1
-
-
25144489473
-
Reference documents of invite public bidding on principal part of building engineering of Longtan hydropower station (engineering geology)
-
Mid-South Design and Research Institute for Hydroelectric Projects, State Power Corporation of China, Changsha: Mid-South Design and Research Institute for Hydroelectric Projects, Chinese source
-
Mid-South Design and Research Institute for Hydroelectric Projects, State Power Corporation of China. Reference documents of invite public bidding on principal part of building engineering of Longtan hydropower station (engineering geology)[R]. Changsha: Mid-South Design and Research Institute for Hydroelectric Projects, 2001. (in Chinese)
-
(2001)
-
-
-
2
-
-
0027092152
-
The mechanism of bending creep of bedded rockmass in the slope on the left bank of Longtan damsite
-
Chinese source
-
Wang Sijing, Xiao Yuan, Du Yonglian. The mechanism of bending creep of bedded rockmass in the slope on the left bank of Longtan damsite[J]. Geologic Science, 1992, (Supp.): 342-352. (in Chinese)
-
(1992)
Geologic Science
, Issue.SUPPL.
, pp. 342-352
-
-
Wang, S.1
Xiao, Y.2
Du, Y.3
-
3
-
-
16644396601
-
A review on inverse analysis of displacements in rock mechanics
-
Chinese source
-
Wang Zhiyin, Yang Zhifa, Wang Sijing. A review on inverse analysis of displacements in rock mechanics[J]. Advances in Mechanics, 1998, 28(4): 488-498. (in Chinese)
-
(1998)
Advances in Mechanics
, vol.28
, Issue.4
, pp. 488-498
-
-
Wang, Z.1
Yang, Z.2
Wang, S.3
-
5
-
-
25144471083
-
Researches on rheological characteristic of rock mass and its applications in rock engineering
-
Wuhan: Huazhong University of Science and Technology, Chinese source
-
Xu Ping. Researches on rheological characteristic of rock mass and its applications in rock engineering[Ph.D. Thesis][D]. Wuhan: Huazhong University of Science and Technology, 2000. (in Chinese)
-
(2000)
-
-
Xu, P.1
-
7
-
-
25144497413
-
Application of back analysis method of displacement to underground engineering design
-
Chinese source
-
Yang Zhifa, Liu Zhuhua. Application of back analysis method of displacement to underground engineering design[J]. Underground Engineering, 1981, (2): 20-24. (in Chinese)
-
(1981)
Underground Engineering
, Issue.2
, pp. 20-24
-
-
Yang, Z.1
Liu, Z.2
-
8
-
-
25144515873
-
Analysis report of geostress measure on Longtan hydropower station
-
Research School, Mid-South Design and Research Institute for Hydroelectric Projects, State Power Corporation of China, Changsha: Mid-South Design and Research Institute for Hydroelectric Projects, Chinese source
-
Research School, Mid-South Design and Research Institute for Hydroelectric Projects, State Power Corporation of China. Analysis report of geostress measure on Longtan hydropower station[R]. Changsha: Mid-South Design and Research Institute for Hydroelectric Projects, 1993. (in Chinese)
-
(1993)
-
-
-
9
-
-
25144441639
-
Compilation report of rock mechanics experimentation on Longtan hydropower station (primary design phase)
-
Mid-South Design and Research Institute for Hydroelectric Projects, State Power Corporation of China, Changsha: Mid-South Design and Research Institute for Hydroelectric Projects, Chinese source
-
Mid-South Design and Research Institute for Hydroelectric Projects, State Power Corporation of China. Compilation report of rock mechanics experimentation on Longtan hydropower station (primary design phase)[R]. Changsha: Mid-South Design and Research Institute for Hydroelectric Projects, 1989. (in Chinese)
-
(1989)
-
-
|