopus 로고
    • Improving bank operations: A case study at Banc Ohio/Ohio National Bank
    • Mabert V.A. McKenzie J.P. Improving bank operations: a case study at Banc Ohio/Ohio National Bank OMEGA 8 3 1980 345-354
    • (1980) OMEGA , vol.8 , Issue.3 , pp. 345-354
    • Mabert, V.A.1    McKenzie, J.P.2
  • 5
    • 0034479946 scopus 로고    scopus 로고
    • Optimal models for meal-break and start-time flexibility in continuous tour scheduling
    • Brusco M.J. Jacobs L.W. Optimal models for meal-break and start-time flexibility in continuous tour scheduling Management Science 46 12 2000 1630-1641
    • (2000) Management Science , vol.46 , Issue.12 , pp. 1630-1641
    • Brusco, M.J.1    Jacobs, L.W.2
  • 6
    • 0001296956 scopus 로고
    • Sufficient working subsets for the tour scheduling problem
    • Easton F.F. Rossin D.F. Sufficient working subsets for the tour scheduling problem Management Science 37 11 1991 1441-1451
    • (1991) Management Science , vol.37 , Issue.11 , pp. 1441-1451
    • Easton, F.F.1    Rossin, D.F.2
  • 7
    • 0040098254 scopus 로고    scopus 로고
    • An integrated labor-management system for Taco Bell
    • Hueter J. Swart W. An integrated labor-management system for Taco Bell Interfaces 28 1 1998 75-91
    • (1998) Interfaces , vol.28 , Issue.1 , pp. 75-91
    • Hueter, J.1    Swart, W.2
  • 8
    • 4243682183 scopus 로고    scopus 로고
    • An efficiency drive: Fast-food lanes, equipped with timers, get even faster
    • May 18
    • Ordonez J. An efficiency drive: fast-food lanes, equipped with timers, get even faster. Wall Street Journal, May 18, 2000.
    • (2000) Wall Street Journal
    • Ordonez, J.1
  • 9
    • 0005278073 scopus 로고
    • Ohio Valley National Bank. Cases in manufacturing and service systems management
    • Englewood Cliffs, NJ: Prentice-Hall
    • Mabert V.A. Ohio Valley National Bank. Cases in manufacturing and service systems management 1991 Prentice-Hall Englewood Cliffs, NJ
    • (1991)
    • Mabert, V.A.1
  • 10
    • 0040820263 scopus 로고
    • Management science improves fast-food operations
    • Love R.R. Hoey J.M. Management science improves fast-food operations Interfaces 20 2 1990 21-29
    • (1990) Interfaces , vol.20 , Issue.2 , pp. 21-29
    • Love, R.R.1    Hoey, J.M.2
  • 11
    • 14544295400 scopus 로고    scopus 로고
    • A worker-paced line flow process and a service factory: Burger King Restaurant
    • Noblesville, Indiana, in Plant and Service Tours in Operations Management. Englewood Cliffs, NJ: Prentice-Hall
    • Schmenner RW. A worker-paced line flow process and a service factory: Burger King Restaurant, Route 37, Noblesville, Indiana, in Plant and Service Tours in Operations Management. Englewood Cliffs, NJ: Prentice-Hall; 1998. p. 140-61.
    • (1998) Route , vol.37 , pp. 140-161
    • Schmenner, R.W.1
  • 13
  • 14
    • 2642584246 scopus 로고    scopus 로고
    • Labor scheduling: Part 4 controlling workforce schedules in real time
    • Thompson G.M. Labor scheduling: Part 4 controlling workforce schedules in real time Cornell Hotel and Restaurant Administration Quarterly 40 3 1999 85-96
    • (1999) Cornell Hotel and Restaurant Administration Quarterly , vol.40 , Issue.3 , pp. 85-96
    • Thompson, G.M.1
  • 16
    • 84990613833 scopus 로고
    • The influences of user characteristics on performance in a logistics DSS application
    • Swink M. The influences of user characteristics on performance in a logistics DSS application Decision Sciences 26 4 1995 503-529
    • (1995) Decision Sciences , vol.26 , Issue.4 , pp. 503-529
    • Swink, M.1
  • 17
    • 38249019267 scopus 로고
    • Measuring the impact of part-time workers in service organizations
    • Mabert V.A. Showalter M.J. Measuring the impact of part-time workers in service organizations Journal of Operations Management 9 2 1990 209-229
    • (1990) Journal of Operations Management , vol.9 , Issue.2 , pp. 209-229
    • Mabert, V.A.1    Showalter, M.J.2
  • 18
    • 0032665038 scopus 로고    scopus 로고
    • Value of information in capacitated supply chains
    • Gavirneni S. Kapuscinski R. Tayur S. Value of information in capacitated supply chains Management Science 45 1 1999 16-24
    • (1999) Management Science , vol.45 , Issue.1 , pp. 16-24
    • Gavirneni, S.1    Kapuscinski, R.2    Tayur, S.3
  • 19
    • 0036833155 scopus 로고    scopus 로고
    • The value of information used in inventory control of a make-to-order inventory-production system
    • He Q. Jewkes E.M. Buzacott J. The value of information used in inventory control of a make-to-order inventory-production system IIE Transactions 34 2002 999-1013
    • (2002) IIE Transactions , vol.34 , pp. 999-1013
    • He, Q.1    Jewkes, E.M.2    Buzacott, J.3
  • 21
    • 0003708762 scopus 로고
    • Smoothing, forecasting, and prediction of discrete time series
    • Englewood Cliffs, NJ: Prentice-Hall
    • Brown R. Smoothing, forecasting, and prediction of discrete time series 1963 Prentice-Hall Englewood Cliffs, NJ
    • (1963)
    • Brown, R.1
  • 23
    • 84984420155 scopus 로고
    • Automatic monitoring of forecast errors
    • Gardner E.S. Automatic monitoring of forecast errors Journal of Forecasting 2 1983 1-21
    • (1983) Journal of Forecasting , vol.2 , pp. 1-21
    • Gardner, E.S.1
  • 25
    • 84990587419 scopus 로고
    • Labor utilization effects of labor schedule flexibility alternatives in a tour scheduling environment
    • Jacobs L.W. Bechtold S.E. Labor utilization effects of labor schedule flexibility alternatives in a tour scheduling environment Decision Sciences 24 1993 148-166
    • (1993) Decision Sciences , vol.24 , pp. 148-166
    • Jacobs, L.W.1    Bechtold, S.E.2
  • 26
    • 0003093902 scopus 로고
    • Scheduling flexibility in the service sector: A postal case study
    • Malhotra M.K. Ritzman L.P. Scheduling flexibility in the service sector: a postal case study Production and Operations Management 3 2 1994 100-117
    • (1994) Production and Operations Management , vol.3 , Issue.2 , pp. 100-117
    • Malhotra, M.K.1    Ritzman, L.P.2
  • 27
    • 85169188091 scopus 로고    scopus 로고
    • Real time work schedule adjustment in a quick service operation system
    • Unpublished dissertation, Indiana University
    • Hur D. Real time work schedule adjustment in a quick service operation system. Unpublished dissertation, Indiana University, 2001.
    • (2001)
    • Hur, D.1
  • 28
    • 0001296905 scopus 로고
    • Consistency and optimality in managerial decision making
    • Bowman E.H. Consistency and optimality in managerial decision making Management Sciences 9 2 1963 310-321
    • (1963) Management Sciences , vol.9 , Issue.2 , pp. 310-321
    • Bowman, E.H.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.