Formal development of-line balance technique
-
ASCE
-
Al Sarraj, Z. M. (1990). "Formal development of-Line Balance Technique." J. Constr. Engrg. and Mgmt., ASCE, 116(4), 689-704.
-
(1990)
J. Constr. Engrg. and Mgmt.
, vol.116
, Issue.4
, pp. 689-704
-
-
Al Sarraj, Z.M.1
-
2
-
-
0022778511
-
Line of-balance scheduling in pavement construction
-
ASCE
-
Arditi, D., and Albulak, M. Z. (1986). "Line of-Balance Scheduling in Pavement Construction." J. Constr. Engrg. and Mgmt., ASCE, 112(3), 411-424.
-
(1986)
J. Constr. Engrg. and Mgmt.
, vol.112
, Issue.3
, pp. 411-424
-
-
Arditi, D.1
Albulak, M.Z.2
-
3
-
-
0019030430
-
Simulation of repetitive-unit construction
-
ASCE
-
Ashley, D. B. (1980). "Simulation of Repetitive-Unit Construction." J. Constr. Engrg. and Mgmt., ASCE, 106(2), 185-194.
-
(1980)
J. Constr. Engrg. and Mgmt.
, vol.106
, Issue.2
, pp. 185-194
-
-
Ashley, D.B.1
-
4
-
-
0001096735
-
Genetic algorithms and random keys for sequencing and optimization
-
Beans, J. C. (1994). "Genetic Algorithms and Random Keys for Sequencing and Optimization." ORSA J. on Comp., 6(2), 154-160.
-
(1994)
ORSA J. on Comp.
, vol.6
, Issue.2
, pp. 154-160
-
-
Beans, J.C.1
-
5
-
-
0019064535
-
Construction planning - Beyond the critical path
-
ASCE
-
Birrell, G. S. (1980). "Construction Planning - Beyond the Critical Path." J. Constr. Engrg. and Mgmt., ASCE, 106(3), 389-407.
-
(1980)
J. Constr. Engrg. and Mgmt.
, vol.106
, Issue.3
, pp. 389-407
-
-
Birrell, G.S.1
-
6
-
-
0022917749
-
Application of linear scheduling
-
ASCE
-
Chrzanowski, E. N. Jr., and Johnston, D. W (1986). "Application of Linear Scheduling." J. Constr. Engrg. and Mgmt., ASCE, 112(4), 476-491.
-
(1986)
J. Constr. Engrg. and Mgmt.
, vol.112
, Issue.4
, pp. 476-491
-
-
Chrzanowski Jr., E.N.1
Johnston, D.W.2
-
7
-
-
0028409229
-
Scheduling and control of linear projects
-
Ottawa
-
Eldin, N. N., and Senouci, A. B. (1994). "Scheduling and Control of Linear Projects." Can. J. Civ. Engrg., Ottawa, 21, 219-230.
-
(1994)
Can. J. Civ. Engrg.
, vol.21
, pp. 219-230
-
-
Eldin, N.N.1
Senouci, A.B.2
-
8
-
-
25444505195
-
Resource-driven scheduling of repetitive activities on construction projects
-
ASCE
-
El-Rayes, K., and Moselhi, O. (1998). "Resource-Driven Scheduling of Repetitive Activities on Construction Projects." J. Constr. Engrg. and Mgmt., ASCE, 107(2), 18-27.
-
(1998)
J. Constr. Engrg. and Mgmt.
, vol.107
, Issue.2
, pp. 18-27
-
-
El-Rayes, K.1
Moselhi, O.2
-
9
-
-
25444516616
-
Optimizing resource utilization for repetitive construction projects
-
ASCE
-
El-Rayes, K., and Moselhi, O. (2001). "Optimizing Resource Utilization for Repetitive Construction Projects." J. Constr. Engrg. and Mgmt., ASCE, 16(4), 433-446.
-
(2001)
J. Constr. Engrg. and Mgmt.
, vol.16
, Issue.4
, pp. 433-446
-
-
El-Rayes, K.1
Moselhi, O.2
-
11
-
-
0003722376
-
-
Addison-Wesley, Reading, Mass.
-
Goldberg, D. E. (1989). "Genetic Algorithm in Search, Optimization, and Machine Learning, Addison-Wesley, Reading, Mass.
-
(1989)
Genetic Algorithm in Search, Optimization, and Machine Learning
-
-
Goldberg, D.E.1
-
12
-
-
0019583188
-
Linear scheduling method for highway construction
-
ASCE
-
Johnston, D. W. (1981). "Linear Scheduling Method for Highway Construction." J. Constr.Div., ASCE, 107(2), 247-261.
-
(1981)
J. Constr.Div.
, vol.107
, Issue.2
, pp. 247-261
-
-
Johnston, D.W.1
-
13
-
-
0022128947
-
SIREN: A repetitive construction simulation model
-
ASCE
-
Kavanagh, D. P. (1985). "SIREN: A Repetitive Construction Simulation Model." J. Constr.Div., ASCE, 111(3), 308-323.
-
(1985)
J. Constr.Div.
, vol.111
, Issue.3
, pp. 308-323
-
-
Kavanagh, D.P.1
-
14
-
-
0022076783
-
Network scheduling variations for repetitive work
-
ASCE
-
O'Brien, J. J., Kreitzberg, F. C., and Mikes, W. F. (1985). "Network Scheduling Variations for Repetitive work." J. Constr. Engrg. and Mgmt., ASCE, 111(2), 105-116.
-
(1985)
J. Constr. Engrg. and Mgmt.
, vol.111
, Issue.2
, pp. 105-116
-
-
O'Brien, J.J.1
Kreitzberg, F.C.2
Mikes, W.F.3
-
15
-
-
0025447970
-
RPM: Repetitive project modeling
-
ASCE
-
Reda, R. M. (1990). "RPM: Repetitive Project Modeling." J. Constr. Engrg. and Mgmt., ASCE, 116(2), 316-330.
-
(1990)
J. Constr. Engrg. and Mgmt.
, vol.116
, Issue.2
, pp. 316-330
-
-
Reda, R.M.1
-
16
-
-
0023984188
-
Extensions to linear scheduling optimization
-
ASCE
-
Russell, A. D., and Caselton, W. F. (1988). "Extensions to Linear Scheduling Optimization." J. Constr. Div., ASCE, 114(1), 36-52.
-
(1988)
J. Constr. Div.
, vol.114
, Issue.1
, pp. 36-52
-
-
Russell, A.D.1
Caselton, W.F.2
-
17
-
-
0027607475
-
New generation of planning structures
-
ASCE
-
Russell, A. D., and Wong, W. C. M. (1993). "New Generation of Planning Structures." J. Constr. Div., ASCE, 119(2), 196-214
-
(1993)
J. Constr. Div.
, vol.119
, Issue.2
, pp. 196-214
-
-
Russell, A.D.1
Wong, W.C.M.2
-
18
-
-
0030085580
-
A time-cost trade-off algorithm for nonserial linear projecrs
-
Ottawa
-
Senouci, A., and Eldin, N. (1996). "A Time-Cost Trade-Off Algorithm for Nonserial Linear Projecrs." Can. J. Civ. Engrg., Ottawa, 23, 134-149.
-
(1996)
Can. J. Civ. Engrg.
, vol.23
, pp. 134-149
-
-
Senouci, A.1
Eldin, N.2
|