메뉴 건너뛰기




Volumn 33, Issue 1, 2006, Pages 64-92

A directional decomposition heuristic for one-dimensional, non-equidistant machine-cell location problems

Author keywords

Directional decomposition; Flowline; Heuristic; Machine cell location

Indexed keywords

ALGORITHMS; COMPUTATIONAL COMPLEXITY; COSTS; DECOMPOSITION; INDUSTRIAL MANAGEMENT; INDUSTRIAL RESEARCH; PROBLEM SOLVING; TECHNOLOGY;

EID: 21444454136     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cor.2004.06.003     Document Type: Article
Times cited : (6)

References (25)
  • 2
    • 0001458417 scopus 로고
    • Branching algorithms for solving the group technology problem
    • A. Kusiak Branching algorithms for solving the group technology problem Journal of Manufacturing Systems 10 4 1992 332 343
    • (1992) Journal of Manufacturing Systems , vol.10 , Issue.4 , pp. 332-343
    • Kusiak, A.1
  • 3
    • 0026839478 scopus 로고
    • A model for duplicating bottleneck machines in the presence of budgetary limitations in cellular manufacturing
    • R. Logendran A model for duplicating bottleneck machines in the presence of budgetary limitations in cellular manufacturing International Journal of Production Research 30 3 1992 683 694
    • (1992) International Journal of Production Research , vol.30 , Issue.3 , pp. 683-694
    • Logendran, R.1
  • 4
    • 0024889373 scopus 로고
    • Duplication process in machine cell formation in group technology
    • H. Seifoddini Duplication process in machine cell formation in group technology IIE Transactions 21 4 1989 382 388
    • (1989) IIE Transactions , vol.21 , Issue.4 , pp. 382-388
    • Seifoddini, H.1
  • 5
    • 0001595303 scopus 로고
    • A sequence-based materials flow procedure for designing manufacturing cells
    • P. Verma, and F.Y. Ding A sequence-based materials flow procedure for designing manufacturing cells International Journal of Production Research 33 12 1995 3267 3281
    • (1995) International Journal of Production Research , vol.33 , Issue.12 , pp. 3267-3281
    • Verma, P.1    Ding, F.Y.2
  • 6
    • 0031146035 scopus 로고    scopus 로고
    • Formation of machine cells and part families: A modified p-media model and a comparative study
    • J. Wang, and C. Roze Formation of machine cells and part families a modified p-media model and a comparative study International Journal of Production Research 35 5 1997 1259 1286
    • (1997) International Journal of Production Research , vol.35 , Issue.5 , pp. 1259-1286
    • Wang, J.1    Roze, C.2
  • 7
    • 0002037592 scopus 로고
    • Quadratic assignment problem algorithms and the location of indivisible facilities
    • F.S. Hillier, and M.M. Connors Quadratic assignment problem algorithms and the location of indivisible facilities Management Science 13 1 1966 42 57
    • (1966) Management Science , vol.13 , Issue.1 , pp. 42-57
    • Hillier, F.S.1    Connors, M.M.2
  • 8
    • 0000965291 scopus 로고
    • An experimental comparison of techniques for the assignment of facilities to locations
    • C.E. Nugent, T.E. Vollmann, and J. Ruml An experimental comparison of techniques for the assignment of facilities to locations Operations Research 16 1 1968 150 173
    • (1968) Operations Research , vol.16 , Issue.1 , pp. 150-173
    • Nugent, C.E.1    Vollmann, T.E.2    Ruml, J.3
  • 9
    • 0015755269 scopus 로고
    • An N-Step, 2-variable search algorithm for the component placement problem
    • C.H. Heider An N-Step, 2-variable search algorithm for the component placement problem Naval Research Logistics Quarterly 20 4 1973 699 724
    • (1973) Naval Research Logistics Quarterly , vol.20 , Issue.4 , pp. 699-724
    • Heider, C.H.1
  • 10
    • 0017948796 scopus 로고
    • Numerical investigations on quadratic assignment problems
    • R.E. Burkard, and K.H. Stratmann Numerical investigations on quadratic assignment problems Naval Research Logistics Quarterly 25 1 1978 129 148
    • (1978) Naval Research Logistics Quarterly , vol.25 , Issue.1 , pp. 129-148
    • Burkard, R.E.1    Stratmann, K.H.2
  • 11
    • 0020764126 scopus 로고
    • A branch-and-bound-based heuristic for solving quadratic assignment problem
    • M.S. Bazaraa, and O. Kirca A branch-and-bound-based heuristic for solving quadratic assignment problem Naval Research Logistic Quarterly 30 2 1983 287 304
    • (1983) Naval Research Logistic Quarterly , vol.30 , Issue.2 , pp. 287-304
    • Bazaraa, M.S.1    Kirca, O.2
  • 14
    • 0025478226 scopus 로고
    • A heuristic for assigning facilities to locations to minimize WIP travel distance in a linear facility
    • A. Houshyar, and L.F. McGinnis A heuristic for assigning facilities to locations to minimize WIP travel distance in a linear facility International Journal Production Research 28 8 1990 1485 1498
    • (1990) International Journal Production Research , vol.28 , Issue.8 , pp. 1485-1498
    • Houshyar, A.1    McGinnis, L.F.2
  • 15
    • 0029254518 scopus 로고
    • Optimal algorithm for row layout problems in automated manufacturing systems
    • P. Kouvelis, W.-C. Chiang, and G. Yu Optimal algorithm for row layout problems in automated manufacturing systems IIE Transactions 27 1 1995 99 104
    • (1995) IIE Transactions , vol.27 , Issue.1 , pp. 99-104
    • Kouvelis, P.1    Chiang, W.-C.2    Yu, G.3
  • 16
    • 0032026466 scopus 로고    scopus 로고
    • One-dimensional machine location problems in a multi-product flowline with equidistant locations
    • B.R. Sarker, W.E. Wilhelm, and G.L. Hogg One-dimensional machine location problems in a multi-product flowline with equidistant locations European Journal of Operational Research 105 3 1998 401 426
    • (1998) European Journal of Operational Research , vol.105 , Issue.3 , pp. 401-426
    • Sarker, B.R.1    Wilhelm, W.E.2    Hogg, G.L.3
  • 18
    • 0001261955 scopus 로고
    • A two-phase procedure for duplicating bottleneck machines in a linear layout, cellular manufacturing system
    • B.R. Sarker, and J. Yu A two-phase procedure for duplicating bottleneck machines in a linear layout, cellular manufacturing system International Journal of Production Research 32 9 1994 2049 2066
    • (1994) International Journal of Production Research , vol.32 , Issue.9 , pp. 2049-2066
    • Sarker, B.R.1    Yu, J.2
  • 20
    • 0009454747 scopus 로고    scopus 로고
    • PhD dissertation, Department of Industrial and Manufacturing Systems Engineering, Louisiana State University, Baton Rouge, LA
    • Yu J. Machine-cell location problems in multi-product flowlines. PhD dissertation, Department of Industrial and Manufacturing Systems Engineering, Louisiana State University, Baton Rouge, LA, 1999, p. 70803-6409.
    • (1999) Machine-cell Location Problems in Multi-product Flowlines , pp. 70803-76409
    • Yu, J.1
  • 22
    • 0037883613 scopus 로고    scopus 로고
    • Directional decomposition heuristic for a linear machine-cell location problem
    • J. Yu, and B.R. Sarker Directional decomposition heuristic for a linear machine-cell location problem European Journal of Operational Research 149 1 2003 142 184
    • (2003) European Journal of Operational Research , vol.149 , Issue.1 , pp. 142-184
    • Yu, J.1    Sarker, B.R.2
  • 23
    • 0004042357 scopus 로고
    • PhD dissertation, Department of Industrial Engineering, Texas A&M University, College Station, TX 77843-3131
    • Sarker BR. The amoebic matrix and one-dimensional machine location problems. PhD dissertation, Department of Industrial Engineering, Texas A&M University, College Station, TX 77843-3131, 1989.
    • (1989) The Amoebic Matrix and One-dimensional Machine Location Problems
    • Sarker, B.R.1
  • 24
    • 0031117438 scopus 로고    scopus 로고
    • Reducing work-in-process movements of multiple products in one-dimensional layout problems
    • V.S. Nori, and B.R. Sarker Reducing work-in-process movements of multiple products in one-dimensional layout problems Journal of the Operational Research Society 48 4 1997 412 422
    • (1997) Journal of the Operational Research Society , vol.48 , Issue.4 , pp. 412-422
    • Nori, V.S.1    Sarker, B.R.2
  • 25
    • 0037138028 scopus 로고    scopus 로고
    • Locating cells with bottleneck machines in cellular manufacturing systems
    • S. Wang, and B.R. Sarker Locating cells with bottleneck machines in cellular manufacturing systems International Journal of Production Research 40 2 2002 403 424
    • (2002) International Journal of Production Research , vol.40 , Issue.2 , pp. 403-424
    • Wang, S.1    Sarker, B.R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.