-
1
-
-
0024629988
-
Knowledge-based computer aided design of materials handling systems
-
Paula G. P., Brown D. E., "Knowledge-Based Computer Aided Design of Materials Handling Systems", IEEE Transactions on Systems, Man, and Cybernetics, 19, 2, 188-196, 1989.
-
(1989)
IEEE Transactions on Systems, Man, and Cybernetics
, vol.19
, Issue.2
, pp. 188-196
-
-
Paula, G.P.1
Brown, D.E.2
-
2
-
-
3343004889
-
A hybrid knowledge based optimization system for automated selection of materials handling system
-
Welgama P.S., Gibson P.R., "A Hybrid Knowledge Based Optimization System for Automated Selection of Materials Handling System", Computers Ind. Engng, 28, 2, 205-217, 1995.
-
(1995)
Computers Ind. Engng
, vol.28
, Issue.2
, pp. 205-217
-
-
Welgama, P.S.1
Gibson, P.R.2
-
3
-
-
0035944497
-
Integration of expert system with analytic hierarchy process for the design of material handling equipment system
-
Chan F.T.S., Ip R.W.L., Lau H., "Integration of Expert System with Analytic Hierarchy Process for the Design of Material Handling Equipment System", Journal of Materials Processing Technology, 116, 137-145, 2001.
-
(2001)
Journal of Materials Processing Technology
, vol.116
, pp. 137-145
-
-
Chan, F.T.S.1
Ip, R.W.L.2
Lau, H.3
-
4
-
-
0036190246
-
Design of material handling equipment selection system: An integration of expert system with analytic hierarchy process approach
-
Chan F.T.S., "Design of Material Handling Equipment Selection System: An Integration of Expert System with Analytic Hierarchy Process Approach", Integrated Manufacturing Systems, 13, 1, 58-68, 2002.
-
(2002)
Integrated Manufacturing Systems
, vol.13
, Issue.1
, pp. 58-68
-
-
Chan, F.T.S.1
-
8
-
-
0001532342
-
Icmese: Intelligent consultant system for material handling equipment selection and evaluation
-
Park Y. B., "Icmese: Intelligent Consultant System for Material Handling Equipment Selection and Evaluation", Journal of Manufacturing Systems, 15, 5, 325-333, 1996.
-
(1996)
Journal of Manufacturing Systems
, vol.15
, Issue.5
, pp. 325-333
-
-
Park, Y.B.1
-
9
-
-
0035247760
-
A decision support system for economic justfication of material handling investments
-
Usher J.S., Kamal, A.H., Kim S.W., "A Decision Support System for Economic Justfication of Material Handling Investments", Computers & Industrial Engineering, 39, 35-47, 2001.
-
(2001)
Computers & Industrial Engineering
, vol.39
, pp. 35-47
-
-
Usher, J.S.1
Kamal, A.H.2
Kim, S.W.3
-
10
-
-
0030420260
-
Design and evaluation of automated cellular manufacturing systems with simulation modelling and AHP approach: A case study
-
Chan F.T.S., Abhary K., "Design and Evaluation of Automated Cellular Manufacturing Systems with Simulation Modelling and AHP Approach: A Case Study", Integrated Manufacturing Systems, 7, 6, 39-52, 1996.
-
(1996)
Integrated Manufacturing Systems
, vol.7
, Issue.6
, pp. 39-52
-
-
Chan, F.T.S.1
Abhary, K.2
-
11
-
-
2342524583
-
İmalat Firmalarinda Başariyi Saǧlayan Koşul ve Uygulamalari Kriter Olarak Kullanan Bir Perfbrmans Ölçüm Sistemi
-
Yurdakul M., İç Y. T., "İmalat Firmalarinda Başariyi Saǧlayan Koşul ve Uygulamalari Kriter Olarak Kullanan Bir Perfbrmans Ölçüm Sistemi", Gazi Üniversitesi Mühendislik-Mimarlik Fakültesi Dergisi, Cilt 14, No 2, 73-90, 1999.
-
(1999)
Gazi Üniversitesi Mühendislik-mimarlik Fakültesi Dergisi
, vol.14
, Issue.2
, pp. 73-90
-
-
Yurdakul, M.1
Iç, Y.T.2
-
12
-
-
2342650033
-
Analitik Hiyerarşi Sürecini (AHS) Kullanan Bir Kredi Deǧerlendirme Sistemi
-
İç Y. T., Yurdakul M., "Analitik Hiyerarşi Sürecini (AHS) Kullanan Bir Kredi Deǧerlendirme Sistemi", Gazi Üniversitesi Mühendislik-Mimarlik Fakültesi Dergisi, Cilt 15, No 1, 1-14, 2000.
-
(2000)
Gazi Üniversitesi Mühendislik-mimarlik Fakültesi Dergisi
, vol.15
, Issue.1
, pp. 1-14
-
-
Iç, Y.T.1
Yurdakul, M.2
-
13
-
-
2342585723
-
Üretim Firmalarinin Kredibilitelerinin Belirlenmesinde Analitik Hiyerarşi Prosesi Yönteminin Kullanilmasi
-
Yurdakul M., İç Y. T., "Üretim Firmalarinin Kredibilitelerinin Belirlenmesinde Analitik Hiyerarşi Prosesi Yönteminin Kullanilmasi", Gazi Üniversitesi Fen Bilimleri Enstitüsü Dergisi, Cilt 13, No 4, 1007-1021, 2000.
-
(2000)
Gazi Üniversitesi fen Bilimleri Enstitüsü Dergisi
, vol.13
, Issue.4
, pp. 1007-1021
-
-
Yurdakul, M.1
Iç, Y.T.2
-
16
-
-
0042158215
-
Development of a multi-attribute selection procedure for non-traditional machining processes
-
Yurdakul M., Çoǧun C, "Development of a Multi-attribute Selection Procedure for Non-traditional Machining Processes", Proceedings of the Institution of Mechanical Engineers-Part B: Journal of Engineering Manufacture, Vol. 217, Issue 7, 993-1009, 2003.
-
(2003)
Proceedings of the Institution of Mechanical Engineers-part B: Journal of Engineering Manufacture
, vol.217
, Issue.7
, pp. 993-1009
-
-
Yurdakul, M.1
Çoǧun, C.2
-
17
-
-
2342483023
-
Turk Otomotiv Firmalarmm Performans Ölçümü ve Analizine Yönelik TOPSIS Yöntemini Kullanan Bir Örnek Çalişma
-
Yurdakul M., İç Y. T., "Turk Otomotiv Firmalarmm Performans Ölçümü ve Analizine Yönelik TOPSIS Yöntemini Kullanan Bir Örnek Çalişma", Gazi Üniversitesi Mühendislik-Mimarlik Fakültesi Dergisi, Cilt 18, No 1, 1-18, 2003.
-
(2003)
Gazi Üniversitesi Mühendislik-mimarlik Fakültesi Dergisi
, vol.18
, Issue.1
, pp. 1-18
-
-
Yurdakul, M.1
Iç, Y.T.2
-
18
-
-
84888921301
-
Topsis Yöntemi İle Robot Seçimi
-
Gazi Üniversitesi Mühendislik Mimarhk Fakültesi Makina Mühendisliǧi Bölümü, Ankara, Bildiri Kitabi 4-6 Eylül
-
Yurdakul M., Mutlu S., İç Y. T., "Topsis Yöntemi İle Robot Seçimi". UMTS 2003 11. Ulusal Makina Teorisi Sempozyumu, Gazi Üniversitesi Mühendislik Mimarhk Fakültesi Makina Mühendisliǧi Bölümü, Ankara, Bildiri Kitabi 2, 633-642, 4-6 Eylül 2003.
-
(2003)
UMTS 2003 11. Ulusal Makina Teorisi Sempozyumu
, vol.2
, pp. 633-642
-
-
Yurdakul, M.1
Mutlu, S.2
Iç, Y.T.3
-
20
-
-
0033080125
-
An integrated approach for facility layout, P/D location and material handling system design
-
Chittratanawat S., Noble J.S., "An Integrated Approach for Facility Layout, P/D Location and Material Handling System Design", International Journal of Production Research, 37, 3, 683-706, 1999.
-
(1999)
International Journal of Production Research
, vol.37
, Issue.3
, pp. 683-706
-
-
Chittratanawat, S.1
Noble, J.S.2
|