메뉴 건너뛰기




Volumn 23, Issue 7-8, 2004, Pages 514-522

Function-based cost estimation integrating quality function deployment to support system design

Author keywords

Cost estimation; Quality function deployment (QFD); System design

Indexed keywords

CONCURRENT ENGINEERING; CONSTRAINT THEORY; COSTS; INDUSTRIAL ECONOMICS; PROBABILITY; QUALITY FUNCTION DEPLOYMENT; SPREADSHEETS; SYSTEMS ANALYSIS;

EID: 2442501663     PISSN: 02683768     EISSN: None     Source Type: Journal    
DOI: 10.1007/s00170-003-1564-7     Document Type: Article
Times cited : (16)

References (20)
  • 1
    • 0344865309 scopus 로고
    • Designing in quality
    • Huthwaite B (1988) Designing in quality. Quality 27(11):26-35
    • (1988) Quality , vol.27 , Issue.11 , pp. 26-35
    • Huthwaite, B.1
  • 3
    • 0033338994 scopus 로고    scopus 로고
    • The development of modular-based design in considering technology complexity
    • Tsai YT, Wang KS (1999) The development of modular-based design in considering technology complexity. Europ J Oper Res 119(3):138-149
    • (1999) Europ J Oper Res , vol.119 , Issue.3 , pp. 138-149
    • Tsai, Y.T.1    Wang, K.S.2
  • 6
    • 2442551260 scopus 로고    scopus 로고
    • A method of cost estimation of system in conceptual design stage
    • Tsai YT, Wang KS (2000) A method of cost estimation of system in conceptual design stage. Comm Manage Quart 1(2):139-152
    • (2000) Comm Manage Quart , vol.1 , Issue.2 , pp. 139-152
    • Tsai, Y.T.1    Wang, K.S.2
  • 8
    • 0031344631 scopus 로고    scopus 로고
    • Developing an integrated framework for feature-based early manufacturing cost estimation
    • Ou-Yang C, Lin TS (1997) Developing an integrated framework for feature-based early manufacturing cost estimation. Int J Adv Manufact Technol 13(9):618-629
    • (1997) Int J Adv Manufact Technol , vol.13 , Issue.9 , pp. 618-629
    • Ou-Yang, C.1    Lin, T.S.2
  • 9
    • 0032045102 scopus 로고    scopus 로고
    • Neural network approach for early cost estimation of packing products
    • Zhang YF, Fuh YJH (1998) Neural network approach for early cost estimation of packing products. Comput Indust Engin 34(2):433-450
    • (1998) Comput Indust Engin , vol.34 , Issue.2 , pp. 433-450
    • Zhang, Y.F.1    Fuh, Y.J.H.2
  • 10
    • 0030149622 scopus 로고    scopus 로고
    • Estimation knowledge: A conceptual framework for cost estimation
    • Samid G (1996) Estimation knowledge: a conceptual framework for cost estimation. Cost Engin 38(5):25-31
    • (1996) Cost Engin , vol.38 , Issue.5 , pp. 25-31
    • Samid, G.1
  • 11
    • 0031336193 scopus 로고    scopus 로고
    • Cost estimation prediction modeling: Regression versus neural networks
    • Smith AE, Mason AK (1997) Cost estimation prediction modeling: regression versus neural networks. Engin Econ 42(2):137-162
    • (1997) Engin Econ , vol.42 , Issue.2 , pp. 137-162
    • Smith, A.E.1    Mason, A.K.2
  • 12
    • 0030243226 scopus 로고    scopus 로고
    • Probabilistic cost estimation in advance of production in a computerized manufacturing system through stochastic geometric programming
    • Jha NK (1996) Probabilistic cost estimation in advance of production in a computerized manufacturing system through stochastic geometric programming. Comput Indust Engin 30(4):809-822
    • (1996) Comput Indust Engin , vol.30 , Issue.4 , pp. 809-822
    • Jha, N.K.1
  • 13
    • 0033354365 scopus 로고    scopus 로고
    • Cost estimation during the design step: The parametric method versus the case-based reasoning method
    • Duverlie P, Castelain JM (1999) Cost estimation during the design step: the parametric method versus the case-based reasoning method. Int J Adv Manufact Technol 15(12):895-906
    • (1999) Int J Adv Manufact Technol , vol.15 , Issue.12 , pp. 895-906
    • Duverlie, P.1    Castelain, J.M.2
  • 15
    • 0002458023 scopus 로고    scopus 로고
    • Measure costs right: Make the right decision
    • Cooper R, Kaplan RS (1998) Measure costs right: make the right decision. Harv Bus Rev 66:96-103
    • (1998) Harv Bus Rev , vol.66 , pp. 96-103
    • Cooper, R.1    Kaplan, R.S.2
  • 16
    • 2442511507 scopus 로고
    • Activity-based costing for improved costing
    • Bl. Warren, Gorham & Lamont, Boston
    • Cooper R (1992) Activity-based costing for improved costing. Handbook of Cost Management, Bl. Warren, Gorham & Lamont, Boston
    • (1992) Handbook of Cost Management
    • Cooper, R.1
  • 17
    • 0343096729 scopus 로고
    • Activity-based costing in cellular manufacturing systems
    • Dhavale DG (1993) Activity-based costing in cellular manufacturing systems. J Cost Manage 8(1):13-27
    • (1993) J Cost Manage , vol.8 , Issue.1 , pp. 13-27
    • Dhavale, D.G.1
  • 18
    • 0032307578 scopus 로고    scopus 로고
    • Cost engineering with quality function deployment
    • Bode JF, Richard YK (1998) Cost engineering with quality function deployment. Comput Indust Engin 35(3-4):587-590
    • (1998) Comput Indust Engin , vol.35 , Issue.3-4 , pp. 587-590
    • Bode, J.F.1    Richard, Y.K.2
  • 19
    • 0033100679 scopus 로고    scopus 로고
    • Green QFD-II: A life cycle approach for environmentally conscious manufacturing by integrating LCA and LCC into QFD matrices
    • Zhang Y, Wang HP, Zhang C (1999) Green QFD-II: a life cycle approach for environmentally conscious manufacturing by integrating LCA and LCC into QFD matrices. Int J Prod Res 37(5):1075-1091
    • (1999) Int J Prod Res , vol.37 , Issue.5 , pp. 1075-1091
    • Zhang, Y.1    Wang, H.P.2    Zhang, C.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.