Volumn 29, Issue 3, 2005, Pages 201-215

The development of grid code requirements for new and renewable forms of generation in Great Britain

Author keywords

Grid code; Renewable embedded generation; Technical performance requirements

Indexed keywords

ELECTRIC FREQUENCY CONTROL; ELECTRIC POWER GENERATION; ELECTRIC POWER TRANSMISSION NETWORKS; REACTIVE POWER; VOLTAGE CONTROL; WIND POWER;

EID: 24044476199     PISSN: 0309524X     EISSN: None     Source Type: Journal    
DOI: 10.1260/030952405774354903     Document Type: Article
Times cited : (10)

References (15)
  • 1
    • 33645595288 scopus 로고    scopus 로고
    • National Grid Company Plc The GB Seven Year Statement, May available at
    • National Grid Company plc The GB Seven Year Statement-, May 2005, available at http://www.nationalgrid.com/uk/library/documents/sys05/ default.asp
    • (2005)
  • 2
    • 33645587568 scopus 로고    scopus 로고
    • Modelling Wind Turbines in Power System Dynamics Simulations
    • Electrical Power Systems, Electrical Power Processing, Faculty of Information Technology and Systems, Delft University of Technology, P.O.Box 5031, 2600 GA Delft, The Netherlands
    • J.G. Slootweg, W.L. Kling, Modelling Wind Turbines in Power System Dynamics Simulations, Electrical Power Systems, Electrical Power Processing, Faculty of Information Technology and Systems, Delft University of Technology, P.O.Box 5031, 2600 GA Delft, The Netherlands.
    • Slootweg, J.G.1    Kling, W.L.2
  • 3
    • 33645603272 scopus 로고    scopus 로고
    • A Report to the Authority Pursuant to Paragraph 2 of Condition 7 of the Transmission Licence. - Proposed Grid Code Modification Grid Code Changes to Incorporate New Generation Technologies and DC Inter-Connectors (Generic Provisions)
    • National Grid Company plc, Consultation Reference H/04 dated 20 September available at
    • National Grid Company plc, A Report to the Authority Pursuant to Paragraph 2 of Condition 7 of the Transmission Licence. - Proposed Grid Code Modification Grid Code Changes to incorporate New Generation Technologies and DC Inter-connectors (Generic Provisions), Consultation Reference H/04 dated 20 September 2004, available at http://www.nationalgridinfo.co.uk/grid_code/pdfs/H04_Authrep_v1.pdf
    • (2004)
  • 4
    • 33645606646 scopus 로고    scopus 로고
    • Report on Consultation SA2004
    • Scottish Grid Code Review Panel, SP Transmission Ltd, Scottish Hydro-Electric Transmission Ltd, August Available at
    • Scottish Grid Code Review Panel, Report on Consultation SA2004, SP Transmission Ltd, Scottish Hydro-Electric Transmission Ltd, August 2004. Available at:- http://www.scottish-southern.co.uk/ssegroup/ KeyDocumentsPDFs/SA%202004%20Report.pdf
    • (2004)
  • 5
    • 20444427743 scopus 로고    scopus 로고
    • Grid Code, High and Extra High Voltage
    • E.ON Netz, E.ON Netz GmbH, Bayreuth, Germany, Status 1 August available at
    • E.ON Netz, Grid Code, High and Extra High Voltage, E.ON Netz GmbH, Bayreuth, Germany, Status 1 August 2003 available at http://www.eon-netz. com/Ressources/downloads/enenarhsengl.pdf
    • (2003)
  • 6
    • 0003748578 scopus 로고    scopus 로고
    • Specifications for Connecting Wind Farms to the Transmission Network
    • Eltra, Transmission System Planning, Eltra, Document Number 74557, Dated April available at
    • Eltra, Specifications for Connecting Wind Farms to the Transmission Network, Transmission System Planning, Eltra, Document Number 74557, Dated April 2000, available at http://www.eltra.dk/media/ showMedium.asp?12321_LCID1033
    • (2000)
  • 7
    • 24044441414 scopus 로고    scopus 로고
    • Wind Farm Power Stations Grid Code Provisions
    • ESB National Grid, ESB National Grid, Republic of Ireland, July available at
    • ESB National Grid, Wind Farm Power Stations Grid Code Provisions, ESB National Grid, Republic of Ireland, July 2004 available at:- http://www.eirgrid.com/EirGridPortal/uploads/Regulation%20and%20Pricing/ WFPS1%20version%201.6%2028-7-04.pdf
    • (2004)
  • 8
    • 33645590440 scopus 로고    scopus 로고
    • Hydro Quebec TransEnergie Technical Requirements for the Connection of Generation Facilities to the Hydro-Quebec Transmission System
    • Supplementary Requirements for Wind Generation,, May
    • Hydro Quebec TransEnergie Technical Requirements for the Connection of Generation Facilities to the Hydro-Quebec Transmission System, Supplementary Requirements for Wind Generation,, May 2003.
    • (2003)
  • 9
    • 33645591634 scopus 로고    scopus 로고
    • Value of fault ride through capability of wind generation in the UK
    • Centre for Distributed Generation and Sustainable Electrical Energy, the University of Manchester and the University of Strathclyde, PO Box 88, Manchester M60 1QD, October
    • T. Bopp and G Strbac, Value of fault ride through capability of wind generation in the UK, Centre for Distributed Generation and Sustainable Electrical Energy, the University of Manchester and the University of Strathclyde, PO Box 88, Manchester M60 1QD, October 2004.
    • (2004)
    • Bopp, T.1    Strbac, G.2
  • 11
    • 33645589893 scopus 로고    scopus 로고
    • Grid Code Changes to Incorporate New Generation Technologies and DC Inter-Connectors (Generic Provisions)
    • National Grid Company plc, - Grid Code Consultation Document, Consultation Reference H/04, 23 June -available at
    • National Grid Company plc, - Grid Code Changes to Incorporate New Generation Technologies and DC Inter-connectors (Generic Provisions) Grid Code Consultation Document, Consultation Reference H/04, 23 June 2004 -available at http://www.nationalgridinfo.co.uk/grid_code/pdfs/ aacp_h04.pdf
    • (2004)
  • 12
    • 26244447495 scopus 로고    scopus 로고
    • EON Netz GmbH, Bayreuth Germany available at
    • EON Netz GmbH, Wind Report 2004, Bayreuth, Germany available at http://www.eon-netz.com/frameset_reloader_homepage.phtml?top=Ressources/ frame_head_eng.jsp&bottom=frameset_english/energy_eng/ ene_windenergy_eng/ene_win_windreport_eng/ene_win_windreport_eng.jsp
    • Wind Report 2004
  • 13
    • 33645592593 scopus 로고    scopus 로고
    • "Grid Code Changes to Incorporate New Generation Technologies and DC Inter-connectors (Generic Provisions) and, SA/2004, "Consultation on Technical Requirements for Windfarms"
    • Ofgem, Decision and direction in relation to consultations H/04, Ofgem Publication Number 142/05, 27 May available at
    • Ofgem, Decision and direction in relation to consultations H/04, "Grid Code Changes to Incorporate New Generation Technologies and DC Inter-connectors (Generic Provisions) and, SA/2004, "Consultation on Technical Requirements for Windfarms" Ofgem Publication Number 142/05, 27 May 2005 available at http://www.ofgem.gov.uk/temp/ofgem/ cache/cmsattach/11576_Binderl.pdf
    • (2005)
  • 14
    • 33645594763 scopus 로고    scopus 로고
    • The Grid Code Issue Revision 10, 1
    • National Grid Company plc, June -available at
    • National Grid Company plc, The Grid Code Issue Revision 10, 1, June 2005 -available at http://www.nationalgrid.com/uk/indinfo/grid_code/ mn_current.html
    • (2005)
  • 15
    • 33645599010 scopus 로고    scopus 로고
    • Guidance Notes for Power Park Developers - Grid Code Connection Conditions Compliance Testing & Submission of the Compliance Report
    • National Grid Company plc, June - available at
    • National Grid Company plc, Guidance Notes for Power Park Developers - Grid Code Connection Conditions Compliance Testing & Submission of the Compliance Report, June 2005 - Issue 1,, available at http://www.nationalgrid.com/uk/indinfo/grid_code/pdfs/ Guidance_Notes_for_Power_Park_Developers_Issue1.pdf
    • (2005) , Issue.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.