Evolutionary optimization of resource allocation in repetitive construction schedules

Author keywords

Optimization; Repetitive construction schedules; Resource allocation problem

Indexed keywords


EID: 25444509502     PISSN: 14006529     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (37)

References (18)
  • 1
    • 0025598377 scopus 로고
    • Formal development of-line balance technique
    • ASCE
    • Al Sarraj, Z. M. (1990). "Formal development of-Line Balance Technique." J. Constr. Engrg. and Mgmt., ASCE, 116(4), 689-704.
    • (1990) J. Constr. Engrg. and Mgmt. , vol.116 , Issue.4 , pp. 689-704
    • Al Sarraj, Z.M.1
  • 2
    • 0022778511 scopus 로고
    • Line of-balance scheduling in pavement construction
    • ASCE
    • Arditi, D., and Albulak, M. Z. (1986). "Line of-Balance Scheduling in Pavement Construction." J. Constr. Engrg. and Mgmt., ASCE, 112(3), 411-424.
    • (1986) J. Constr. Engrg. and Mgmt. , vol.112 , Issue.3 , pp. 411-424
    • Arditi, D.1    Albulak, M.Z.2
  • 3
    • 0019030430 scopus 로고
    • Simulation of repetitive-unit construction
    • ASCE
    • Ashley, D. B. (1980). "Simulation of Repetitive-Unit Construction." J. Constr. Engrg. and Mgmt., ASCE, 106(2), 185-194.
    • (1980) J. Constr. Engrg. and Mgmt. , vol.106 , Issue.2 , pp. 185-194
    • Ashley, D.B.1
  • 4
    • 0001096735 scopus 로고
    • Genetic algorithms and random keys for sequencing and optimization
    • Beans, J. C. (1994). "Genetic Algorithms and Random Keys for Sequencing and Optimization." ORSA J. on Comp., 6(2), 154-160.
    • (1994) ORSA J. on Comp. , vol.6 , Issue.2 , pp. 154-160
    • Beans, J.C.1
  • 5
    • 0019064535 scopus 로고
    • Construction planning - Beyond the critical path
    • ASCE
    • Birrell, G. S. (1980). "Construction Planning - Beyond the Critical Path." J. Constr. Engrg. and Mgmt., ASCE, 106(3), 389-407.
    • (1980) J. Constr. Engrg. and Mgmt. , vol.106 , Issue.3 , pp. 389-407
    • Birrell, G.S.1
  • 7
    • 0028409229 scopus 로고
    • Scheduling and control of linear projects
    • Ottawa
    • Eldin, N. N., and Senouci, A. B. (1994). "Scheduling and Control of Linear Projects." Can. J. Civ. Engrg., Ottawa, 21, 219-230.
    • (1994) Can. J. Civ. Engrg. , vol.21 , pp. 219-230
    • Eldin, N.N.1    Senouci, A.B.2
  • 8
    • 25444505195 scopus 로고    scopus 로고
    • Resource-driven scheduling of repetitive activities on construction projects
    • ASCE
    • El-Rayes, K., and Moselhi, O. (1998). "Resource-Driven Scheduling of Repetitive Activities on Construction Projects." J. Constr. Engrg. and Mgmt., ASCE, 107(2), 18-27.
    • (1998) J. Constr. Engrg. and Mgmt. , vol.107 , Issue.2 , pp. 18-27
    • El-Rayes, K.1    Moselhi, O.2
  • 9
    • 25444516616 scopus 로고    scopus 로고
    • Optimizing resource utilization for repetitive construction projects
    • ASCE
    • El-Rayes, K., and Moselhi, O. (2001). "Optimizing Resource Utilization for Repetitive Construction Projects." J. Constr. Engrg. and Mgmt., ASCE, 16(4), 433-446.
    • (2001) J. Constr. Engrg. and Mgmt. , vol.16 , Issue.4 , pp. 433-446
    • El-Rayes, K.1    Moselhi, O.2
  • 12
    • 0019583188 scopus 로고
    • Linear scheduling method for highway construction
    • ASCE
    • Johnston, D. W. (1981). "Linear Scheduling Method for Highway Construction." J. Constr.Div., ASCE, 107(2), 247-261.
    • (1981) J. Constr.Div. , vol.107 , Issue.2 , pp. 247-261
    • Johnston, D.W.1
  • 13
    • 0022128947 scopus 로고
    • SIREN: A repetitive construction simulation model
    • ASCE
    • Kavanagh, D. P. (1985). "SIREN: A Repetitive Construction Simulation Model." J. Constr.Div., ASCE, 111(3), 308-323.
    • (1985) J. Constr.Div. , vol.111 , Issue.3 , pp. 308-323
    • Kavanagh, D.P.1
  • 14
    • 0022076783 scopus 로고
    • Network scheduling variations for repetitive work
    • ASCE
    • O'Brien, J. J., Kreitzberg, F. C., and Mikes, W. F. (1985). "Network Scheduling Variations for Repetitive work." J. Constr. Engrg. and Mgmt., ASCE, 111(2), 105-116.
    • (1985) J. Constr. Engrg. and Mgmt. , vol.111 , Issue.2 , pp. 105-116
    • O'Brien, J.J.1    Kreitzberg, F.C.2    Mikes, W.F.3
  • 15
    • 0025447970 scopus 로고
    • RPM: Repetitive project modeling
    • ASCE
    • Reda, R. M. (1990). "RPM: Repetitive Project Modeling." J. Constr. Engrg. and Mgmt., ASCE, 116(2), 316-330.
    • (1990) J. Constr. Engrg. and Mgmt. , vol.116 , Issue.2 , pp. 316-330
    • Reda, R.M.1
  • 16
    • 0023984188 scopus 로고
    • Extensions to linear scheduling optimization
    • ASCE
    • Russell, A. D., and Caselton, W. F. (1988). "Extensions to Linear Scheduling Optimization." J. Constr. Div., ASCE, 114(1), 36-52.
    • (1988) J. Constr. Div. , vol.114 , Issue.1 , pp. 36-52
    • Russell, A.D.1    Caselton, W.F.2
  • 17
    • 0027607475 scopus 로고
    • New generation of planning structures
    • ASCE
    • Russell, A. D., and Wong, W. C. M. (1993). "New Generation of Planning Structures." J. Constr. Div., ASCE, 119(2), 196-214
    • (1993) J. Constr. Div. , vol.119 , Issue.2 , pp. 196-214
    • Russell, A.D.1    Wong, W.C.M.2
  • 18
    • 0030085580 scopus 로고    scopus 로고
    • A time-cost trade-off algorithm for nonserial linear projecrs
    • Ottawa
    • Senouci, A., and Eldin, N. (1996). "A Time-Cost Trade-Off Algorithm for Nonserial Linear Projecrs." Can. J. Civ. Engrg., Ottawa, 23, 134-149.
    • (1996) Can. J. Civ. Engrg. , vol.23 , pp. 134-149
    • Senouci, A.1    Eldin, N.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.