-
1
-
-
0035324608
-
Plant monitoring and fault detection synergy between data reconciliation and principal component analysis
-
Amand, Th., Heyen, G., and Kalitventzeff, B. 2001. Plant monitoring and fault detection synergy between data reconciliation and principal component analysis. Computers and Chemical Engineering 25: 501-507.
-
(2001)
Computers and Chemical Engineering
, vol.25
, pp. 501-507
-
-
Amand, Th.1
Heyen, G.2
Kalitventzeff, B.3
-
2
-
-
0001452888
-
Iterative techniques for blind source separation using only fourth-order cumulants
-
Brussels, Belgium
-
Cardoso, J.-F. 1992. Iterative techniques for blind source separation using only fourth-order cumulants. In Proceedings of EUSIPCO. Brussels, Belgium, pp. 739-742.
-
(1992)
Proceedings of EUSIPCO
, pp. 739-742
-
-
Cardoso, J.-F.1
-
4
-
-
0028416938
-
Independent component analysis - A new concept?
-
Comon, P. 1994. Independent component analysis - a new concept? Signal Processing 36: 287-314.
-
(1994)
Signal Processing
, vol.36
, pp. 287-314
-
-
Comon, P.1
-
5
-
-
0026188054
-
Blind separation of sources, part 2: Problems statement
-
Comon, P., Jutten, C., and Herault, J. 1991. Blind separation of sources, part 2: problems statement. Signal Processing 24(1): 11-20.
-
(1991)
Signal Processing
, vol.24
, Issue.1
, pp. 11-20
-
-
Comon, P.1
Jutten, C.2
Herault, J.3
-
7
-
-
0010660081
-
-
EPRI TR-104965
-
Davis, E., Funk, D., Hooten, D., and Rusaw, R. 1998. On-line monitoring of instrument channel performance. EPRI TR-104965.
-
(1998)
On-line Monitoring of Instrument Channel Performance
-
-
Davis, E.1
Funk, D.2
Hooten, D.3
Rusaw, R.4
-
8
-
-
0035852402
-
A strategy for detection and isolation of sensor failures and process upsets
-
Doymaz, F., Romagtnoli, J. A., and Palazoglu, A. 2001a. A strategy for detection and isolation of sensor failures and process upsets. Chemometrics and Intelligent Laboratory Systems 55: 109-123.
-
(2001)
Chemometrics and Intelligent Laboratory Systems
, vol.55
, pp. 109-123
-
-
Doymaz, F.1
Romagtnoli, J.A.2
Palazoglu, A.3
-
9
-
-
0035427804
-
A robust strategy for real-time process monitoring
-
Doymaz, F., Chen, J., Romagtnoli, J. A., and Palazoglu, A. 2001b. A robust strategy for real-time process monitoring. Journal of Process Control 11: 343-359.
-
(2001)
Journal of Process Control
, vol.11
, pp. 343-359
-
-
Doymaz, F.1
Chen, J.2
Romagtnoli, J.A.3
Palazoglu, A.4
-
10
-
-
0031644999
-
A unified geometric approach to process and sensor fault identification and reconstruction: The unidimensional fault case
-
Dunia, R., and Qin, S. J. 1998. A unified geometric approach to process and sensor fault identification and reconstruction: the unidimensional fault case. Computers and Chemical Engineering 22(7-8): 927-943.
-
(1998)
Computers and Chemical Engineering
, vol.22
, Issue.7-8
, pp. 927-943
-
-
Dunia, R.1
Qin, S.J.2
-
11
-
-
0030269512
-
Identification of faulty sensors using principal component analysis
-
Dunia, R., Qin, S. J., Edgar, T. F., and McAvoy, T. J. 1996. Identification of faulty sensors using principal component analysis. AIChE Journal 42(10): 2797-2811.
-
(1996)
AIChE Journal
, vol.42
, Issue.10
, pp. 2797-2811
-
-
Dunia, R.1
Qin, S.J.2
Edgar, T.F.3
McAvoy, T.J.4
-
12
-
-
0033114190
-
Experimental comparison of neural algorithms for independent component analysis and blind separation
-
Giannakopoulos, X., Karhunen, J., and Oja, E. 1999. Experimental comparison of neural algorithms for independent component analysis and blind separation. International Journal of Neural Systems 9(2): 651-656.
-
(1999)
International Journal of Neural Systems
, vol.9
, Issue.2
, pp. 651-656
-
-
Giannakopoulos, X.1
Karhunen, J.2
Oja, E.3
-
13
-
-
0026103647
-
Sequential probability ratio test for nuclear plant component surveillance
-
Gross, K. S., and Humenik, K. E. 1991. Sequential probability ratio test for nuclear plant component surveillance. Nuclear Technology 93: 131-137.
-
(1991)
Nuclear Technology
, vol.93
, pp. 131-137
-
-
Gross, K.S.1
Humenik, K.E.2
-
14
-
-
0003684449
-
-
New York: Springer-Verlag
-
Hastie, T., Tibshirani, R., and Friedman, J. 2002. The Elements of Statistical Learning, Data Mining, Inference and Prediction. New York: Springer-Verlag.
-
(2002)
The Elements of Statistical Learning, Data Mining, Inference and Prediction
-
-
Hastie, T.1
Tibshirani, R.2
Friedman, J.3
-
15
-
-
58149421595
-
Analysis of a complex of statistical variables into principal components
-
Hotelling, H. 1933. Analysis of a complex of statistical variables into principal components. Journal of Educational Psychology 24: 417-441, 498-520.
-
(1933)
Journal of Educational Psychology
, vol.24
, pp. 417-441
-
-
Hotelling, H.1
-
16
-
-
0032629347
-
Fast and robust fixed-point algorithms for independent component analysis
-
Hyvarinen, A. 1999. Fast and robust fixed-point algorithms for independent component analysis. IEEE Transactions on Neural Networks 10(3).
-
(1999)
IEEE Transactions on Neural Networks
, vol.10
, Issue.3
-
-
Hyvarinen, A.1
-
17
-
-
1642468351
-
-
Hyvarinen, A., Karhunen, J., and Oja, E. 2001. Independent Component Analysis 1-11, 125-137.
-
(2001)
Independent Component Analysis
, vol.1
, Issue.11
, pp. 125-137
-
-
Hyvarinen, A.1
Karhunen, J.2
Oja, E.3
-
19
-
-
0026191274
-
Blind separation of sources, part 1: An adaptive algorithm based on neuromimetic architecture
-
Jutten, C., and Herault, J. 1991. Blind separation of sources, part 1: an adaptive algorithm based on neuromimetic architecture. Signal Processing 24(1): 1-10.
-
(1991)
Signal Processing
, vol.24
, Issue.1
, pp. 1-10
-
-
Jutten, C.1
Herault, J.2
-
20
-
-
0034661131
-
Comparison of statistical process monitoring methods: Application to the Eastman challenge problem
-
Kano, M., Nagao, K., Hasebe, S., Hashimoto, I., Ohno, H., Strauss, R., and Bakshi, B. 2000. Comparison of statistical process monitoring methods: application to the Eastman challenge problem. Computers and Chemical Engineering 24: 175-181.
-
(2000)
Computers and Chemical Engineering
, vol.24
, pp. 175-181
-
-
Kano, M.1
Nagao, K.2
Hasebe, S.3
Hashimoto, I.4
Ohno, H.5
Strauss, R.6
Bakshi, B.7
-
21
-
-
0035882158
-
A new multivariate statistical process monitoring method using principal component analysis
-
Kano, M., Hasebe, S., Hashimoto, I., and Ohno, H. 2001. A new multivariate statistical process monitoring method using principal component analysis. Computers and Chemical Engineering 25: 1103-1113.
-
(2001)
Computers and Chemical Engineering
, vol.25
, pp. 1103-1113
-
-
Kano, M.1
Hasebe, S.2
Hashimoto, I.3
Ohno, H.4
-
22
-
-
0025078552
-
Calibration modeling by partial least-squares and principal component regression and its optimization using an improved leverage correction for prediction testing
-
Marbach, R., and Heise, H. M. 1990. Calibration modeling by partial least-squares and principal component regression and its optimization using an improved leverage correction for prediction testing. Chemometrics and Intelligent Laboratory Systems 9: 45-63.
-
(1990)
Chemometrics and Intelligent Laboratory Systems
, vol.9
, pp. 45-63
-
-
Marbach, R.1
Heise, H.M.2
-
26
-
-
0000325341
-
On lines and planes of closest fit to systems of points in space
-
Pearson, K. 1901. On lines and planes of closest fit to systems of points in space. Philosophical Magazine 2(6): 559-572.
-
(1901)
Philosophical Magazine
, vol.2
, Issue.6
, pp. 559-572
-
-
Pearson, K.1
-
27
-
-
0346483249
-
Calibration and estimation of redundant signals
-
Ray, A., and Phoha, S. 2000. Calibration and estimation of redundant signals. Automatica 36: 1525-1534.
-
(2000)
Automatica
, vol.36
, pp. 1525-1534
-
-
Ray, A.1
Phoha, S.2
-
28
-
-
0036956134
-
Frontiers of research in BSS/ICA
-
Sanchez, A., and David, V. 2002. Frontiers of research in BSS/ICA. Neurocomputing 49: 7-23.
-
(2002)
Neurocomputing
, vol.49
, pp. 7-23
-
-
Sanchez, A.1
David, V.2
-
29
-
-
0035970928
-
Redundant chemical sensors for calibration-impossible applications
-
Seiter, J. C., and DeGrandpre, M. D. 2001. Redundant chemical sensors for calibration-impossible applications. Talanta 54: 99-106.
-
(2001)
Talanta
, vol.54
, pp. 99-106
-
-
Seiter, J.C.1
DeGrandpre, M.D.2
-
32
-
-
0242369385
-
Development and benchmarking of multivariate statistical process control tools for a semiconductor etch process: Impact of measurement selection and data treatment on sensitivity
-
Kingston Upon Hull, U.K., August
-
Wise, B. M., Gallagher, N. B., Butler, S. W., White, D., and Barna, G. G. 1997. Development and benchmarking of multivariate statistical process control tools for a semiconductor etch process: impact of measurement selection and data treatment on sensitivity. In IFAC SAFEPROCESS'97. Kingston Upon Hull, U.K., August, pp. 35-42.
-
(1997)
IFAC SAFEPROCESS'97
, pp. 35-42
-
-
Wise, B.M.1
Gallagher, N.B.2
Butler, S.W.3
White, D.4
Barna, G.G.5
|