-
1
-
-
0025694104
-
Experimental and field testing of bar code technology in the construction environment
-
Bernold, L. (1990). "Experimental and field testing of bar code technology in the construction environment." J. Constr. Eng. Manage., 116(4), 643-655.
-
(1990)
J. Constr. Eng. Manage.
, vol.116
, Issue.4
, pp. 643-655
-
-
Bernold, L.1
-
2
-
-
0027609612
-
Placement-oriented design and delivery of concrete reinforcement
-
Bernold, L. E., and Salim, Md. (1993). "Placement-oriented design and delivery of concrete reinforcement." J. Constr. Eng. Manage., 119(2), 323-335.
-
(1993)
J. Constr. Eng. Manage.
, vol.119
, Issue.2
, pp. 323-335
-
-
Bernold, L.E.1
Salim, M.2
-
3
-
-
0026383750
-
Vendor analysis for best buy in construction
-
Bernold, L., and Treseler, J. F. (1991). "Vendor analysis for best buy in construction." J. Constr. Eng. Manage., 117(4), 645-658.
-
(1991)
J. Constr. Eng. Manage.
, vol.117
, Issue.4
, pp. 645-658
-
-
Bernold, L.1
Treseler, J.F.2
-
4
-
-
0000765208
-
A theory of cooperation in international business
-
F. J. Contractor and P. Lorange, eds., Heath, Lexington, Mass
-
Buckley, P. J., and Casson, M. (1988). "A theory of cooperation in international business." Cooperative strategies in international business, F. J. Contractor and P. Lorange, eds., Heath, Lexington, Mass.
-
(1988)
Cooperative Strategies in International Business
-
-
Buckley, P.J.1
Casson, M.2
-
6
-
-
84861244536
-
-
Tempe, Ariz. March 5, 2004
-
CAPS Research Institute for Supply Management. (2003). "Cross-industry: Comparison of standard benchmarks." Tempe, Ariz. 〈http:// www.capsresearch.org〉 (March 5, 2004).
-
(2003)
Cross-industry: Comparison of Standard Benchmarks
-
-
-
7
-
-
3242712963
-
An innovative performance measurement method fort supply chain management
-
Chan, F. T., and Qi, H. J. (2003). "An innovative performance measurement method fort supply chain management." Int. J. Supply Chain Manage., 8(3), 209-223.
-
(2003)
Int. J. Supply Chain Manage.
, vol.8
, Issue.3
, pp. 209-223
-
-
Chan, F.T.1
Qi, H.J.2
-
9
-
-
24944457876
-
Alliances in international construction
-
Austin, Tex.
-
Construction Industry Institute (CII). (1993a). "Alliances in international construction." Source Document 89, Austin, Tex.
-
(1993)
Source Document
, vol.89
-
-
-
10
-
-
0004240487
-
-
Publication 30-1, Austin, Tex.
-
Construction Industry Institute (CII). (1993b). "Competing in the global market." Publication 30-1, Austin, Tex.
-
(1993)
Competing in the Global Market
-
-
-
12
-
-
1842864323
-
New perspectives on construction supply chain integration
-
Dainty, A. J., Briscoe, G. H., and Millett, S. J. (2001). "New perspectives on construction supply chain integration." J. Supply Chain Manage., 6(4), 163-173.
-
(2001)
J. Supply Chain Manage.
, vol.6
, Issue.4
, pp. 163-173
-
-
Dainty, A.J.1
Briscoe, G.H.2
Millett, S.J.3
-
16
-
-
0030539288
-
Squaring lean supply with supply chain management
-
Lamming, R. (1996). "Squaring lean supply with supply chain management." Int. J. Operat. Product. Manage., 16(2), 183-196.
-
(1996)
Int. J. Operat. Product. Manage.
, vol.16
, Issue.2
, pp. 183-196
-
-
Lamming, R.1
-
17
-
-
3843144923
-
Performance measurement system design: A literature review and research agenda
-
Neely, A., Gregory, M., and Platts, K. (1995). "Performance measurement system design: A literature review and research agenda." Int. J. Operat. Product. Manage., 15(4), 80-116.
-
(1995)
Int. J. Operat. Product. Manage.
, vol.15
, Issue.4
, pp. 80-116
-
-
Neely, A.1
Gregory, M.2
Platts, K.3
-
18
-
-
3242739101
-
A study of supply chain management practice in UK industrial SMEs
-
Quayle, M. (2003). "A study of supply chain management practice in UK industrial SMEs." Int. J. Supply Chain Manage., 8(1), 79-86.
-
(2003)
Int. J. Supply Chain Manage.
, vol.8
, Issue.1
, pp. 79-86
-
-
Quayle, M.1
-
20
-
-
0028732527
-
Effects of design-integrated process planning on productivity in rebar placement
-
Salim, Md., and Bernold, L. E. (1994). "Effects of design-integrated process planning on productivity in rebar placement." J. Constr. Eng. Manage., 120(4), 720-738.
-
(1994)
J. Constr. Eng. Manage.
, vol.120
, Issue.4
, pp. 720-738
-
-
Salim, M.1
Bernold, L.E.2
-
21
-
-
0003856335
-
-
Industrial Engineering and Management Press, Institute of Industrial Engineers, Norcross, Ga.
-
Sink, S., and Tuttle, T. (1989). Planning and measurement in your organization of the future, Industrial Engineering and Management Press, Institute of Industrial Engineers, Norcross, Ga.
-
(1989)
Planning and Measurement in Your Organization of the Future
-
-
Sink, S.1
Tuttle, T.2
-
22
-
-
24944466269
-
Materials management cost effectiveness
-
American Association of Cost Engineers
-
Stuckhart, G., and Bell, L. C. (1986). "Materials management cost effectiveness." Proc., Trans. 20th Annual Meeting, American Association of Cost Engineers, K.2.1-K.2.4.
-
(1986)
Proc., Trans. 20th Annual Meeting
-
-
Stuckhart, G.1
Bell, L.C.2
-
23
-
-
0000603336
-
Impact of material management on productivity - A case study
-
Thomas, H. R., Sanvido, V. E., and Sanders, S. R. (1989). "Impact of material management on productivity - A case study." J. Constr. Eng. Manage., 115(3), 370-384.
-
(1989)
J. Constr. Eng. Manage.
, vol.115
, Issue.3
, pp. 370-384
-
-
Thomas, H.R.1
Sanvido, V.E.2
Sanders, S.R.3
-
24
-
-
0343480095
-
Cooperation between rivals: Informal know-how trading
-
B. Carlsson, ed., Kluwer Academic, Dordrecht, The Netherlands
-
Von Hippel, E. (1989). "Cooperation between rivals: Informal know-how trading." Industrial dynamics, B. Carlsson, ed., Kluwer Academic, Dordrecht, The Netherlands.
-
(1989)
Industrial Dynamics
-
-
Von Hippel, E.1
|