메뉴 건너뛰기




Volumn , Issue , 2003, Pages 703-711

Selection Procedure for Project Delivery and Contract Strategy

Author keywords

[No Author keywords available]

Indexed keywords

CONSTRUCTION INDUSTRY INSTITUTE (CII); CONTRACT STRATEGIES; PROJECT DELIVERY SYSTEMS;

EID: 2342442773     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (13)

References (14)
  • 1
    • 2342420434 scopus 로고    scopus 로고
    • Characteristics of integrated project delivery and contract strategy option
    • Construction Industry Institute, In press, Austin, Texas
    • Bowers D.D., Bhargava., R., and Andersen, S.D., (2002). "Characteristics of integrated project delivery and contract strategy option," Construction Industry Institute, Research Report 16511, In press, Austin, Texas.
    • (2002) Research Report , vol.165 , Issue.11
    • Bowers, D.D.1    Bhargava, R.2    Andersen, S.D.3
  • 3
    • 2342430371 scopus 로고    scopus 로고
    • Exceptional projects and methods of improving project performance
    • Construction Industry Institute Austin, Texas
    • "Exceptional projects and methods of improving project performance," (1999). Construction Industry Institute, Research Summary 124-1, Austin, Texas.
    • (1999) Research Summary , vol.124 , Issue.1
  • 4
    • 2342442939 scopus 로고
    • Flad & Associates, Madison, Wisconsin
    • "Delivery system selection matrix," (1994). Flad & Associates, Madison, Wisconsin.
    • (1994) Delivery System Selection Matrix
  • 5
    • 0017495672 scopus 로고    scopus 로고
    • How to use multiattribute utility measurement for social decision-making
    • Edwards, W., "How to use multiattribute utility measurement for social decision-making," IEEE Transactions on Systems, Man, and Cybernetics, SMC-7, (5), 326-337.
    • IEEE Transactions on Systems, Man, and Cybernetics , vol.SMC-7 , Issue.5 , pp. 326-337
    • Edwards, W.1
  • 6
    • 35548949549 scopus 로고
    • SMARTS and SMARTER: Improved simple methods for multiattribute utility measurement
    • Edwards, W., and Barron, F., (1994). SMARTS and SMARTER: improved simple methods for multiattribute utility measurement, Organizational Behavior and Human Decision Processes, 60, 3006-325.
    • (1994) Organizational Behavior and Human Decision Processes , vol.60 , pp. 3006-3325
    • Edwards, W.1    Barron, F.2
  • 9
    • 0029469867 scopus 로고
    • Risk management perceptions and trends of U.S. construction
    • Kangari, R., (1995). "Risk management perceptions and trends of U.S. construction." ASCE Journal of Construction Engineering and Management, 121(4), 422-429.
    • (1995) ASCE Journal of Construction Engineering and Management , vol.121 , Issue.4 , pp. 422-429
    • Kangari, R.1
  • 10
    • 2342430701 scopus 로고    scopus 로고
    • Project delivery and contract strategy selection
    • Construction Industry Institute, Austin, Texas
    • Oyetunji A., A., and Anderson, S.D. (2001). "Project delivery and contract strategy selection", Construction Industry Institute, Research Report 165-12, Austin, Texas.
    • (2001) Research Report , vol.165 , Issue.12
    • Oyetunji, A.A.1    Anderson, S.D.2
  • 11
    • 77955325084 scopus 로고    scopus 로고
    • Project delivery and contract strategy: A tool for owners
    • Construction Industry Institute, Austin, Texas
    • "Project delivery and contract strategy: a tool for owners," (2001). Construction Industry Institute, Implementation Resource 165-2, Austin, Texas.
    • (2001) Implementation Resource , vol.165 , Issue.2
  • 12
    • 2342421007 scopus 로고    scopus 로고
    • Project delivery systems: CM at risk, design-build, and design-bid-build
    • Construction Industry Institute, Austin, Texas
    • "Project delivery systems: CM at risk, design-build, and design-bid-build," (1998a). Construction Industry Institute, Research Report 133-11, Austin, Texas.
    • (1998) Research Report , vol.133 , Issue.11
  • 13
    • 2342421893 scopus 로고    scopus 로고
    • Project delivery system selection workbook
    • Construction Industry Institute, Austin, Texas
    • "Project delivery system selection workbook," (1998b). Construction Industry Institute, Implementation Resource 133-2, Austin, Texas.
    • (1998) Implementation Resource , vol.133 , Issue.2
  • 14
    • 2342444113 scopus 로고    scopus 로고
    • Reforming owner, contractor, supplier relationships: A breakthrough project delivery system
    • Construction Industry Institute, Austin, Texas
    • "Reforming owner, contractor, supplier relationships: a breakthrough project delivery system," (1998). Construction Industry Institute, Research Summary 130-1, Austin, Texas.
    • (1998) Research Summary , vol.130 , Issue.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.