메뉴 건너뛰기




Volumn , Issue , 1996, Pages 941-955

Rock engineering aspects of the underground works for the Guangzhou Pumped Storage project, China

Author keywords

[No Author keywords available]

Indexed keywords

DESIGN AND CONSTRUCTION; GUANGDONG PROVINCE; GUANGZHOU; PUMPED STORAGE; PUMPED STORAGE POWER STATION; ROCK ENGINEERING; STAGE I;

EID: 2142728828     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (1)

References (1)
  • 1
    • 0028368623 scopus 로고
    • Hydropower development in China
    • Cheng Xuemin Hydropower development in China Proc. Instn Civ. Engrs Civ. Engng, 102, No. 1, 22-33, 1994
    • (1994) Proc. Instn Civ. Engrs Civ. Engng , vol.102 , Issue.1 , pp. 22-33
    • Xuemin, C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.