-
1
-
-
84888894997
-
Pressurized mud cap drilling from a semi-submersible drilling unit
-
Shell Malaysia, Signa Engineering
-
Pressurized Mud Cap Drilling from a Semi-Submersible Drilling Unit, J. Terwogt, Shell Malaysia, George H. Medley, Signa Engineering, 2004 SPE/IADC Drilling Conference
-
2004 SPE/IADC Drilling Conference
-
-
Terwogt, J.1
Medley, G.H.2
-
2
-
-
33750992624
-
Application of an automated choke manifold for maintaining a constant bottomhole pressure while drilling
-
Shell SIEP
-
Application of an Automated Choke Manifold for Maintaining a Constant Bottomhole Pressure while Drilling, Don Reitsma, Shell SIEP, 2004 SPE/IADC Drilling Conference
-
2004 SPE/IADC Drilling Conference
-
-
Reitsma, D.1
-
3
-
-
84888915995
-
New downhole isolation valve technology reduces costs and increases capabilities of underbalanced drilling and completion programs in the Southern North Sea
-
Weatherford Drilling & Well Services, Weatherford International, Inc.
-
New Downhole Isolation Valve Technology Reduces Costs and Increases Capabilities of Underbalanced Drilling and Completion Programs in the Southern North Sea, I. C. Sutherland, Weatherford Drilling & Well Services, Brian Grayson, Weatherford International, Inc., 2004 SPE/IADC Drilling Conference
-
2004 SPE/IADC Drilling Conference
-
-
Sutherland, I.C.1
Grayson, B.2
-
4
-
-
84888914028
-
Well control considerations for underbalanced drilling
-
SPE #38594
-
Well Control Considerations for Underbalanced Drilling, Adam Ted Bourgoyne, Jr., SPE #38594, Distinguished Lecturer Series
-
Distinguished Lecturer Series
-
-
Bourgoyne Jr., A.T.1
-
7
-
-
84888894396
-
Redefining the environmental envelope for surface BOPS on a semi-submersible drilling unit
-
Redefining the Environmental Envelope for Surface BOPS on a Semi-Submersible Drilling Unit, Kevin T. Gallagher, David F. Bond, 2001 SPE/IADC Drilling Conference # 67709
-
2001 SPE/IADC Drilling Conference # 67709
-
-
Gallagher, K.T.1
Bond, D.F.2
-
8
-
-
33745256331
-
-
2002 SPE # 74533
-
Design of a Drilling Rig for 10,000' Water Depth using a Pressured Riser, Colin Leach, K. Dupal, C. Hakulin, B. Fossli, J. Dech, 2002 SPE # 74533
-
Design of a Drilling Rig for 10,000' Water Depth Using a Pressured Riser
-
-
Leach, C.1
Dupal, K.2
Hakulin, C.3
Fossli, B.4
Dech, J.5
-
10
-
-
84888887850
-
Petrobras looks to a smarter future
-
Article by Rick Von Flatern, October
-
Petrobras Looks To A Smarter Future, Article by Rick Von Flatern, p. 27-32, Offshore Engineer, October 2001
-
(2001)
Offshore Engineer
, pp. 27-32
-
-
-
13
-
-
84888928104
-
-
Weatherford International, Inc., WOCD-0306-03, March 6-7
-
Rotary Drilling with Casing-A Field Proven Method of Reducing Wellbore Constructions Cost, Greg Galloway, Weatherford International, Inc., WOCD-0306-03, March 6-7, 2003
-
(2003)
Rotary Drilling with Casing-A Field Proven Method of Reducing Wellbore Constructions Cost
-
-
Galloway, G.1
-
14
-
-
0012765041
-
The 1999 LSU/MMS well control workshop: An overview
-
June
-
The 1999 LSU/MMS Well Control Workshop: An Overview, John Rogers Smith, World Oil, June 1999
-
(1999)
World Oil
-
-
Smith, J.R.1
-
15
-
-
84888914125
-
UBD technology offers pathway to solving complex reservoir problems
-
February
-
UBD Technology Offers Pathway to Solving Complex Reservoir Problems, D. Brant Bennion, The American Oil & Gas Reporter, February 1999
-
(1999)
The American Oil & Gas Reporter
-
-
Bennion, D.B.1
-
16
-
-
33745285214
-
Well control consideration of UB technology in marine environments
-
Weatherford International, Inc., University of Oklahoma Blowout Prevention School
-
Well Control Consideration of UB Technology in marine environments, Don Hannegan, Weatherford International, Inc., Glen Wanzer, University of Oklahoma Blowout Prevention School, 2003 SPE/IADC Drilling Conference #72985
-
(2003)
SPE/IADC Drilling Conference #72985
-
-
Hannegan, D.1
Wanzer, G.2
-
17
-
-
84888917372
-
-
GoM Shelf Gas Wells, 1993-2002water depth <600', James K. Dodson Company Study IADC UBO MPD Sub-committee Meeting Minutes, Leiden, The Netherlands, March 13
-
Problem Incidents Database, GoM Shelf Gas Wells, 1993-2002; water depth <600', James K. Dodson Company Study IADC UBO MPD Sub-committee Meeting Minutes, Leiden, The Netherlands, March 13, 2004
-
(2004)
Problem Incidents Database
-
-
|