메뉴 건너뛰기




Volumn , Issue , 2004, Pages 401-414

A study utilizing vane yield rheometry to predict optimum thickener performance across a range of laterite nickel ores for the ravensthorpe nickel project

Author keywords

Rheograms; Thickening; Vane Yield Stress

Indexed keywords

GEOCHEMISTRY; NEWTONIAN FLOW; PRECIPITATION (CHEMICAL); PROJECT MANAGEMENT; RHEOLOGY; RHEOMETERS; VISCOSITY; YIELD STRESS;

EID: 2642540934     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (6)

References (6)
  • 2
    • 2642546093 scopus 로고    scopus 로고
    • Report prepared by Rheochem Ltd, 0980, March
    • Hatch Minproc Ravensthorpe Joint Venture, Technical Review of Rheology Testwork, (Report prepared by Rheochem Ltd, 0980, March 2003).
    • (2003) Technical Review of Rheology Testwork
  • 5
    • 2642574573 scopus 로고    scopus 로고
    • Report prepared by Rheochem Ltd, 1065, October
    • BHP Billiton, Phase 1 Vane Rheology Analysis Dilution, (Report prepared by Rheochem Ltd, 1065, October 2001).
    • (2001) Phase 1 Vane Rheology Analysis Dilution


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.