메뉴 건너뛰기




Volumn 6, Issue 1, 1997, Pages 51-66

System dynamics in software project management: Towards the development of a formal integrated framework

Author keywords

[No Author keywords available]

Indexed keywords


EID: 21744459875     PISSN: 0960085X     EISSN: 14769344     Source Type: Journal    
DOI: 10.1057/palgrave.ejis.3000256     Document Type: Article
Times cited : (32)

References (51)
  • 3
    • 0001022016 scopus 로고    scopus 로고
    • Formal aspects of model validity and validation in system dynamics
    • Barlas Y (1996) Formal aspects of model validity and validation in system dynamics. System Dynamics Review 12(3), 183-210.
    • (1996) System Dynamics Review , vol.12 , Issue.3 , pp. 183-210
    • Barlas, Y.1
  • 6
    • 0023327532 scopus 로고
    • No silver bullet: Essence and accidents of software engineering
    • Brooks FP (1987) No silver bullet: essence and accidents of software engineering. Computer 20 (4), 10-19.
    • (1987) Computer , vol.20 , Issue.4 , pp. 10-19
    • Brooks, F.P.1
  • 7
    • 84984736114 scopus 로고    scopus 로고
    • To be published in the Proc. of the NATO Advanced Research Workshop 951491, 13-15 November, Kluwer Publishers, Kiev, Ukraine. Netherlands
    • Conrad TP (1996) Managing Complex Software Projects. (To be published in the Proc. of the NATO Advanced Research Workshop 951491, 13-15 November, Kluwer Publishers, Kiev, Ukraine. Netherlands).
    • (1996) Managing Complex Software Projects
    • Conrad, T.P.1
  • 8
    • 83755202997 scopus 로고
    • Naval ship production: A claim settled and a framework build
    • Cooper KG (1980) Naval ship production: a claim settled and a framework build. INTERFACES 10(6), 30-36.
    • (1980) INTERFACES , vol.10 , Issue.6 , pp. 30-36
    • Cooper, K.G.1
  • 9
    • 0001975372 scopus 로고
    • The $2000 hour: How managers influence project performance through the rework cycle
    • Cooper, KG (1994) The $2000 hour: how managers influence project performance through the rework cycle. Project Management Journal 25(1), 11-24.
    • (1994) Project Management Journal , vol.25 , Issue.1 , pp. 11-24
    • Cooper, K.G.1
  • 10
    • 84984723191 scopus 로고    scopus 로고
    • (To be published in the Proc. of the NATO Advanced Research Workshop 951491, 13-15 November, Kiev, Ukraine. Kluwer Publishers, Netherlands
    • Cooper KG (1996) System Dynamics Methods in Complex Project Management. (To be published in the Proc. of the NATO Advanced Research Workshop 951491, 13-15 November, Kiev, Ukraine. Kluwer Publishers, Netherlands).
    • (1996) System Dynamics Methods in Complex Project Management.
    • Cooper, K.G.1
  • 11
    • 0003317524 scopus 로고
    • Swords and plowshares: The rework cycles of defence and commercial software development projects
    • Cooper KG and Mullen T (1993) Swords and plowshares: the rework cycles of defence and commercial software development projects. American Programmer 6(5), 41-51.
    • (1993) American Programmer , vol.6 , Issue.5 , pp. 41-51
    • Cooper, K.G.1    Mullen, T.2
  • 14
    • 21344490701 scopus 로고
    • A conflict between the use of estimating and planning tools in the management of information systems
    • Edwards J and Moores T (1994) A conflict between the use of estimating and planning tools in the management of information systems. European Journal of Information Systems 3(2), 139-147.
    • (1994) European Journal of Information Systems , vol.3 , Issue.2 , pp. 139-147
    • Edwards, J.1    Moores, T.2
  • 18
    • 0012166621 scopus 로고
    • Lund Studentlitteratur Bromley Chartwell-Bratt
    • Gilb T (1982) Software Metrics. Lund Studentlitteratur Bromley Chartwell-Bratt.
    • (1982) Software Metrics
    • Gilb, T.1
  • 22
    • 0042502553 scopus 로고
    • Partial-model testing as a validation tool for system dynamics
    • July 1983, Chestnut Hill, USA
    • Homer JB (1983) Partial-model testing as a validation tool for system dynamics. In Proceedings of the 1983 International System Dynamics Conference, July 1983, Chestnut Hill, USA, pp 919-932.
    • (1983) Proceedings of the 1983 International System Dynamics Conference , pp. 919-932
    • Homer, J.B.1
  • 24
    • 24044540130 scopus 로고
    • Measuring Software Development
    • Rook P, Imprint London; New York: Elsevier Applied Science
    • Kitchenham B (1990) Measuring Software Development. In Software Reliability Handbook (Rook P, Ed), pp 303-331, Imprint London; New York: Elsevier Applied Science.
    • (1990) Software Reliability Handbook , pp. 303-331
    • Kitchenham, B.1
  • 25
    • 0028486026 scopus 로고
    • A b-distributed stochastic Petri net model for software project time/cost management
    • Lee G and Murata T (1994) A b-distributed stochastic Petri net model for software project time/cost management. Journal of Systems and Software 26, 149-165.
    • (1994) Journal of Systems and Software , vol.26 , pp. 149-165
    • Lee, G.1    Murata, T.2
  • 26
    • 0028427020 scopus 로고
    • PM-Net: A software project management representation model
    • Lee K, Lu I and Lin H (1994) PM-Net: a software project management representation model. Information and Software Technology 36(5), 295-308.
    • (1994) Information and Software Technology , vol.36 , Issue.5 , pp. 295-308
    • Lee, K.1    Lu, I.2    Lin, H.3
  • 27
    • 0024737424 scopus 로고
    • Computer-aided software development process design
    • Lin C and Levary R (1989) Computer-aided software development process design. IEEE Transaction on Software Engineering 15(9), 1025-1037.
    • (1989) IEEE Transaction on Software Engineering , vol.15 , Issue.9 , pp. 1025-1037
    • Lin, C.1    Levary, R.2
  • 28
    • 84984737305 scopus 로고
    • Walking on battlefields: Tools for strategic software management
    • Lin C (1993) Walking on battlefields: tools for strategic software management. American Programmer 6(5), 33-40.
    • (1993) American Programmer , vol.6 , Issue.5 , pp. 33-40
    • Lin, C.1
  • 32
    • 14844293794 scopus 로고
    • Could large UK corporations and computing companies use software estimating tools? A survey
    • Moores T and Edwards J (1992) Could large UK corporations and computing companies use software estimating tools? A survey. European Journal of Information Systems 1(5), 311-319.
    • (1992) European Journal of Information Systems , vol.1 , Issue.5 , pp. 311-319
    • Moores, T.1    Edwards, J.2
  • 36
    • 0042623636 scopus 로고
    • PA Consulting, Cambridge, MA
    • Pugh Roberts Associates - PA Consulting Group (1993) PMMS - Program Management Modeling System. PA Consulting, Cambridge, MA.
    • (1993) PMMS - Program Management Modeling System
  • 38
    • 0000228602 scopus 로고    scopus 로고
    • System dynamics in project management: A comparative analysis with traditional methods
    • Rodrigues A and Bowers J (1996) System dynamics in project management: a comparative analysis with traditional methods. System Dynamics Review 12(2), 121-139.
    • (1996) System Dynamics Review , vol.12 , Issue.2 , pp. 121-139
    • Rodrigues, A.1    Bowers, J.2
  • 40
    • 85037774230 scopus 로고    scopus 로고
    • System Dynamics in Project Management: Assessing the Impacts of Client Behaviour on Project Performance
    • 22-26 July, Boston, USA
    • Rodrigues A and Williams T (1996) System Dynamics in Project Management: Assessing the Impacts of Client Behaviour on Project Performance. In Proceedings of the 1996 International System Dynamics Conference. 22-26 July, Boston, USA, pp 435-442.
    • (1996) Proceedings of the 1996 International System Dynamics Conference , pp. 435-442
    • Rodrigues, A.1    Williams, T.2
  • 41
    • 24044508545 scopus 로고
    • Software Development Process Models
    • Rook P, Imprint London; New York: Elsevier Applied Science
    • Rook P (1990) Software Development Process Models. In Software Reliability Handbook. (Rook P, Ed), pp 413-440, Imprint London; New York: Elsevier Applied Science.
    • (1990) Software Reliability Handbook , pp. 413-440
    • Rook, P.1
  • 42
    • 0040408360 scopus 로고
    • Software Project Control and Management
    • Rook P, Imprint London; New York: Elsevier Applied Science
    • Rook P and Wingrove A (1990) Software Project Control and Management. In Software Reliability Handbook. (Rook P, Ed), pp 155-209, Imprint London; New York: Elsevier Applied Science.
    • (1990) Software Reliability Handbook , pp. 155-209
    • Rook, P.1    Wingrove, A.2
  • 44
    • 0002039123 scopus 로고
    • Appropriate summary of statistics for evaluating the historical fit of system dynamics models
    • Sterman JD (1984) Appropriate summary of statistics for evaluating the historical fit of system dynamics models. Dynamica 10(2), 5166.
    • (1984) Dynamica , vol.10 , Issue.2 , pp. 5166
    • Sterman, J.D.1
  • 45
    • 24044486197 scopus 로고
    • Structural considerations for a software life-cycle dynamic simulation model
    • Conference, October
    • Tausworthe R, McKenzie M and Lin C (1983) Structural considerations for a software life-cycle dynamic simulation model. Presented at AIAA Computers in Aerospace IV Conference, October 1983.
    • (1983) Presented at AIAA Computers in Aerospace , vol.4 , pp. 1983
    • Tausworthe, R.1    McKenzie, M.2    Lin, C.3
  • 50
    • 84984734418 scopus 로고    scopus 로고
    • To be published in the Proc of the NATO Advanced Research Workshop 951491, 13-15 November, Kluwer Publishers, Kiev, Ukraine. Netherlands
    • Williams T (1996) The Need for New Paradigms for Complex Projects. (To be published in the Proc of the NATO Advanced Research Workshop 951491, 13-15 November, Kluwer Publishers, Kiev, Ukraine. Netherlands).
    • (1996) The Need for New Paradigms for Complex Projects
    • Williams, T.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.