-
1
-
-
23044532354
-
Optimal control of a two-stage tandem queuing system with flexible servers
-
Ahn, H.-S., Duenyas, I. and Lewis, M.E. (2002) Optimal control of a two-stage tandem queuing system with flexible servers. Probability in the Engineering and Information Sciences, 16, 453-469.
-
(2002)
Probability in the Engineering and Information Sciences
, vol.16
, pp. 453-469
-
-
Ahn, H.-S.1
Duenyas, I.2
Lewis, M.E.3
-
2
-
-
0022667867
-
Optimal control of production rate in a failure prone manufacturing system
-
Akella, R. and Kumar, P.R. (1986) Optimal control of production rate in a failure prone manufacturing system. IEEE Transactions on Automatic Control, 31(2), 116-126.
-
(1986)
IEEE Transactions on Automatic Control
, vol.31
, Issue.2
, pp. 116-126
-
-
Akella, R.1
Kumar, P.R.2
-
3
-
-
0024037430
-
Optimality of zero-inventory policies for unreliable manufacturing systems
-
Bielecki, T. and Kumar, P.R. (1988) Optimality of zero-inventory policies for unreliable manufacturing systems. Operations Research, 36(4), 532-541.
-
(1988)
Operations Research
, vol.36
, Issue.4
, pp. 532-541
-
-
Bielecki, T.1
Kumar, P.R.2
-
6
-
-
0002148183
-
Queueing systems with state dependent parameters
-
Dshalalow, J.H. (ed.), CRC Press, Boca Raton, FL, ch. 4
-
Dshalalow, J.H. (1997) Queueing systems with state dependent parameters, in Frontiers in Queueing, Dshalalow, J.H. (ed.), CRC Press, Boca Raton, FL, ch. 4.
-
(1997)
Frontiers in Queueing
-
-
Dshalalow, J.H.1
-
7
-
-
0000205109
-
Productivity and in process averages of 2 machines separated by a storage zone
-
Dubois, D. and Forestier, J.P. (1982) Productivity and in process averages of 2 machines separated by a storage zone. RAIRO-Automatique-Systems Analysis and Control, 16(2), 105-132.
-
(1982)
RAIRO-Automatique-Systems Analysis and Control
, vol.16
, Issue.2
, pp. 105-132
-
-
Dubois, D.1
Forestier, J.P.2
-
8
-
-
33645354628
-
Mapel file generating the solutions to the optimal control problem
-
Available at accessed
-
Filliger, R. (2005) Mapel file generating the solutions to the optimal control problem. Available at http://lpmwww.epfl.ch/users/filliger/ OptimalThresholds.html, accessed.
-
(2005)
-
-
Filliger, R.1
-
9
-
-
13544267426
-
Cooperative flow dynamics in production lines with buffer level dependent production rates
-
Filliger, R. and Hongler, M.-O. (2004) Cooperative flow dynamics in production lines with buffer level dependent production rates. European Journal of Operational Research, 167(1), 116-128.
-
(2004)
European Journal of Operational Research
, vol.167
, Issue.1
, pp. 116-128
-
-
Filliger, R.1
Hongler, M.-O.2
-
12
-
-
0029483502
-
A decomposition approach to flow control in tandem production systems
-
IEEE, Piscataway, NJ
-
Hu, J.-Q. (1995) A decomposition approach to flow control in tandem production systems, in Proceedings of the 34th IEEE Conference on Decision and Control, IEEE, Piscataway, NJ, pp. 3140-3143.
-
(1995)
Proceedings of the 34th IEEE Conference on Decision and Control
, pp. 3140-3143
-
-
Hu, J.-Q.1
-
13
-
-
0023532718
-
Exact and approximate solutions to two-stage transfer lines with general uptime and downtime distributions
-
Jafari, M.A. and Shanthikumar, J.G. (1987) Exact and approximate solutions to two-stage transfer lines with general uptime and downtime distributions. IIE Transactions, 19(4), 412-420.
-
(1987)
IIE Transactions
, vol.19
, Issue.4
, pp. 412-420
-
-
Jafari, M.A.1
Shanthikumar, J.G.2
-
14
-
-
0028392099
-
Optimal feedback production planning in a stochastic two-machine flowshop
-
Lou, S.X.C., Sethi, S.P. and Zhang, Q. (1994) Optimal feedback production planning in a stochastic two-machine flowshop. European Journal of Operational Research, 73, 331-345.
-
(1994)
European Journal of Operational Research
, vol.73
, pp. 331-345
-
-
Lou, S.X.C.1
Sethi, S.P.2
Zhang, Q.3
-
15
-
-
0020811703
-
The availability of a system of 2 unreliable machines connected by an intermediate storage tank
-
Malathronas, J.P., Perkins, J.D. and Smith, R.L. (1983) The availability of a system of 2 unreliable machines connected by an intermediate storage tank. IIE Transactions, 15(3), 195-201.
-
(1983)
IIE Transactions
, vol.15
, Issue.3
, pp. 195-201
-
-
Malathronas, J.P.1
Perkins, J.D.2
Smith, R.L.3
-
16
-
-
4344604402
-
Throughput in serial lines with state-dependent behavior
-
Powell, S.G. and Schultz, K.L. (2004) Throughput in serial lines with state-dependent behavior. Management Science, 50(8), 1095-1105.
-
(2004)
Management Science
, vol.50
, Issue.8
, pp. 1095-1105
-
-
Powell, S.G.1
Schultz, K.L.2
-
18
-
-
0344858917
-
Fuzzy work-in-process inventory control of unreliable manufacturing systems
-
Tsourveloudis, N.C., Dretoulakis, E. and Ioannidis, S. (2000) Fuzzy work-in-process inventory control of unreliable manufacturing systems. Information Sciences, 127, 69-83.
-
(2000)
Information Sciences
, vol.127
, pp. 69-83
-
-
Tsourveloudis, N.C.1
Dretoulakis, E.2
Ioannidis, S.3
-
19
-
-
0041416235
-
Analysis of a feedback fluid model for heterogeneous TCP sources
-
Van Foreest, N., Mandjess, M. and Scheinhardt, W. (2003) Analysis of a feedback fluid model for heterogeneous TCP sources. Stochastic Models, 19(3), 299-324.
-
(2003)
Stochastic Models
, vol.19
, Issue.3
, pp. 299-324
-
-
Van Foreest, N.1
Mandjess, M.2
Scheinhardt, W.3
-
20
-
-
0027666614
-
Production control for a tandem two-machine system
-
Van Ryzin, G., Lou, S.X.C. and Gershwin, S.B. (1993) Production control for a tandem two-machine system. IIE Transactions, 25(5), 5-20.
-
(1993)
IIE Transactions
, vol.25
, Issue.5
, pp. 5-20
-
-
Van Ryzin, G.1
Lou, S.X.C.2
Gershwin, S.B.3
-
21
-
-
0028383504
-
Optimal control of a two-station tandem production/inventory system
-
Veatch, M.H. and Wein, L.M. (1994) Optimal control of a two-station tandem production/inventory system. Operations Research, 42 (2), 337-350.
-
(1994)
Operations Research
, vol.42
, Issue.2
, pp. 337-350
-
-
Veatch, M.H.1
Wein, L.M.2
-
22
-
-
0018444869
-
The effect of interstage buffer storage on the output of two unreliable production units in series, with different production rates
-
Wijngaard, J. (1979) The effect of interstage buffer storage on the output of two unreliable production units in series, with different production rates. AIIE Transactions, 11(1), 42-47.
-
(1979)
AIIE Transactions
, vol.11
, Issue.1
, pp. 42-47
-
-
Wijngaard, J.1
|