메뉴 건너뛰기




Volumn 38, Issue 5, 2004, Pages 347-365

Optimal scheduling of rehabilitation activities for multiple pavement facilities: Exact and approximate solutions

Author keywords

[No Author keywords available]

Indexed keywords

COSTS; HIGHWAY BRIDGES; MATHEMATICAL MODELS; MATHEMATICAL PROGRAMMING; PAVEMENTS; PROBLEM SOLVING;

EID: 2342597206     PISSN: 09658564     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.tra.2003.10.007     Document Type: Article
Times cited : (141)

References (12)
  • 1
    • 2342469732 scopus 로고
    • A resource constrained capital budgeting model for bridge maintenance, rehabilitation and replacement
    • Al-Subhi K.M. Johnston D.W. Farid F. A resource constrained capital budgeting model for bridge maintenance, rehabilitation and replacement Transportation Research Record 1268 1990 110-117
    • (1990) Transportation Research Record , vol.1268 , pp. 110-117
    • Al-Subhi, K.M.1    Johnston, D.W.2    Farid, F.3
  • 3
    • 0019531738 scopus 로고
    • Influence of demand quality interrelationships in optimal policies for stage construction of transportation facilities
    • Fernandez J.E. Friesz T.L. Influence of demand quality interrelationships in optimal policies for stage construction of transportation facilities Transportation Science 15 1981 16-31
    • (1981) Transportation Science , vol.15 , pp. 16-31
    • Fernandez, J.E.1    Friesz, T.L.2
  • 4
    • 0018720409 scopus 로고
    • A model of optimal transport maintenance with demand responsiveness
    • Friesz T.L. Fernandez J.E. A model of optimal transport maintenance with demand responsiveness Transportation Research B 13 1979 317-339
    • (1979) Transportation Research B , vol.13 , pp. 317-339
    • Friesz, T.L.1    Fernandez, J.E.2
  • 5
    • 0026837119 scopus 로고
    • Optimal long-term scheduling of bridge deck replacement and rehabilitation
    • ASCE
    • Jacobs T.L. Optimal long-term scheduling of bridge deck replacement and rehabilitation Journal of Transportation Engineering, ASCE 118 2 1992 312-322
    • (1992) Journal of Transportation Engineering , vol.118 , Issue.2 , pp. 312-322
    • Jacobs, T.L.1
  • 6
    • 0036643294 scopus 로고    scopus 로고
    • A steady-state solution for the optimal pavement resurfacing problem
    • Li Y. Madanat S. A steady-state solution for the optimal pavement resurfacing problem Transportation Research Part A 36 2002 525-535
    • (2002) Transportation Research , vol.36 , Issue.PART A , pp. 525-535
    • Li, Y.1    Madanat, S.2
  • 7
    • 0022188142 scopus 로고
    • Optimal rehabilitation frequencies for highway pavements
    • Markow M. Balta W. Optimal rehabilitation frequencies for highway pavements Transportation Research Record 1035 1985 31-43
    • (1985) Transportation Research Record , vol.1035 , pp. 31-43
    • Markow, M.1    Balta, W.2
  • 10
    • 2342475528 scopus 로고
    • Quantifying the effectiveness of pavement maintenance and rehabilitation
    • Kuala Lumpur, Malaysia
    • Paterson, W.D.O., 1990a. Quantifying the effectiveness of pavement maintenance and rehabilitation. In: Proceedings at the 6th REAAA Conference, Kuala Lumpur, Malaysia
    • (1990) Proceedings at the 6th REAAA Conference
    • Paterson, W.D.O.1
  • 11
    • 0022900443 scopus 로고
    • International roughness index: Relationship to other measures of roughness and riding quality
    • Paterson W.D.O. International roughness index: Relationship to other measures of roughness and riding quality Transportation Research Record 1084 1990 49-59
    • (1990) Transportation Research Record , vol.1084 , pp. 49-59
    • Paterson, W.D.O.1
  • 12
    • 38149144449 scopus 로고
    • Trend curve optimal control model for highway pavement maintenance: Case study and evaluation
    • Tsunokawa K. Schofer J.L. Trend curve optimal control model for highway pavement maintenance: Case study and evaluation Transportation Research A 28 1994 151-166
    • (1994) Transportation Research A , vol.28 , pp. 151-166
    • Tsunokawa, K.1    Schofer, J.L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.