메뉴 건너뛰기




Volumn 23, Issue SUPPL. 1, 1999, Pages

Integrated decision support in flexible multipurpose plants

Author keywords

Flexible mulitpurpose plants; Integration; Scheduling; Supervisory control

Indexed keywords

INTEGRATION; SCHEDULING;

EID: 23544461869     PISSN: 00981354     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0098-1354(99)80135-5     Document Type: Conference Paper
Times cited : (5)

References (4)
  • 1
    • 79954553168 scopus 로고
    • An Integrated Computer- Aided Production Management System for Batch Chemical Processes
    • University of London
    • Cott, B. J. (1989). An Integrated Computer- Aided Production Management System for Batch Chemical Processes. PhD th esis. Imperial College, University of London.
    • (1989) PhD th esis. Imperial College
    • Cott, B.J.1
  • 2
    • 79954452753 scopus 로고
    • ISA S88.01-1995 Standard. Batch Control. Part
    • ISA (1995). S88.01-1995 Standard. Batch Control. Part 1: Models and Terminology.
    • (1995) Models and Terminology , vol.1
  • 3
    • 79954491450 scopus 로고    scopus 로고
    • ISA dS95.01 Draft 5. Ent erprise Integration. Part
    • ISA (1998). dS95.01 Draft 5. Ent erprise Integration. Part 1: Models.
    • (1998) Models , vol.1
  • 4
    • 0027545176 scopus 로고
    • A general algorithm for short-term scheduling of batch operations - I. MILP Formulation
    • Kondili, E., C. C. Pantelides and It:W. H. Sargent (1993). A general algorithm for short-term scheduling of batch operations - I. MILP Formulation. Compo chem. Eng. 17 .211-227
    • (1993) Compo chem. Eng , vol.17 , pp. 211-227
    • Kondili, E.1    Pantelides, C.C.2    Sargent, W.H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.