메뉴 건너뛰기




Volumn 29, Issue 3, 2005, Pages 235-243

A workflow management system based-on construction project designing

Author keywords

Building design; Modeling; Monitoring; Simulating and optimizing workflow engine; Workflow management system

Indexed keywords

COMPUTER AIDED DESIGN; CONSTRUCTION INDUSTRY; MODEL STRUCTURES; MONITORING; OPTIMIZATION; PLANNING; STRUCTURAL DESIGN;

EID: 22944480247     PISSN: 01466518     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (3)

References (6)
  • 1
    • 0003408194 scopus 로고    scopus 로고
    • Application of Analytical Design Planning Technique to Construction Project Management
    • Austin, Andrew. B, Baizhani.L, Paul. W; Application of Analytical Design Planning Technique to Construction Project Management, Project management Journal, Vol. 31,No,2 (2000), pp. 48-59.
    • (2000) Project Management Journal , vol.31 , Issue.2 , pp. 48-59
    • Austin, A.B.1    Baizhani, L.2    Paul, W.3
  • 3
    • 22944483682 scopus 로고    scopus 로고
    • A Matrix Scheduling Method In Concurrent Design Process
    • Dong M, A Matrix Scheduling Method In Concurrent Design Process, Journal Of Tianjin University, Vol.30 No.4(1997)pp408-415
    • (1997) Journal Of Tianjin University , vol.30 , Issue.4 , pp. 408-415
    • Dong, M.1
  • 4
    • 22944474505 scopus 로고    scopus 로고
    • China Machine Press, Beijing
    • Lai K, Concurrent Design, China Machine Press, Beijing, 2003
    • (2003) Concurrent Design
    • Lai, K.1
  • 5
    • 0003671350 scopus 로고
    • Analysis and Management: Structure, Strategy and Design
    • Petrocelli Books, USA
    • Steward, D.V. Analysis and Management: Structure, Strategy and Design., Petrocelli Books, USA. 1981
    • (1981)
    • Steward, D.V.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.