메뉴 건너뛰기




Volumn 131, Issue 2, 2005, Pages 118-138

Investment model for power generation and transmission network expansion in Turkey

Author keywords

Electric power supply; Electric transmission; Investments; Turkey

Indexed keywords

OPERATING COSTS; POWER FLOW; TRANSMISSION NETWORK; TURKEY;

EID: 23744500997     PISSN: 07339402     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9402(2005)131:2(118)     Document Type: Article
Times cited : (5)

References (24)
  • 1
    • 0035425561 scopus 로고    scopus 로고
    • A mixed integer disjunctive model for transmission network expansion
    • Bahiense, L., Oliveira, G. C., Pereira, M., and Granville, S. (2001). "A mixed integer disjunctive model for transmission network expansion." IEEE Trans. Power Syst., 16(3), 560-565.
    • (2001) IEEE Trans. Power Syst. , vol.16 , Issue.3 , pp. 560-565
    • Bahiense, L.1    Oliveira, G.C.2    Pereira, M.3    Granville, S.4
  • 2
    • 0026910527 scopus 로고
    • Daily generation scheduling optimization with transmission constraints: A new class of algorithms
    • Batut, J., and Renaud, A. (1992). "Daily generation scheduling optimization with transmission constraints: A new class of algorithms." IEEE Trans. Power Syst., 7(3), 982-987.
    • (1992) IEEE Trans. Power Syst. , vol.7 , Issue.3 , pp. 982-987
    • Batut, J.1    Renaud, A.2
  • 3
    • 13544252315 scopus 로고    scopus 로고
    • Transmission planning for Indian power grid: A mixed integer programming approach
    • Chatuverdi, R., Bhattacharya, K., and Parikh, J. (1999). "Transmission planning for Indian power grid: A mixed integer programming approach." Int. Trans. Oper. Res., 6(5), 465-482.
    • (1999) Int. Trans. Oper. Res. , vol.6 , Issue.5 , pp. 465-482
    • Chatuverdi, R.1    Bhattacharya, K.2    Parikh, J.3
  • 4
    • 33644570131 scopus 로고    scopus 로고
    • Power transmission network design by a greedy randomized adaptive path relinking approach
    • submitted to PSCC'02
    • Faria, H., Binato, S., and Resende, M. G. C. (2001). "Power transmission network design by a greedy randomized adaptive path relinking approach." AT&T Labs Research Report, submitted to PSCC'02.
    • (2001) AT&T Labs Research Report
    • Faria, H.1    Binato, S.2    Resende, M.G.C.3
  • 5
    • 0032138092 scopus 로고    scopus 로고
    • Comparative studies on nonconvex optimization methods for transmission network expansion planning
    • Gallego, R. A., Monticelli, A., and Romero, R. (1998). "Comparative studies on nonconvex optimization methods for transmission network expansion planning." IEEE Trans. Power Syst., 13(3), 822-828.
    • (1998) IEEE Trans. Power Syst. , vol.13 , Issue.3 , pp. 822-828
    • Gallego, R.A.1    Monticelli, A.2    Romero, R.3
  • 8
    • 0035926743 scopus 로고    scopus 로고
    • A reliable approach for solving the transmission network expansion planning problem using genetic algorithms
    • Gil, H. A., and da Suva, E. L. (2001). "A reliable approach for solving the transmission network expansion planning problem using genetic algorithms." Electr. Power Syst. Res., 58(1), 45-51.
    • (2001) Electr. Power Syst. Res. , vol.58 , Issue.1 , pp. 45-51
    • Gil, H.A.1    Da Suva, E.L.2
  • 9
    • 0033884984 scopus 로고    scopus 로고
    • Hybrid fiber co-axial CATV network design with variable capacity optical network units
    • Gupta, R., and Pirkul, H. (2000). "Hybrid fiber co-axial CATV network design with variable capacity optical network units." Eur. J. Oper. Res., 123(1), 73-85.
    • (2000) Eur. J. Oper. Res. , vol.123 , Issue.1 , pp. 73-85
    • Gupta, R.1    Pirkul, H.2
  • 11
    • 13544266048 scopus 로고
    • An investment planning model for the electricity sector in Nigeria
    • Iwayemi, A. (1978). "An investment planning model for the electricity sector in Nigeria." Socio-Econ. Plan. Sci., 12, 285-292.
    • (1978) Socio-econ. Plan. Sci. , vol.12 , pp. 285-292
    • Iwayemi, A.1
  • 12
    • 0026206561 scopus 로고
    • A new decomposition based method for optimal expansion planning of large transmission networks
    • Levi, V. A., and Calovic, M. S. (1991). "A new decomposition based method for optimal expansion planning of large transmission networks." IEEE Trans. Power Syst., 6(3), 937-943.
    • (1991) IEEE Trans. Power Syst. , vol.6 , Issue.3 , pp. 937-943
    • Levi, V.A.1    Calovic, M.S.2
  • 13
    • 0035283824 scopus 로고    scopus 로고
    • Capacitated facility location/network design problems
    • Melkote, S., and Daskin, M. S. (2001). "Capacitated facility location/network design problems." Eur. J. Oper. Res., 129, 481-495.
    • (2001) Eur. J. Oper. Res. , vol.129 , pp. 481-495
    • Melkote, S.1    Daskin, M.S.2
  • 15
    • 0031198931 scopus 로고    scopus 로고
    • The effect of demand elasticity on security prices for the POOLCO and multi-lateral contract models
    • Rajaraman, R., Sarlashkar, J. V., and Alvarado, F. L. (1997). "The effect of demand elasticity on security prices for the POOLCO and multi-lateral contract models." IEEE Trans. Power Syst., 12(3), 1177-1184.
    • (1997) IEEE Trans. Power Syst. , vol.12 , Issue.3 , pp. 1177-1184
    • Rajaraman, R.1    Sarlashkar, J.V.2    Alvarado, F.L.3
  • 16
    • 0030086198 scopus 로고    scopus 로고
    • Transmission system expansion planning by simulated annealing
    • Romero, R., Gallego, R. A., and Monticelli, A. (1996). "Transmission system expansion planning by simulated annealing." IEEE Trans. Power Syst., 11(1), 364-369.
    • (1996) IEEE Trans. Power Syst. , vol.11 , Issue.1 , pp. 364-369
    • Romero, R.1    Gallego, R.A.2    Monticelli, A.3
  • 17
    • 0028371606 scopus 로고
    • A hierarchical decomposition approach for transmission network expansion planning
    • Romero, R., and Monticelli, A. (1994). "A hierarchical decomposition approach for transmission network expansion planning." IEEE Trans. Power Syst., 9(1), 373-380.
    • (1994) IEEE Trans. Power Syst. , vol.9 , Issue.1 , pp. 373-380
    • Romero, R.1    Monticelli, A.2
  • 18
    • 0026103230 scopus 로고
    • A new approach for solving extended unit commitment problem
    • Ruzic, S., and Rajakovic, N. (1991). "A new approach for solving extended unit commitment problem." IEEE Trans. Power Syst., 6(1), 269-277.
    • (1991) IEEE Trans. Power Syst. , vol.6 , Issue.1 , pp. 269-277
    • Ruzic, S.1    Rajakovic, N.2
  • 22
    • 0004492070 scopus 로고    scopus 로고
    • Transmission network planning: An efficient Benders' decomposition scheme
    • Tsamasphysrou, P., Renaud, A., and Carpentier, P. (1999). "Transmission network planning: An efficient Benders' decomposition scheme." Proc., 13th PSCC., 487-494.
    • (1999) Proc., 13th PSCC , pp. 487-494
    • Tsamasphysrou, P.1    Renaud, A.2    Carpentier, P.3
  • 23
    • 13544265194 scopus 로고    scopus 로고
    • DOE/EIA-M068, Energy Information Administration, U.S. Dept. of Energy, Washington, D.C.
    • U.S. Electricity Market Module (USEMM). (2001). "US electricity market module of the national energy modeling system." DOE/EIA-M068, Energy Information Administration, U.S. Dept. of Energy, Washington, D.C.
    • (2001) US Electricity Market Module of the National Energy Modeling System
  • 24
    • 0029356616 scopus 로고
    • Short term generation scheduling with transmission and environmental constraints using an Augmented Lagrangean Relaxation
    • Wang, S. J., Shahidehpour, S. M., Kirschen, D. S., Mokhtari, S., and Irisarri, G. D. (1995). "Short term generation scheduling with transmission and environmental constraints using an Augmented Lagrangean Relaxation." IEEE Trans. Power Syst., 10(3), 1294-1301.
    • (1995) IEEE Trans. Power Syst. , vol.10 , Issue.3 , pp. 1294-1301
    • Wang, S.J.1    Shahidehpour, S.M.2    Kirschen, D.S.3    Mokhtari, S.4    Irisarri, G.D.5


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.