-
1
-
-
0001463943
-
Estimating the traffic capacity of a signalized road junction
-
Allsop, R.E. (1972). Estimating the traffic capacity of a signalized road junction. Transportation Research, 6, 245–255.
-
(1972)
Transportation Research
, vol.6
, pp. 245-255
-
-
Allsop, R.E.1
-
2
-
-
0002800562
-
Evolving application of mathematical optimization in design and operation of individual signal-eontrolled road junctions
-
Clarendon Press, Oxford
-
Allsop, R.E. (1992). Evolving application of mathematical optimization in design and operation of individual signal-eontrolled road junctions, in J.D. Griffiths (Ed.) Mathematics in Transport and Planning and control, 1–24, Clarendon Press, Oxford.
-
(1992)
Mathematics in Transport and Planning and control
, pp. 1-24
-
-
Allsop, R.E.1
Griffiths, J.D.2
-
3
-
-
85025342394
-
Sequencing of traffic signals. Proceedings of IMA Conference in Mathematics in Transport Planning and Control
-
Heydecker, B.G. (1989). Sequencing of traffic signals. Proceedings of IMA Conference in Mathematics in Transport Planning and Control. Cardiff.
-
(1989)
Cardiff
-
-
Heydecker, B.G.1
-
4
-
-
0002896025
-
Calculation of signal settings to minimise delay at a junction
-
Elsevier, New York
-
Heydecker, B.G. and Dudgeon, I.W. (1987). Calculation of signal settings to minimise delay at a junction. In Transportation and Traffic Theory (Edited by Gartner N.H. and Wilson N.H.M.) pp. 159–178. Elsevier, New York.
-
(1987)
Gartner N.H. and Wilson N.H.M.)
, pp. 159-178
-
-
Heydecker, B.G.1
Dudgeon, I.W.2
-
5
-
-
0039411531
-
The traffic capacity of roundabouts. TRRL Report
-
Transport and Road Research Laboratory, Crowthorne
-
Kimber, R.M. (1980). The traffic capacity of roundabouts. TRRL Report, LR942, Transport and Road Research Laboratory, Crowthorne.
-
(1980)
LR942
-
-
Kimber, R.M.1
-
6
-
-
0344208510
-
The traffic capacity of major/minor priority junctions. TRRL Report
-
Transport and Road Research Laboratory, Crowthorne
-
Kimber, R.M. and Coombe, R.D. (1980). The traffic capacity of major/minor priority junctions. TRRL Report, SR582, Transport and Road Research Laboratory, Crowthorne.
-
(1980)
SR582
-
-
Kimber, R.M.1
Coombe, R.D.2
-
7
-
-
0016565756
-
An efficient approach to solving the road network equilibrium traffic assignment problem
-
LeBlanc, L. J., Morlok, E.K. and Pierskalla, W. (1975). An efficient approach to solving the road network equilibrium traffic assignment problem. Transportation Research, 9, 309–318.
-
(1975)
Transportation Research
, vol.9
, pp. 309-318
-
-
LeBlanc, L.J.1
Morlok, E.K.2
Pierskalla, W.3
-
8
-
-
0024108601
-
Sensitivity analysis for equilibrium network flows
-
Tobin, R.L and Friesz, T.L (1988). Sensitivity analysis for equilibrium network flows. Transportation Science, 22, 242–250.
-
(1988)
Transportation Science
, vol.22
, pp. 242-250
-
-
Tobin, R.L.1
Friesz, T.L.2
-
9
-
-
85025306083
-
-
Transport Planning and Design Manual, Hong Kong
-
Transport Department (1984). Highway design characteristics, Vol. 2, Transport Planning and Design Manual, Hong Kong.
-
(1984)
Highway design characteristics, Vol. 2
-
-
-
10
-
-
85025376197
-
-
Transport Planning and Design Manual, Hong Kong
-
Transport Department (1986). Road traffic signals, Vol. 4, Transport Planning and Design Manual, Hong Kong.
-
(1986)
Road traffic signals, Vol. 4
-
-
-
12
-
-
0030396407
-
On the reserve capacities of priority junctions and roundabouts
-
Wong, S.C. (1996). On the reserve capacities of priority junctions and roundabouts. Transportation Research, 30B, 441–453.
-
(1996)
Transportation Research
, vol.30B
, pp. 441-453
-
-
Wong, S.C.1
-
13
-
-
85025318346
-
Comparative analysis of various approaches to equilibrium traffic signal settings. Paper presented at the 4th Meeting of the EURO Working Group on Transportation
-
Newcastle upon Tyne, United Kingdom
-
Wong, S.C. and Yang, H. (1996a). Comparative analysis of various approaches to equilibrium traffic signal settings. Paper presented at the 4th Meeting of the EURO Working Group on Transportation, 9–11 September, Newcastle upon Tyne, United Kingdom.
-
(1996)
9–11 September
-
-
Wong, S.C.1
Yang, H.2
-
14
-
-
85025349538
-
-
Wong, S.C. and Yang, H. (1996b). Reserve capacity of a signal-controlled road network. Transportation Research Part B, in press
-
Wong, S.C. and Yang, H. (1996b). Reserve capacity of a signal-controlled road network. Transportation Research Part B, in press.
-
-
-
-
15
-
-
0016049580
-
Capacity of a signalized road junction: Critique and extensions
-
Yagar, S. (1974). Capacity of a signalized road junction:critique and extensions. Transportation Research, 8,137 -147.
-
(1974)
Transportation Research
, vol.8
, pp. 137-147
-
-
Yagar, S.1
-
16
-
-
0008353541
-
-
Yagar, S. (1985). Addressing errors and omissions in papers on intersection capacity maximization. Transportation Research, 19B, 81–84
-
Yagar, S. (1985). Addressing errors and omissions in papers on intersection capacity maximization. Transportation Research, 19B, 81–84.
-
-
-
-
17
-
-
0029271191
-
Traffic assignment and signal control in saturated road networks
-
Yang, H. and Yagar, S. (1995). Traffic assignment and signal control in saturated road networks. Transportation Research. 29A, 125–139.
-
(1995)
Transportation Research
, vol.29A
, pp. 125-139
-
-
Yang, H.1
Yagar, S.2
-
18
-
-
0031062320
-
Sensitivity analysis for the elastic-demand network equilibrium problem with applications
-
Yang, H. (1997). Sensitivity analysis for the elastic-demand network equilibrium problem with applications. Transportation Research, 31B, 55–70.
-
(1997)
Transportation Research
, vol.31B
, pp. 55-70
-
-
Yang, H.1
|