-
3
-
-
0003679290
-
-
PhD thesis, Production and Automation DIVISION, Katholieke Universiteit Leuven. LEUVEN, Belgium
-
BONGAERTS, L., 1998, Integration of scheduling and control in holonic manufacturing systems. PhD thesis, Production and Automation DIVISION, Katholieke Universiteit Leuven. LEUVEN, Belgium.
-
(1998)
Integration of Scheduling and Control in Holonic Manufacturing Systems
-
-
Bongaerts, L.1
-
4
-
-
0002741758
-
Schedule execution for a holonic shop floor control system
-
BONGAERTS, L., VALCKENAERS, P., VAN BRUSSEL, H., and WYNS, J., 1995, Schedule execution for a holonic shop floor control system. ASI'95, Proceedings of the First Advanced Summer Institute.
-
(1995)
ASI'95, Proceedings of the First Advanced Summer Institute
-
-
Bongaerts, L.1
Valckenaers, P.2
Van Brussel, H.3
Wyns, J.4
-
7
-
-
0020504370
-
Negotiation as a metaphor for distributed problem solving
-
DAVIS, R., and SMITH, R., 1983, Negotiation as a metaphor for distributed problem solving Artificial Intelligence, 20(1), 63-109.
-
(1983)
Artificial Intelligence
, vol.20
, Issue.1
, pp. 63-109
-
-
Davis, R.1
Smith, R.2
-
8
-
-
0031343750
-
Holonic manufacturing scheduling: Architecture, Cooperation mechanism, and implementation
-
GOU, L., and LUH, P., 1997, holonic manufacturing scheduling: architecture, Cooperation mechanism, and implementation. Proceedings of IEEE/IASME International Conference on Advanced Intelligent Mechatronics.
-
(1997)
Proceedings of IEEE/IASME International Conference on Advanced Intelligent Mechatronics
-
-
Gou, L.1
Luh, P.2
-
9
-
-
0011756148
-
Holonic manufacturing sytems-the basic concept and a report of IMS test Case 5
-
J. Knudesen et al. (eds.) (IOS Press)
-
HÖPF, M., 1994, Holonic manufacturing sytems-the basic concept and a report of IMS test Case 5. In J. Knudesen et al. (eds.) Sharing CIMSolutions (IOS Press).
-
(1994)
Sharing CIMSolutions
-
-
Höpf, M.1
-
10
-
-
0032047566
-
An object-oriented famework for developing distributed manufacturing architecture
-
KÁDÁR, B., MONOSTORI, L., and SZELKE, S., 1998, An object-oriented famework for developing distributed manufacturing architecture. Journal of Intelligent Manufacturing, 9(2), 73-179.
-
(1998)
Journal of Intelligent Manufacturing
, vol.9
, Issue.2
, pp. 73-179
-
-
Kádár, B.1
Monostori, L.2
Szelke, S.3
-
13
-
-
2442646398
-
Open agent architecture for the realization of holonic manufacturing systems
-
KIRSCH, D:, WIECZOREK, D., and ALBAYRAK, S., 1998, Open agent architecture for the realization of holonic manufacturing systems. IMS-Europe'98, Proceedings of the First International Workshop on Intelligent Manufacturing Systems, pp. 1-12.
-
(1998)
IMS-Europe'98, Proceedings of the First International Workshop on Intelligent Manufacturing Systems
, pp. 1-12
-
-
Kirsch, D.1
Wieczorek, D.2
Albayrak, S.3
-
16
-
-
0002435737
-
Applications of distributed artificial intelligence in industry
-
O'Hare and Jennings (eds.) (Chichester: Wiley Interscience)
-
PARUNAK, H., 1996, Applications of distributed artificial intelligence in industry. In O'Hare and Jennings (eds.) Foundations of Distributed Artificial Intelligence (Chichester: Wiley Interscience).
-
(1996)
Foundations of Distributed Artificial Intelligence
-
-
Parunak, H.1
-
18
-
-
0345727858
-
Scheduling manufacturing tasks considering due dates: A new method based on behaviours and agendas
-
RAMOS, C., ALMETDA, A., and VALE, Z., 1995, Scheduling manufacturing tasks considering due dates: a new method based on behaviours and agendas. Proceedings of the International Conference on Industrial and Engineering Applications of Artificial Intelligence and Expert Systems, pp. 745-751.
-
(1995)
Proceedings of the International Conference on Industrial and Engineering Applications of Artificial Intelligence and Expert Systems
, pp. 745-751
-
-
Ramos, C.1
Almetda, A.2
Vale, Z.3
-
19
-
-
0000643779
-
The customized, digitized, have-it-your-way economy
-
28 September
-
SCHONFELD, E., 1998, The customized, digitized, have-it-your-way economy. Fortune, 28 September.
-
(1998)
Fortune
-
-
Schonfeld, E.1
-
20
-
-
85133749042
-
Agent-based-systems for intelligent manufacturing: A state-of-the-art survey
-
SHEN, W., and NORRIE, D., 1999, Agent-based-systems for intelligent manufacturing: a state-of-the-art survey. Knowledge and Information Systems 1(2), 129-156.
-
(1999)
Knowledge and Information Systems
, vol.1
, Issue.2
, pp. 129-156
-
-
Shen, W.1
Norrie, D.2
-
22
-
-
0027190113
-
ERG Research in intelligent manufacturing systems
-
SOLBERG, J., and KASHYAP, R., 1993, ERG Research in intelligent manufacturing systems. Proceedings of the IEEE, 81(1), 25-41.
-
(1993)
Proceedings of the IEEE
, vol.81
, Issue.1
, pp. 25-41
-
-
Solberg, J.1
Kashyap, R.2
-
23
-
-
0142000466
-
Agentes inteligentes em sistemas holónicos de produção
-
Universidade do Minho. Braga, Portugal (PhD thesis in Portuguese)
-
SOUSA, P., 2000, agentes inteligentes em sistemas holónicos de produção. Tese de Doutoramento, Universidade do Minho. Braga, Portugal (PhD thesis in Portuguese).
-
(2000)
Tese de Doutoramento
-
-
Sousa, P.1
-
24
-
-
2442711387
-
Proposal of a scheduling holon for manufacturing
-
SOUSA, P., and RAMOS, C., 1997, Proposal of a scheduling holon for manufacturing. PAAM'97, Proceedings of the Second International Conference on the Practical Application of Agents and Multi-agents Technologies, pp. 55-268.
-
(1997)
PAAM'97, Proceedings of the Second International Conference on the Practical Application of Agents and Multi-agents Technologies
, pp. 55-268
-
-
Sousa, P.1
Ramos, C.2
-
25
-
-
0032045595
-
A dynamic scheduling holon for manufacturing order
-
SOUSA, P., and RAMOS, C., 1998, A dynamic scheduling holon for manufacturing order. Journal of Intelligent Manufacturing, 9(2), 107-112.
-
(1998)
Journal of Intelligent Manufacturing
, vol.9
, Issue.2
, pp. 107-112
-
-
Sousa, P.1
Ramos, C.2
-
26
-
-
0032624359
-
A distributed architecture and negotiation protocol for scheduling in manufacturing systems
-
SOUSA, P., and RAMOS, C., 1999, A distributed architecture and negotiation protocol for scheduling in manufacturing systems, Computers in Industry, 38(2), 103-113.
-
(1999)
Computers in Industry
, vol.38
, Issue.2
, pp. 103-113
-
-
Sousa, P.1
Ramos, C.2
-
27
-
-
0011715538
-
Contracting tasks between autonomous resources - An application to dynamic scheduling of manufacturing orders
-
SOUSA, P., RAMOS, C., and NEVES, J., 1999, Contracting tasks between autonomous resources - an application to dynamic scheduling of manufacturing orders. PAAM'99, Proceedings of the Fourth International Conference on the Practical Application of Agents and Multi-agent Technologies, pp. 345-362.
-
(1999)
PAAM'99, Proceedings of the Fourth International Conference on the Practical Application of Agents and Multi-agent Technologies
, pp. 345-362
-
-
Sousa, P.1
Ramos, C.2
Neves, J.3
-
28
-
-
0142000462
-
Fabricare: An integrated view of a distributed manufacturing system
-
SOUSA, P., RAMOS, C., and NEVES, J., 2000a, Fabricare: an integrated view of a distributed manufacturing system. IAS-6, Proceedings of the sixth International Conference on Intelligent Autonomous Systems, pp. 423-428.
-
(2000)
IAS-6, Proceedings of the Sixth International Conference on Intelligent Autonomous Systems
, pp. 423-428
-
-
Sousa, P.1
Ramos, C.2
Neves, J.3
-
29
-
-
0141896640
-
Manufacturing entities with incomplete information
-
SOUSA, P., RAMOS, C., and NEVES, J., 2000b, Manufacturing entities with incomplete information. Studies in Informatics and Control Journal, 9(2), 79-88.
-
(2000)
Studies in Informatics and Control Journal
, vol.9
, Issue.2
, pp. 79-88
-
-
Sousa, P.1
Ramos, C.2
Neves, J.3
-
30
-
-
0141931113
-
Aspects of co-operation in distributed manufacturing systems
-
SOUSA, P., SILVA, N., HEIKKILA, T., KALLINGBAUM, M., and VALCKNEARS, P., 2000c, Aspects of co-operation in distributed manufacturing systems. Studies in Informatics and Control Journal, 9(2), 89-110.
-
(2000)
Studies in Informatics and Control Journal
, vol.9
, Issue.2
, pp. 89-110
-
-
Sousa, P.1
Silva, N.2
Heikkila, T.3
Kallingbaum, M.4
Valcknears, P.5
-
31
-
-
84904295520
-
Comparison of the bionic, fractal and holonic manufacturing concept
-
THARUMARAJAH, A., WELLS, A., and NEMES, L., 1996, Comparison of the bionic, fractal and holonic manufacturing concept. International Journal of Computer Integrated Manufacturing, 9(3), 217-226.
-
(1996)
International Journal of Computer Integrated Manufacturing
, vol.9
, Issue.3
, pp. 217-226
-
-
Tharumarajah, A.1
Wells, A.2
Nemes, L.3
-
33
-
-
2442637645
-
Holonic reconfiguration of manufacturing production by fuzzy multi-agent modelling
-
ULIERU, M., STEFANOIU, D., and NORRIE, D., 2000, Holonic reconfiguration of manufacturing production by fuzzy multi-agent modelling. IAS-6, Proceedings of the sixth International Conference on Intelligent Autonomous Systems, pp. 543-548.
-
(2000)
IAS-6, Proceedings of the Sixth International Conference on Intelligent Autonomous Systems
, pp. 543-548
-
-
Ulieru, M.1
Stefanoiu, D.2
Norrie, D.3
-
34
-
-
85008802627
-
Results of the holonic control system benchmark at KU Leuven
-
VALCKENEARS, P., BONNEVILLE, F., VAN BRUSSEL, H., BONGAERTS, L., and WYNS, J., 1994a, Results of the holonic control system benchmark at KU LEUVEN, Proceedings of the International Conference on Computer Integrated Manufacturing and Automation Technology, pp. 128-133.
-
(1994)
Proceedings of the International Conference on Computer Integrated Manufacturing and Automation Technology
, pp. 128-133
-
-
Valckenears, P.1
Bonneville, F.2
Van Brussel, H.3
Bongaerts, L.4
Wyns, J.5
-
35
-
-
0030674739
-
Holonic manufacturing systems
-
VALCKENEARS, P., VAN BRUSSEL, H., BONGAERTS, L., and WYNS, J., 1997, Holonic manufacturing systems. Journal of Integrated Computer Aided Engineer, 4(3), pp. 191-201.
-
(1997)
Journal of Integrated Computer Aided Engineer
, vol.4
, Issue.3
, pp. 191-201
-
-
Valckenears, P.1
Van Brussel, H.2
Bongaerts, L.3
Wyns, J.4
-
36
-
-
0141931115
-
IMS test case 5: Holonic manufacturing systems
-
VALCKENEARS, P., VAN BRUSSEL, H., BONNEVILLE, F., BONGAERTS, L., and WYNS, J., 1994b, IMS test case 5: holonic manufacturing systems. IMS Workshop at IFAC'94.
-
(1994)
IMS Workshop at IFAC'94
-
-
Valckenears, P.1
Van Brussel, H.2
Bonneville, F.3
Bongaerts, L.4
Wyns, J.5
|