-
1
-
-
84894018033
-
-
American Association of State Highway and Transportation Officials, Task Force on Preconstruction Engineering Management, Washington, DC.
-
AASHTO (1996), Guide for Contracting, Selecting and Managing Consultants in Preconstruction Engineering, American Association of State Highway and Transportation Officials, Task Force on Preconstruction Engineering Management, Washington, DC.
-
(1996)
Guide for Contracting, Selecting and Managing Consultants in Preconstruction Engineering
-
-
-
2
-
-
2542452663
-
-
Task Committee on Revision of Manual No. 45, American Society of Civil Engineers, New York, NY.
-
ASCE (1996), Consulting Engineering: A Guide for the Engagement of Engineering Services, Task Committee on Revision of Manual No. 45, American Society of Civil Engineers, New York, NY.
-
(1996)
Consulting Engineering: A Guide for the Engagement of Engineering Services
-
-
-
3
-
-
0029378537
-
Demystifying the local agency's process of consultant procurement
-
Avila, E.A. (1995), “Demystifying the local agency's process of consultant procurement”, Journal of Management in Engineering, ASCE, Vol. 11 No. 5, pp. 21-3.
-
(1995)
Journal of Management in Engineering, ASCE
, vol.11
, Issue.5
, pp. 21-23
-
-
Avila, E.A.1
-
4
-
-
0031103720
-
Demystifying the local agency procurement and selection process for professional engineering consultant services
-
Avila, E.A. (1997), “Demystifying the local agency procurement and selection process for professional engineering consultant services”, Journal of Management in Engineering, ASCE, Vol. 13 No. 2, pp. 92-5.
-
(1997)
Journal of Management in Engineering, ASCE
, vol.13
, Issue.2
, pp. 92-95
-
-
Avila, E.A.1
-
5
-
-
0036812939
-
Multi-criteria evaluation model for the selection of architectural consultants
-
Cheung, F.K.T., Leung, J.F.K. and Skitmore, R.M. (2002), “Multi-criteria evaluation model for the selection of architectural consultants”, Construction Management and Economics, Vol. 20 No. 7, pp. 569-80.
-
(2002)
Construction Management and Economics
, vol.20
, Issue.7
, pp. 569-580
-
-
Cheung, F.K.T.1
Leung, J.F.K.2
Skitmore, R.M.3
-
6
-
-
2542498566
-
-
Construction Industry Board, Working Group 4, Thomas Telford, London.
-
CIB (1997), Framework for a National Register for Consultants, Construction Industry Board, Working Group 4, Thomas Telford, London.
-
(1997)
Framework for a National Register for Consultants
-
-
-
8
-
-
2542487155
-
Selecting the right consultants
-
Cooley, M.S. (1994), “Selecting the right consultants”, HR Magazine, Vol. 39 No. 8, pp. 100-3.
-
(1994)
HR Magazine
, vol.39
, Issue.8
, pp. 100-103
-
-
Cooley, M.S.1
-
10
-
-
0004243644
-
-
Prentice-Hall, Englewood Cliffs, NJ.
-
Freund, J.E. and Simon, G.A. (1997), Modern Elementary Statistics, 9th ed., Prentice-Hall, Englewood Cliffs, NJ.
-
(1997)
Modern Elementary Statistics, 9th ed.
-
-
Freund, J.E.1
Simon, G.A.2
-
11
-
-
0031235719
-
Selecting the right consultant team
-
Hattan, D.E. and Lalani, N. (1997), “Selecting the right consultant team”, Institute of Transportation Engineering Journal, Vol. 67 No. 9, pp. 40-6.
-
(1997)
Institute of Transportation Engineering Journal
, vol.67
, Issue.9
, pp. 40-46
-
-
Hattan, D.E.1
Lalani, N.2
-
12
-
-
2042428980
-
-
Hong Kong Housing Authority, HKSAR.
-
HKHA (1997), CRS: Consultant Reporting System, Hong Kong Housing Authority, HKSAR.
-
(1997)
CRS: Consultant Reporting System
-
-
-
15
-
-
2542443279
-
-
Procurement Guidance No. 3, Procurement Group, UK Government Procurement Group, London.
-
HM Treasury (1997), Appointment of Consultants and Contractors, Procurement Guidance No. 3, Procurement Group, UK Government Procurement Group, London.
-
(1997)
Appointment of Consultants and Contractors
-
-
-
17
-
-
0023440136
-
Consultant selection
-
Kasma, D.R. (1987), “Consultant selection”, Journal of Management in Engineering, ASCE, Vol. 3 No. 4, pp. 288-96.
-
(1987)
Journal of Management in Engineering, ASCE
, vol.3
, Issue.4
, pp. 288-296
-
-
Kasma, D.R.1
-
18
-
-
0004001439
-
-
Wiley, New York, NY.
-
Kenney, R.L. and Raiffa, H. (1976), Decisions with Multiple Objectives: Preferences and Value Tradeoffs, Wiley, New York, NY.
-
(1976)
Decisions with Multiple Objectives: Preferences and Value Tradeoffs
-
-
Kenney, R.L.1
Raiffa, H.2
-
20
-
-
2542476825
-
Design Consultancy vs Design and build consultancy – present trends in the construction industry
-
Thesis Master of Business and Administration, University of Hong Kong, Hong Kong.
-
Leung, C.M., (1995) “Design Consultancy vs Design and build consultancy – present trends in the construction industry”, Thesis Master of Business and Administration, University of Hong Kong, Hong Kong.
-
(1995)
-
-
Leung, C.M.1
-
21
-
-
2542426353
-
A theoretical framework for selection of consultants by design-build contractors
-
Ling, Y.Y. (2000), “A theoretical framework for selection of consultants by design-build contractors”, Journal of Construction Procurement, Vol. 6 No. 2, pp. 147-63.
-
(2000)
Journal of Construction Procurement
, vol.6
, Issue.2
, pp. 147-163
-
-
Ling, Y.Y.1
-
22
-
-
2542502330
-
Model for predicting performance of architects and engineers
-
Ling, Y.Y. (2002), “Model for predicting performance of architects and engineers”, Journal of Construction Engineering and Management, Vol. 128 No. 5, pp. 446-55.
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.5
, pp. 446-455
-
-
Ling, Y.Y.1
-
23
-
-
0037292987
-
A conceptual model for selection of architects by project managers in Singapore
-
Ling, Y.Y. (2003), “A conceptual model for selection of architects by project managers in Singapore”, International Journal of Project Management, Vol. 21 No. 2, pp. 135-44.
-
(2003)
International Journal of Project Management
, vol.21
, Issue.2
, pp. 135-144
-
-
Ling, Y.Y.1
-
24
-
-
84992960775
-
Importance of design consultants' soft skills in design-build projects
-
Ling, Y.Y., Ofori, G. and Low, S.P. (2000), “Importance of design consultants' soft skills in design-build projects”, Engineering, Construction and Architectural Management, Vol. 7 No. 4, pp. 389-98.
-
(2000)
Engineering, Construction and Architectural Management
, vol.7
, Issue.4
, pp. 389-398
-
-
Ling, Y.Y.1
Ofori, G.2
Low, S.P.3
-
26
-
-
0242430481
-
Selecting consultants through combined technical and fee assessment – a Hong Kong study
-
in Akintoye, A. (Ed.), Proceedings, ARCOM 17th Annual Conference 2001, 5-7 September, University of Salford, Salford
-
Ng, S.T., Kumaraswamy, M.M. and Chow, L.K. (2001), “Selecting consultants through combined technical and fee assessment – a Hong Kong study”, in Akintoye, A. (Ed.), Proceedings, ARCOM 17th Annual Conference 2001, 5-7 September, University of Salford, Salford, pp. 639-48.
-
(2001)
, pp. 639-648
-
-
Ng, S.T.1
Kumaraswamy, M.M.2
Chow, L.K.3
-
27
-
-
2542450737
-
Contractor financial capability assessment
-
Ng, S.T. and Skitmore, R.M. (1999), “Contractor financial capability assessment”, The Australian Institute of Building Paper, Vol. 9 No. 1, pp. 75-88.
-
(1999)
The Australian Institute of Building Paper
, vol.9
, Issue.1
, pp. 75-88
-
-
Ng, S.T.1
Skitmore, R.M.2
-
28
-
-
2542444227
-
-
New Jersey Turnpike Authority, New Brunswick, NJ.
-
NJTA (1997), Engineering Consultant Prequalification, New Jersey Turnpike Authority, New Brunswick, NJ.
-
(1997)
Engineering Consultant Prequalification
-
-
-
36
-
-
2542424431
-
-
Washington State Department of Transportation, Olympia, WA.
-
WSDOT (1996), Consultant Services Procedure Manual, Washington State Department of Transportation, Olympia, WA.
-
(1996)
Consultant Services Procedure Manual
-
-
|