Constructability analysis in the design firm
-
Arditi, D., Elhassan, A., and Toklu, C. (2002). "Constructability analysis in the design firm." J. Constr. Eng. Manage., 128(2), 117-126.
-
(2002)
J. Constr. Eng. Manage.
, vol.128
, Issue.2
, pp. 117-126
-
-
Arditi, D.1
Elhassan, A.2
Toklu, C.3
-
2
-
-
0003126540
-
Analytical design planning technique: A model for the detailed building process
-
Austin, S., Baldwin, A., and Wasket, P. (1999). "Analytical design planning technique: A model for the detailed building process." Des. Stud., 20(3), 279-296.
-
(1999)
Des. Stud.
, vol.20
, Issue.3
, pp. 279-296
-
-
Austin, S.1
Baldwin, A.2
Wasket, P.3
-
4
-
-
0006810637
-
-
CII Publication 34-1, Austin, Tex.
-
Construction Industry Institute (CII). (1993). "Constructability implementation guide." CII Publication 34-1, Austin, Tex.
-
(1993)
Constructability Implementation Guide
-
-
-
5
-
-
0033422311
-
Bridging epistemologies: The generative dance between organizational knowledge and organizational knowing
-
Cook, S. D., and Brown, J. S. (1999). "Bridging epistemologies: The generative dance between organizational knowledge and organizational knowing." Org. Sci., 10(4), 381-400.
-
(1999)
Org. Sci.
, vol.10
, Issue.4
, pp. 381-400
-
-
Cook, S.D.1
Brown, J.S.2
-
6
-
-
0004411582
-
Characteristics of design-relevant constructability knowledge
-
Fisher, M., and Tantum, C. B. (1997). "Characteristics of design-relevant Constructability knowledge." J. Constr. Eng. Manage., 123(3), 253-260.
-
(1997)
J. Constr. Eng. Manage.
, vol.123
, Issue.3
, pp. 253-260
-
-
Fisher, M.1
Tantum, C.B.2
-
7
-
-
0029538120
-
Constructability information classification scheme
-
Hanlon, E., and Sanvido, V. (1995). "Constructability information classification scheme." J. Constr. Eng. Manage., 121(4), 337-345.
-
(1995)
J. Constr. Eng. Manage.
, vol.121
, Issue.4
, pp. 337-345
-
-
Hanlon, E.1
Sanvido, V.2
-
8
-
-
0032335251
-
Knowledge management processes and international joint ventures
-
Inkpen, A. C., and Dinur, A. (1998). "Knowledge management processes and international joint ventures." Org. Sci., 9(4), 454-468.
-
(1998)
Org. Sci.
, vol.9
, Issue.4
, pp. 454-468
-
-
Inkpen, A.C.1
Dinur, A.2
-
9
-
-
0035392356
-
Benefits of constructability on construction projects
-
Jergeas, G., and Van der Put, J. (2001). "Benefits of constructability on construction projects." J. Constr. Eng. Manage., 127(4), 281-290.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.4
, pp. 281-290
-
-
Jergeas, G.1
Van Der Put, J.2
-
12
-
-
0023363645
-
Constructability concepts for engineering and procurement
-
O'Connor, J., Rusch, S., and Schulz, M. (1987). "Constructability concepts for engineering and procurement." J. Constr. Eng. Manage., 113(2), 235-248.
-
(1987)
J. Constr. Eng. Manage.
, vol.113
, Issue.2
, pp. 235-248
-
-
O'Connor, J.1
Rusch, S.2
Schulz, M.3
-
13
-
-
0024139998
-
Constructability improvement during field operations
-
O'Connor, J., and Davis, V. (1988). "Constructability improvement during field operations." J. Constr. Eng. Manage., 114(4), 548-564.
-
(1988)
J. Constr. Eng. Manage.
, vol.114
, Issue.4
, pp. 548-564
-
-
O'Connor, J.1
Davis, V.2
-
14
-
-
0017135463
-
Designing to reduce construction costs
-
Paulson, B., Jr. (1976). "Designing to reduce construction costs." J. Constr. Div., Am. Soc. Civ. Eng., 102(4), 587-592.
-
(1976)
J. Constr. Div., Am. Soc. Civ. Eng.
, vol.102
, Issue.4
, pp. 587-592
-
-
Paulson Jr., B.1
-
16
-
-
2342439900
-
-
SD-83, Construction Industry Institute, Austin, Tex.
-
Russell, J., Gugel, J., and Fadtke, M. (1992). "Benefits of constructability: Four case studies." SD-83, Construction Industry Institute, Austin, Tex.
-
(1992)
Benefits of Constructability: Four Case Studies
-
-
Russell, J.1
Gugel, J.2
Fadtke, M.3
-
17
-
-
0037489532
-
-
Computer Integrated Construction Research Program, University Park, Pa.
-
Sanvido, V., et al. (1990). "An integrated building process model." Computer Integrated Construction Research Program, University Park, Pa.
-
(1990)
An Integrated Building Process Model
-
-
Sanvido, V.1
-
18
-
-
2342442936
-
-
36, Computer Integrated Construction Research Program, University Park, Pa.
-
Sanvido, V., et al. (1995). "A process-based Information Architecture." 36, Computer Integrated Construction Research Program, University Park, Pa.
-
(1995)
A Process-based Information Architecture
-
-
Sanvido, V.1
-
19
-
-
0023363812
-
Improving constructability during conceptual planning
-
Tatum, C. B. (1987). "Improving constructability during conceptual planning." J. Constr. Eng. Manage., 113(2), 191-207.
-
(1987)
J. Constr. Eng. Manage.
, vol.113
, Issue.2
, pp. 191-207
-
-
Tatum, C.B.1
-
20
-
-
0032164958
-
Assessment of constructability practices among general contractors
-
Uhlik, F., and Lores, G. (1998). "Assessment of constructability practices among general contractors." J. Archit. Eng., 4(3), 113-123.
-
(1998)
J. Archit. Eng.
, vol.4
, Issue.3
, pp. 113-123
-
-
Uhlik, F.1
Lores, G.2
|