|
Volumn 85, Issue 7, 2005, Pages
|
Chemical operation experience with the Cottam CCPP
a a b b |
Author keywords
[No Author keywords available]
|
Indexed keywords
CHEMICAL OPERATIONS;
FAILURE (MECHANICAL);
FLOW OF FLUIDS;
GAS TURBINES;
MAGNETITE;
SYNCHRONIZATION;
TUBES (COMPONENTS);
WASTE HEAT UTILIZATION;
COTTAM COMBINED CYCLE POWER PLANT (CCPP);
GAS FLOW;
SIEMENS (CO);
SINGLE-SHAFT TECHNOLOGY;
POWER PLANTS;
|
EID: 23444446425
PISSN: 14353199
EISSN: None
Source Type: Trade Journal
DOI: None Document Type: Review |
Times cited : (1)
|
References (7)
|