-
1
-
-
0042182628
-
Scheduling a production line to minimize maximum tardiness
-
Management Science Research Project, University of California at Los Angeles
-
J.R. Jackson, "Scheduling a production line to minimize maximum tardiness", Research Report 43, Management Science Research Project, University of California at Los Angeles, 1955.
-
(1955)
Research Report
, vol.43
-
-
Jackson, J.R.1
-
2
-
-
6244236878
-
A liner time algorithm for restricted bin packing and scheduling problems
-
J. Blazewicz, K. Eckeer, "A liner time algorithm for restricted bin packing and scheduling problems", Operations Research Letters, Vol.2, pp.80-83, 1983.
-
(1983)
Operations Research Letters
, vol.2
, pp. 80-83
-
-
Blazewicz, J.1
Eckeer, K.2
-
3
-
-
43949161199
-
A branch & bound algorithm for the job-shop scheduling problem
-
P. Brucker, B. Jurisch, B. Sievers, "A branch & bound algorithm for the job-shop scheduling problem", Discrete Applied Mathematics, Vol.49, No.1-3, pp.107-127, 1994.
-
(1994)
Discrete Applied Mathematics
, vol.49
, Issue.1-3
, pp. 107-127
-
-
Brucker, P.1
Jurisch, B.2
Sievers, B.3
-
4
-
-
0031115735
-
A review of the applicability of or and AI scheduling techniques in practice
-
VCS Wiers, "A review of the applicability of OR and AI scheduling techniques in practice", Omega-The International Journal of Management Science, Vol.25, pp.145-153, 1997.
-
(1997)
Omega-the International Journal of Management Science
, vol.25
, pp. 145-153
-
-
-
5
-
-
0002066821
-
Various optimizers for single stage production
-
W.E. Smith, "Various optimizers for single stage production", Naval Research Logistics Quarterly, Vol.3, pp.59-66, 1956.
-
(1956)
Naval Research Logistics Quarterly
, vol.3
, pp. 59-66
-
-
Smith, W.E.1
-
6
-
-
0003054955
-
A survey of scheduling rules
-
S. Panwalkar, W. Iskander, "A survey of scheduling rules", Operations Research, Vol.25, No.1, pp.45-64, 1977.
-
(1977)
Operations Research
, vol.25
, Issue.1
, pp. 45-64
-
-
Panwalkar, S.1
Iskander, W.2
-
7
-
-
0024122608
-
Stochastic neural networks for solving job-shop scheduling: Part I. Problem representation
-
Sandiego
-
Y.P.S. Foo, Y. Takefuji, "Stochastic neural networks for solving job-shop scheduling: Part I. Problem representation", In Proceeding of the IEEE International Conference on Neural Networks, Sandiego, Vol.II, pp.275-282, 1988.
-
(1988)
Proceeding of the IEEE International Conference on Neural Networks
, vol.2
, pp. 275-282
-
-
Foo, Y.P.S.1
Takefuji, Y.2
-
8
-
-
0024125703
-
Stochastic neural networks for solving job-shop scheduling: Part II. Architecture and simulations
-
Sandiego
-
Y.P.S. Foo, Y. Takefuji, "Stochastic neural networks for solving job-shop scheduling: Part II. Architecture and simulations", In Proceeding of the IEEE International Conference on Neural Networks, Sandiego, Vol.II, pp.283-290, 1988.
-
(1988)
Proceeding of the IEEE International Conference on Neural Networks
, vol.2
, pp. 283-290
-
-
Foo, Y.P.S.1
Takefuji, Y.2
-
9
-
-
0000411214
-
Tabu search-part I
-
F. Glover, "Tabu search-Part I", ORSA Journal on Computing, Vol.1, No.3, pp.190-206, 1989.
-
(1989)
ORSA Journal on Computing
, vol.1
, Issue.3
, pp. 190-206
-
-
Glover, F.1
-
10
-
-
0001724713
-
Tabu search-part II
-
F. Glover, "Tabu search-Part II", ORSA Journal on Computing, Vol.2, No.1, pp.4-32, 1990.
-
(1990)
ORSA Journal on Computing
, vol.2
, Issue.1
, pp. 4-32
-
-
Glover, F.1
-
11
-
-
0032045960
-
Tabu search for resource-constrained scheduling
-
M.G.A. Verhoeven, "Tabu search for resource-constrained scheduling", European Journal of Operational Research, Vol.106, No.2-3, pp.266-276, 1998.
-
(1998)
European Journal of Operational Research
, vol.106
, Issue.2-3
, pp. 266-276
-
-
Verhoeven, M.G.A.1
-
12
-
-
0042261149
-
An improved tabu search approach for solving the job shop scheduling problem with tooling constraints
-
A. Hertz, M. Widmer, "An improved tabu search approach for solving the job shop scheduling problem with tooling constraints", Discrete Applied Mathematics, Vol.65, No.1-3, pp.319-345, 1996.
-
(1996)
Discrete Applied Mathematics
, vol.65
, Issue.1-3
, pp. 319-345
-
-
Hertz, A.1
Widmer, M.2
-
13
-
-
34250074609
-
Applying tabu search to the job-shop scheduling problem
-
M. Dell'Amico, M. Trubian, "Applying tabu search to the job-shop scheduling problem", Annals of Operations Research, Vol.41, No.1-4, pp.231-252, 1993.
-
(1993)
Annals of Operations Research
, vol.41
, Issue.1-4
, pp. 231-252
-
-
Dell'Amico, M.1
Trubian, M.2
-
14
-
-
0033894498
-
A tabu search method guided by shifting bottleneck for the job shop scheduling problem
-
F. Pezzella, E. Merelli, "A tabu search method guided by shifting bottleneck for the job shop scheduling problem", European Journal of Operational Research, Vol.120, No.2, pp.297-310, 2000.
-
(2000)
European Journal of Operational Research
, vol.120
, Issue.2
, pp. 297-310
-
-
Pezzella, F.1
Merelli, E.2
-
15
-
-
5244278595
-
A fast taboo search algorithm for the job shop problem
-
E. Nowicki, C. Smutnicki, "A fast taboo search algorithm for the job shop problem", Management Science, Vol.42, No.6, pp.797-813, 1996.
-
(1996)
Management Science
, vol.42
, Issue.6
, pp. 797-813
-
-
Nowicki, E.1
Smutnicki, C.2
-
16
-
-
0032050653
-
The flow shop with parallel machines: A tabu search approach
-
E. Nowicki, C. Smutnicki, "The flow shop with parallel machines: a tabu search approach", European Journal of Operational Research, Vol.106, No.2-3, pp.226-253, 1998.
-
(1998)
European Journal of Operational Research
, vol.106
, Issue.2-3
, pp. 226-253
-
-
Nowicki, E.1
Smutnicki, C.2
-
17
-
-
0035351789
-
Tabu search algorithm with varying neighborhood and its application to job shop scheduling problem
-
Y.K. Sun, M. Liu, C. Wu, "Tabu search algorithm with varying neighborhood and its application to job shop scheduling problem", Acta Electronica Sinica (in Chinese), Vol.29, No.5, pp.622-625, 2001.
-
(2001)
Acta Electronica Sinica (in Chinese)
, vol.29
, Issue.5
, pp. 622-625
-
-
Sun, Y.K.1
Liu, M.2
Wu, C.3
-
18
-
-
0003994089
-
Resource constrained project scheduling: An experimental investigation of heuristic scheduling techniques
-
Graduate School of Industrial Administration, Carnegie-Mellon University
-
S. Lawrence, "Resource constrained project scheduling: an experimental investigation of heuristic scheduling techniques", Technical report, Graduate School of Industrial Administration, Carnegie-Mellon University, 1984.
-
(1984)
Technical Report
-
-
Lawrence, S.1
-
19
-
-
0036921288
-
An objective decomposing method based on IBMDC for solving complex production scheduling problem
-
M. Liu, M.Y. Dong, C. Wu, "An objective decomposing method based on IBMDC for solving complex production scheduling problem", Proceedings of 2002 International Conference on Machine Learning and Cybernetics, Vol.3, pp.1676-1679, 2002.
-
(2002)
Proceedings of 2002 International Conference on Machine Learning and Cybernetics
, vol.3
, pp. 1676-1679
-
-
Liu, M.1
Dong, M.Y.2
Wu, C.3
|