메뉴 건너뛰기




Volumn 16, Issue 7, 2005, Pages 765-783

Investigating the efficacy of exercising JIT practices to support pull production control in a job shop environment

Author keywords

Just in time; Modelling; Pull material ordering systems; Simulation

Indexed keywords

COMPUTER SIMULATION; INDUSTRIAL MANAGEMENT; JOB ANALYSIS; PRODUCTION CONTROL;

EID: 24944543261     PISSN: 1741038X     EISSN: None     Source Type: Journal    
DOI: 10.1108/17410380510626187     Document Type: Article
Times cited : (4)

References (26)
  • 1
    • 77957029406 scopus 로고
    • Performance of manufacturing cells for group technology: A parametric analysis
    • Kamrani, A.K. Parsaei, H.R. Liles, D.H. Elsevier Science Amsterdam
    • Agarwal, A., Huq, F. and Sarkis, J. (1995), "Performance of manufacturing cells for group technology: a parametric analysis", in Kamrani, A.K., Parsaei, H.R. and Liles, D.H. (Eds), Planning, Design, and Analysis of Cellular Manufacturing Systems, Elsevier Science, Amsterdam, pp. 167-81.
    • (1995) Planning, Design, and Analysis of Cellular Manufacturing Systems , pp. 167-181
    • Agarwal, A.1    Huq, F.2    Sarkis, J.3
  • 6
    • 38249034192 scopus 로고
    • Repetitive lots: The use of a sequence-dependent set-up time scheduling procedure in group technology and traditional shops
    • Flynn, B.B. (1987), "Repetitive lots: the use of a sequence-dependent set-up time scheduling procedure in group technology and traditional shops", Journal of Operations Management, Vol. 7 Nos 1/2, pp. 203-16.
    • (1987) Journal of Operations Management , vol.7 , Issue.12 , pp. 203-216
    • Flynn, B.B.1
  • 7
    • 84985773741 scopus 로고
    • An experimental comparison of cellular (group technology) layout with process layout
    • Flynn, B.B. and Jacobs, F.R. (1987), "An experimental comparison of cellular (group technology) layout with process layout", Decision Sciences, Vol. 18 No. 4, pp. 562-81.
    • (1987) Decision Sciences , vol.18 , Issue.4 , pp. 562-581
    • Flynn, B.B.1    Jacobs, F.R.2
  • 8
    • 0002855196 scopus 로고
    • Countering the negative impact of intercell flow in cellular manufacturing
    • Garza, O. and Smunt, T.L. (1991), "Countering the negative impact of intercell flow in cellular manufacturing", Journal of Operations Management, Vol. 10 No. 1, pp. 92-118.
    • (1991) Journal of Operations Management , vol.10 , Issue.1 , pp. 92-118
    • Garza, O.1    Smunt, T.L.2
  • 9
    • 0031165161 scopus 로고    scopus 로고
    • Implementation of just-in-time in a small company: A case study
    • Gunasekaran, A. and Lyu, J. (1997), "Implementation of just-in-time in a small company: a case study", Production Planning and Control, Vol. 8 No. 4, pp. 406-12.
    • (1997) Production Planning and Control , vol.8 , Issue.4 , pp. 406-412
    • Gunasekaran, A.1    Lyu, J.2
  • 12
    • 0023167521 scopus 로고
    • Kanban, MRP and shaping the manufacturing environment
    • Krajewski, L.J., King, B.E., Ritzman, L.P. and Wong, D.S. (1987), "Kanban, MRP and shaping the manufacturing environment", Management Science, Vol. 33 No. 1, pp. 39-57.
    • (1987) Management Science , vol.33 , Issue.1 , pp. 39-57
    • Krajewski, L.J.1    King, B.E.2    Ritzman, L.P.3    Wong, D.S.4
  • 13
    • 0242269801 scopus 로고    scopus 로고
    • Simulation-based comparison of push and pull systems in a job-shop environment considering the context of JIT implementation
    • Li, J-W. (2003), "Simulation-based comparison of push and pull systems in a job-shop environment considering the context of JIT implementation", International Journal of Production Research, Vol. 41 No. 3, pp. 427-47.
    • (2003) International Journal of Production Research , vol.41 , Issue.3 , pp. 427-447
    • Li, J.-W.1
  • 14
    • 0034672924 scopus 로고    scopus 로고
    • Investigating the factors influencing the shop performance in a job shop environment with kanban-based production control
    • Li, J-W. and Barnes, D.J. (2000), "Investigating the factors influencing the shop performance in a job shop environment with kanban-based production control", International Journal of Production Research, Vol. 38 No. 18, pp. 4683-99.
    • (2000) International Journal of Production Research , vol.38 , Issue.18 , pp. 4683-4699
    • Li, J.-W.1    Barnes, D.J.2
  • 15
    • 0025485232 scopus 로고
    • An investigation of dynamic group scheduling heuristics in a job shop manufacturing cell
    • Mahmoodi, F., Dooley, K.J. and Starr, P.J. (1990), "An investigation of dynamic group scheduling heuristics in a job shop manufacturing cell", International Journal of Production Research, Vol. 29 No. 9, pp. 1695-711.
    • (1990) International Journal of Production Research , vol.29 , Issue.9 , pp. 1695-1711
    • Mahmoodi, F.1    Dooley, K.J.2    Starr, P.J.3
  • 17
    • 0025560330 scopus 로고
    • A simulation analysis of factors influencing the attractiveness of group technology cellular layouts
    • Morris, J.S. and Tersine, R.J. (1990), "A simulation analysis of factors influencing the attractiveness of group technology cellular layouts", Management Science, Vol. 36 No. 12, pp. 1567-78.
    • (1990) Management Science , vol.36 , Issue.12 , pp. 1567-1578
    • Morris, J.S.1    Tersine, R.J.2
  • 18
    • 0023310442 scopus 로고
    • An investigation of the factors influencing the number of Kanbans required in the implementation of the JIT technique with Kanbans
    • Philipoom, P.R., Rees, L.P., Taylor, B.W. III and Huang, P.Y. (1987), "An investigation of the factors influencing the number of Kanbans required in the implementation of the JIT technique with Kanbans", International Journal of Production Research, Vol. 25 No. 3, pp. 457-72.
    • (1987) International Journal of Production Research , vol.25 , Issue.3 , pp. 457-472
    • Philipoom, P.R.1    Rees, L.P.2    Iii, W.T.B.3    Huang, P.Y.4
  • 19
    • 0024715082 scopus 로고
    • A comparative analysis of an MRP lot-for-lot system and a Kanban system for a multistage production operation
    • Rees, L.P., Huang, P.Y. and Taylor, B.W. III (1989), "A comparative analysis of an MRP lot-for-lot system and a Kanban system for a multistage production operation", International Journal of Production Research, Vol. 27 No. 8, pp. 1427-43.
    • (1989) International Journal of Production Research , vol.27 , Issue.8 , pp. 1427-1443
    • Rees, L.P.1    Huang, P.Y.2    Iii, W.T.B.3
  • 20
    • 0022281177 scopus 로고
    • paper presented at the APICS Conference Proceedings
    • Sandras, B. (1985), "Job shop JIT", paper presented at the APICS Conference Proceedings, pp. 448-52.
    • (1985) Job Shop JIT , pp. 448-452
    • Sandras, B.1
  • 22
    • 0028406510 scopus 로고
    • Coping with the loss of pooling synergy in cellular manufacturing systems
    • Suresh, N.C. and Meredith, J.R. (1994), "Coping with the loss of pooling synergy in cellular manufacturing systems", Management Science, Vol. 40 No. 4, pp. 466-83.
    • (1994) Management Science , vol.40 , Issue.4 , pp. 466-483
    • Suresh, N.C.1    Meredith, J.R.2
  • 24
    • 0025399180 scopus 로고
    • Designing a cellular manufacturing system: A material flow approach based on operation sequences
    • Vakharia, A.J. and Wemmerlöv, U. (1990), "Designing a cellular manufacturing system: a material flow approach based on operation sequences", IIE Transactions, Vol. 22 No. 1, pp. 84-97.
    • (1990) IIE Transactions , vol.22 , Issue.1 , pp. 84-97
    • Vakharia, A.J.1    Wemmerlöv, U.2
  • 25
    • 0024731850 scopus 로고
    • Cellular manufacturing in the US industry: A survey of users
    • Wemmerlöv, U. and Hyer, N.L. (1989), "Cellular manufacturing in the US industry: a survey of users", International Journal of Production Research, Vol. 27 No. 9, pp. 1511-30.
    • (1989) International Journal of Production Research , vol.27 , Issue.9 , pp. 1511-1530
    • Wemmerlöv, U.1    Hyer, N.L.2
  • 26
    • 0030784413 scopus 로고    scopus 로고
    • Cellular manufacturing at 46 user plants: Implementation experiences and performance improvements
    • Wemmerlöv, U. and Johnson, D.J. (1997), "Cellular manufacturing at 46 user plants: implementation experiences and performance improvements", International Journal of Production Research, Vol. 35 No. 1, pp. 29-49.
    • (1997) International Journal of Production Research , vol.35 , Issue.1 , pp. 29-49
    • Wemmerlöv, U.1    Johnson, D.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.