Volumn 28, Issue 7, 2004, Pages 62-67

An interval-based method for evaluation and decision-making of power system planning projects

Author keywords

Binary (0 1) programming; IAHP; Power system planning; Resource allocation; Uncertainties

Indexed keywords

BUDGET CONTROL; COSTS; DECISION MAKING; ELECTRIC UTILITIES; PARAMETER ESTIMATION; PROJECT MANAGEMENT; RESOURCE ALLOCATION; URBAN PLANNING;

EID: 2542464356     PISSN: 10003673     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (21)

References (8)
  • 2
    • 2542486746 scopus 로고    scopus 로고
    • Fuzzy multi-objective comprehensive decision on transmission projects
    • (Wu Li, Wu Jie, Zhou Lerong). (Fuzzy multi-objective comprehensive decision on transmission projects)[J]. (Power System Technology), 1999, 23(3): 19-22.
    • (1999) Power System Technology , vol.23 , Issue.3 , pp. 19-22
    • Wu, L.1    Wu, J.2    Zhou, L.3
  • 3
    • 0034497125 scopus 로고    scopus 로고
    • Multi-attribute utility theory applied on analysis of alternative for 500kV transmission lines building
    • Nashville, Tennessee, USA
    • Vilela R F T, Pires T T, De Almeida A T. Multi-attribute utility theory applied on analysis of alternative for 500kV transmission lines building[C]. IEEE International Conference on Systems, Man, and Cybernetics, Nashville, Tennessee, USA, 2000: 615-618.
    • (2000) IEEE International Conference on Systems, Man, and Cybernetics , pp. 615-618
    • Vilela, R.F.T.1    Pires, T.T.2    De Almeida, A.T.3
  • 4
    • 40949136885 scopus 로고    scopus 로고
    • Application of dynamic programming to decision on power system projects
    • (Zhong Qing, Wu Jie, Huang Wuzhong et al). (Application of dynamic programming to decision on power system projects) [J]. (Power System Technology), 2002, 26(8): 49-51
    • (2002) Power System Technology , vol.26 , Issue.8 , pp. 49-51
    • Zhong, Q.1    Wu, J.2    Huang, W.3
  • 5
    • 0037816362 scopus 로고    scopus 로고
    • Optimal allocation of resources to distribution investments using the analytic hierarchy process to balance the impacts of investments on safety, customer interruption costs, levelized annual revenue requirement, contribution to margin and other considerations
    • Seattle, USA
    • Sheehan M, Brace C, Williams S et al. Optimal allocation of resources to distribution investments using the analytic hierarchy process to balance the impacts of investments on safety, customer interruption costs, levelized annual revenue requirement, contribution to margin and other considerations[C]. IEEE Power Engineering Society Summer Meeting, Seattle, USA, 2000: 1311-316.
    • (2000) IEEE Power Engineering Society Summer Meeting , pp. 1311-1316
    • Sheehan, M.1    Brace, C.2    Williams, S.3
  • 7
    • 2542427823 scopus 로고    scopus 로고
    • Interval number linear programming and its satisfactory solution
    • (Da Qingli, Liu Xinwang), (Interval number linear programming and its satisfactory solution) [J]. (Theory and Practice on System Engineering), 1999, 19(4): 3-7.
    • (1999) Theory and Practice on System Engineering , vol.19 , Issue.4 , pp. 3-7
    • Da, Q.1    Liu, X.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.