메뉴 건너뛰기




Volumn 11, Issue 2, 2005, Pages 109-122

A framework to review performance measurement systems

Author keywords

Performance management; Performance measurement (quality)

Indexed keywords


EID: 23744478639     PISSN: 14637154     EISSN: None     Source Type: Journal    
DOI: 10.1108/14637150510591129     Document Type: Article
Times cited : (73)

References (37)
  • 6
    • 23744466001 scopus 로고    scopus 로고
    • Designing and implementing a balanced performance measurement system
    • Bourne, M.C.S. (1999), “Designing and implementing a balanced performance measurement system”, Control, July, pp. 21-3.
    • (1999) Control , vol.July , pp. 21-23
    • Bourne, M.C.S.1
  • 7
    • 0011790817 scopus 로고    scopus 로고
    • Capability Maturity Model Integration
    • Software Engineering Institute, Carnegie Mellon University, Pittsburgh, PA, available at:
    • CMMI (2002), “Capability Maturity Model Integration”, Software Engineering Institute, Carnegie Mellon University, Pittsburgh, PA, available at: www.sei/cmu.edu/cmmi.
    • (2002)
  • 9
    • 0025930128 scopus 로고
    • The performance measurement manifesto
    • Eccles, R.G. (1991), “The performance measurement manifesto”, Harvard Business Review, January/February, pp. 131-7.
    • (1991) Harvard Business Review , vol.January/February , pp. 131-137
    • Eccles, R.G.1
  • 11
    • 0004003238 scopus 로고    scopus 로고
    • European Foundation for Quality Management, Brussels.
    • European Foundation for Quality Management (2003), The EFQM Excellence Model, European Foundation for Quality Management, Brussels.
    • (2003) The EFQM Excellence Model
  • 14
    • 23744455950 scopus 로고    scopus 로고
    • International Organisation for Standardisation, Geneva.
    • ISO (2000), ISO 9000:2000, International Organisation for Standardisation, Geneva.
    • (2000) ISO 9000:2000
  • 17
    • 0026494564 scopus 로고
    • The balanced scorecard – measures that drive performance
    • Kaplan, R.S. and Norton, D.P. (1992), “The balanced scorecard – measures that drive performance”, Harvard Business Review, January/February, pp. 71-9.
    • (1992) Harvard Business Review , vol.January/February , pp. 71-79
    • Kaplan, R.S.1    Norton, D.P.2
  • 18
    • 2942627134 scopus 로고    scopus 로고
    • Performance measurement systems must be engineered
    • Article 3.
    • Kueng, P., Meier, A. and Wettsrein, T. (2001), “Performance measurement systems must be engineered”, Communications of the AIS, Vol. 7, Article 3.
    • (2001) Communications of the AIS , vol.7
    • Kueng, P.1    Meier, A.2    Wettsrein, T.3
  • 19
    • 0002008075 scopus 로고    scopus 로고
    • From balanced scorecard to strategic gauges: is measurement worth it?
    • Lingle, J.H. and Schiemann, W.A. (1996), “From balanced scorecard to strategic gauges: is measurement worth it?”, Management Review, Vol. 85 No. 3, pp. 56-62.
    • (1996) Management Review , vol.85 , Issue.3 , pp. 56-62
    • Lingle, J.H.1    Schiemann, W.A.2
  • 22
    • 0034396455 scopus 로고    scopus 로고
    • A framework for auditing and enhancing performance measurement systems
    • Medori, D. and Steeple, D. (2000), “A framework for auditing and enhancing performance measurement systems”, International Journal of Operations & Production Management, Vol. 20 No. 5, pp. 520-33.
    • (2000) International Journal of Operations & Production Management , vol.20 , Issue.5 , pp. 520-533
    • Medori, D.1    Steeple, D.2
  • 26
    • 0019276444 scopus 로고
    • Measuring total manufacturing performance
    • Richardson, P.R. and Gordon, J.R.M. (1980), “Measuring total manufacturing performance”, Sloan Management Review, Winter, pp. 47-58.
    • (1980) Sloan Management Review , vol.Winter , pp. 47-58
    • Richardson, P.R.1    Gordon, J.R.M.2
  • 27
    • 0016113958 scopus 로고
    • The decline, fall and renewal of manufacturing
    • Skinner, W. (1974), “The decline, fall and renewal of manufacturing”, Industrial Engineering, October, pp. 32-8.
    • (1974) Industrial Engineering , vol.October , pp. 32-38
    • Skinner, W.1
  • 28
    • 2942601132 scopus 로고    scopus 로고
    • A maturity model for performance measure systems
    • in Brebbia, C. and Pascola, P. (Eds), WIT Press, Southampton.
    • Wettstein, T. and Kueng, P.A. (2002), “A maturity model for performance measure systems”, in Brebbia, C. and Pascola, P. (Eds), Management Information Systems, WIT Press, Southampton.
    • (2002) Management Information Systems
    • Wettstein, T.1    Kueng, P.A.2
  • 29
    • 0002694190 scopus 로고
    • Link firm strategy to operating decisions through performance measurement
    • Wisner, J.D. and Fawcett, S.E. (1991), “Link firm strategy to operating decisions through performance measurement”, Production and Inventory Management Journal, 3rd quarter, pp. 5-11.
    • (1991) Production and Inventory Management Journal , vol.3rd quarter , pp. 5-11
    • Wisner, J.D.1    Fawcett, S.E.2
  • 30
    • 0002983916 scopus 로고
    • Creating a comprehensive system to measure performance
    • Eccles, R.G. and Pyburn, P. (1992), “Creating a comprehensive system to measure performance”, Management Accounting, October, pp. 41-4.
    • (1992) Management Accounting , vol.October , pp. 41-44
    • Eccles, R.G.1    Pyburn, P.2
  • 33
    • 84916465658 scopus 로고
    • A methodology for industrial studies of productivity performance
    • Moseng, B. and Bredrup, H. (1993), “A methodology for industrial studies of productivity performance”, Production Planning and Control, Vol. 4 No. 3.
    • (1993) Production Planning and Control , vol.4 , Issue.3
    • Moseng, B.1    Bredrup, H.2
  • 36
    • 0343749117 scopus 로고    scopus 로고
    • Performance management in manufacturing – a method for short term evaluation and diagnosis
    • PhD thesis, Eindhoven University of Technology, Eindhoven.
    • Stoop, P.P.M. (1996), “Performance management in manufacturing – a method for short term evaluation and diagnosis”, PhD thesis, Eindhoven University of Technology, Eindhoven.
    • (1996)
    • Stoop, P.P.M.1
  • 37
    • 0030645778 scopus 로고    scopus 로고
    • Performance prediction and diagnosis in two production departments
    • Stoop, P.P.M. and Bertrand, M.W. (1997), “Performance prediction and diagnosis in two production departments”, Integrated Manufacturing Systems, Vol. 8 No. 2, pp. 103-9.
    • (1997) Integrated Manufacturing Systems , vol.8 , Issue.2 , pp. 103-109
    • Stoop, P.P.M.1    Bertrand, M.W.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.