|
Volumn , Issue , 2005, Pages 753-758
|
Managing pressures during underbalanced cementing by choking the return flow; Innovative design and operational modeling as well as operational lessons
|
Author keywords
[No Author keywords available]
|
Indexed keywords
CEMENTING;
CHOKING;
PRESSURE DRILLING;
WATER FLUX;
BOREHOLES;
CEMENTING (SHAFTS);
COMPUTER SIMULATION;
DRILLING;
ELECTRIC INDUCTORS;
MUD LOGGING;
PRESSURE CONTROL;
REAL TIME SYSTEMS;
OIL FIELDS;
|
EID: 22344445020
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: None Document Type: Conference Paper |
Times cited : (29)
|
References (7)
|