-
1
-
-
77957029406
-
Performance of manufacturing cells for group technology: A parametric analysis
-
Kamrani, A.K. Parsaei, H.R. Liles, D.H. Elsevier Science Amsterdam
-
Agarwal, A., Huq, F. and Sarkis, J. (1995), "Performance of manufacturing cells for group technology: a parametric analysis", in Kamrani, A.K., Parsaei, H.R. and Liles, D.H. (Eds), Planning, Design, and Analysis of Cellular Manufacturing Systems, Elsevier Science, Amsterdam, pp. 167-81.
-
(1995)
Planning, Design, and Analysis of Cellular Manufacturing Systems
, pp. 167-181
-
-
Agarwal, A.1
Huq, F.2
Sarkis, J.3
-
4
-
-
0002722203
-
Production management techniques: Push-pull classification and application conditions
-
De Toni, A., Caputo, M. and Vinelli, A. (1988), "Production management techniques: push-pull classification and application conditions", International Journal of Operations & Production Management, Vol. 8 No. 2, pp. 35-51.
-
(1988)
International Journal of Operations & Production Management
, vol.8
, Issue.2
, pp. 35-51
-
-
De Toni, A.1
Caputo, M.2
Vinelli, A.3
-
6
-
-
38249034192
-
Repetitive lots: The use of a sequence-dependent set-up time scheduling procedure in group technology and traditional shops
-
Flynn, B.B. (1987), "Repetitive lots: the use of a sequence-dependent set-up time scheduling procedure in group technology and traditional shops", Journal of Operations Management, Vol. 7 Nos 1/2, pp. 203-16.
-
(1987)
Journal of Operations Management
, vol.7
, Issue.12
, pp. 203-216
-
-
Flynn, B.B.1
-
7
-
-
84985773741
-
An experimental comparison of cellular (group technology) layout with process layout
-
Flynn, B.B. and Jacobs, F.R. (1987), "An experimental comparison of cellular (group technology) layout with process layout", Decision Sciences, Vol. 18 No. 4, pp. 562-81.
-
(1987)
Decision Sciences
, vol.18
, Issue.4
, pp. 562-581
-
-
Flynn, B.B.1
Jacobs, F.R.2
-
8
-
-
0002855196
-
Countering the negative impact of intercell flow in cellular manufacturing
-
Garza, O. and Smunt, T.L. (1991), "Countering the negative impact of intercell flow in cellular manufacturing", Journal of Operations Management, Vol. 10 No. 1, pp. 92-118.
-
(1991)
Journal of Operations Management
, vol.10
, Issue.1
, pp. 92-118
-
-
Garza, O.1
Smunt, T.L.2
-
9
-
-
0031165161
-
Implementation of just-in-time in a small company: A case study
-
Gunasekaran, A. and Lyu, J. (1997), "Implementation of just-in-time in a small company: a case study", Production Planning and Control, Vol. 8 No. 4, pp. 406-12.
-
(1997)
Production Planning and Control
, vol.8
, Issue.4
, pp. 406-412
-
-
Gunasekaran, A.1
Lyu, J.2
-
12
-
-
0023167521
-
Kanban, MRP and shaping the manufacturing environment
-
Krajewski, L.J., King, B.E., Ritzman, L.P. and Wong, D.S. (1987), "Kanban, MRP and shaping the manufacturing environment", Management Science, Vol. 33 No. 1, pp. 39-57.
-
(1987)
Management Science
, vol.33
, Issue.1
, pp. 39-57
-
-
Krajewski, L.J.1
King, B.E.2
Ritzman, L.P.3
Wong, D.S.4
-
13
-
-
0242269801
-
Simulation-based comparison of push and pull systems in a job-shop environment considering the context of JIT implementation
-
Li, J-W. (2003), "Simulation-based comparison of push and pull systems in a job-shop environment considering the context of JIT implementation", International Journal of Production Research, Vol. 41 No. 3, pp. 427-47.
-
(2003)
International Journal of Production Research
, vol.41
, Issue.3
, pp. 427-447
-
-
Li, J.-W.1
-
14
-
-
0034672924
-
Investigating the factors influencing the shop performance in a job shop environment with kanban-based production control
-
Li, J-W. and Barnes, D.J. (2000), "Investigating the factors influencing the shop performance in a job shop environment with kanban-based production control", International Journal of Production Research, Vol. 38 No. 18, pp. 4683-99.
-
(2000)
International Journal of Production Research
, vol.38
, Issue.18
, pp. 4683-4699
-
-
Li, J.-W.1
Barnes, D.J.2
-
15
-
-
0025485232
-
An investigation of dynamic group scheduling heuristics in a job shop manufacturing cell
-
Mahmoodi, F., Dooley, K.J. and Starr, P.J. (1990), "An investigation of dynamic group scheduling heuristics in a job shop manufacturing cell", International Journal of Production Research, Vol. 29 No. 9, pp. 1695-711.
-
(1990)
International Journal of Production Research
, vol.29
, Issue.9
, pp. 1695-1711
-
-
Mahmoodi, F.1
Dooley, K.J.2
Starr, P.J.3
-
16
-
-
0024480282
-
Applying just-in-time in a wafer fab: A case study
-
Martin-Vega, L.A., Pippin, M., Gerdon, E. and Burcham, R. (1989), "Applying just-in-time in a wafer fab: a case study", IEEE Transactions on Semiconductor Manufacturing, Vol. 2 No. 1, pp. 16-22.
-
(1989)
IEEE Transactions on Semiconductor Manufacturing
, vol.2
, Issue.1
, pp. 16-22
-
-
Martin-Vega, L.A.1
Pippin, M.2
Gerdon, E.3
Burcham, R.4
-
17
-
-
0025560330
-
A simulation analysis of factors influencing the attractiveness of group technology cellular layouts
-
Morris, J.S. and Tersine, R.J. (1990), "A simulation analysis of factors influencing the attractiveness of group technology cellular layouts", Management Science, Vol. 36 No. 12, pp. 1567-78.
-
(1990)
Management Science
, vol.36
, Issue.12
, pp. 1567-1578
-
-
Morris, J.S.1
Tersine, R.J.2
-
18
-
-
0023310442
-
An investigation of the factors influencing the number of Kanbans required in the implementation of the JIT technique with Kanbans
-
Philipoom, P.R., Rees, L.P., Taylor, B.W. III and Huang, P.Y. (1987), "An investigation of the factors influencing the number of Kanbans required in the implementation of the JIT technique with Kanbans", International Journal of Production Research, Vol. 25 No. 3, pp. 457-72.
-
(1987)
International Journal of Production Research
, vol.25
, Issue.3
, pp. 457-472
-
-
Philipoom, P.R.1
Rees, L.P.2
Iii, W.T.B.3
Huang, P.Y.4
-
19
-
-
0024715082
-
A comparative analysis of an MRP lot-for-lot system and a Kanban system for a multistage production operation
-
Rees, L.P., Huang, P.Y. and Taylor, B.W. III (1989), "A comparative analysis of an MRP lot-for-lot system and a Kanban system for a multistage production operation", International Journal of Production Research, Vol. 27 No. 8, pp. 1427-43.
-
(1989)
International Journal of Production Research
, vol.27
, Issue.8
, pp. 1427-1443
-
-
Rees, L.P.1
Huang, P.Y.2
Iii, W.T.B.3
-
20
-
-
0022281177
-
-
paper presented at the APICS Conference Proceedings
-
Sandras, B. (1985), "Job shop JIT", paper presented at the APICS Conference Proceedings, pp. 448-52.
-
(1985)
Job Shop JIT
, pp. 448-452
-
-
Sandras, B.1
-
22
-
-
0028406510
-
Coping with the loss of pooling synergy in cellular manufacturing systems
-
Suresh, N.C. and Meredith, J.R. (1994), "Coping with the loss of pooling synergy in cellular manufacturing systems", Management Science, Vol. 40 No. 4, pp. 466-83.
-
(1994)
Management Science
, vol.40
, Issue.4
, pp. 466-483
-
-
Suresh, N.C.1
Meredith, J.R.2
-
24
-
-
0025399180
-
Designing a cellular manufacturing system: A material flow approach based on operation sequences
-
Vakharia, A.J. and Wemmerlöv, U. (1990), "Designing a cellular manufacturing system: a material flow approach based on operation sequences", IIE Transactions, Vol. 22 No. 1, pp. 84-97.
-
(1990)
IIE Transactions
, vol.22
, Issue.1
, pp. 84-97
-
-
Vakharia, A.J.1
Wemmerlöv, U.2
-
25
-
-
0024731850
-
Cellular manufacturing in the US industry: A survey of users
-
Wemmerlöv, U. and Hyer, N.L. (1989), "Cellular manufacturing in the US industry: a survey of users", International Journal of Production Research, Vol. 27 No. 9, pp. 1511-30.
-
(1989)
International Journal of Production Research
, vol.27
, Issue.9
, pp. 1511-1530
-
-
Wemmerlöv, U.1
Hyer, N.L.2
-
26
-
-
0030784413
-
Cellular manufacturing at 46 user plants: Implementation experiences and performance improvements
-
Wemmerlöv, U. and Johnson, D.J. (1997), "Cellular manufacturing at 46 user plants: implementation experiences and performance improvements", International Journal of Production Research, Vol. 35 No. 1, pp. 29-49.
-
(1997)
International Journal of Production Research
, vol.35
, Issue.1
, pp. 29-49
-
-
Wemmerlöv, U.1
Johnson, D.J.2
|