메뉴 건너뛰기




Volumn 43, Issue 2, 2004, Pages 305-318

An approach to process production reactive scheduling

Author keywords

Batch production; Production scheduling; Scheduling algorithm

Indexed keywords

ALGORITHMS; CONSTRAINT THEORY; COSTS; DECISION MAKING; ENVIRONMENTAL IMPACT; INDUSTRIAL MANAGEMENT; RELIABILITY; SCHEDULING; SOCIAL ASPECTS;

EID: 2142643718     PISSN: 00190578     EISSN: None     Source Type: Journal    
DOI: 10.1016/s0019-0578(07)60039-1     Document Type: Article
Times cited : (4)

References (16)
  • 2
    • 0013231180 scopus 로고    scopus 로고
    • The Relationship between Planning and Production Activities in Process Industries
    • Haifa, Israel
    • Jovan, V., The Relationship between Planning and Production Activities in Process Industries. Proceedings of the 7th Mediterranean Conference on Control and Automation, Haifa, Israel, 1999, pp. 1982-1989.
    • (1999) Proceedings of the 7th Mediterranean Conference on Control and Automation , pp. 1982-1989
    • Jovan, V.1
  • 7
    • 0013230554 scopus 로고
    • Approaches to the Complexity and Uncertainty of Scheduling in Process Industries: Process Regulation in Highly Automated Systems
    • Berlin, Germany
    • Scherer, E., Approaches to the Complexity and Uncertainty of Scheduling in Process Industries: Process Regulation in Highly Automated Systems. Proceedings of IFAC Symposium on Automated Systems Based on Human Skills, Berlin, Germany, 1995, pp. 91-95.
    • (1995) Proceedings of IFAC Symposium on Automated Systems Based on Human Skills , pp. 91-95
    • Scherer, E.1
  • 11
    • 0034661146 scopus 로고    scopus 로고
    • The curse of reality - Why process scheduling optimization problems are difficult in practice
    • Honkomp, S. J., Lombardo, S., Rosen, O., and Penkny, J. F., The curse of reality - why process scheduling optimization problems are difficult in practice. Comput. Chem. Eng. 24, 323-328 (2000).
    • (2000) Comput. Chem. Eng. , vol.24 , pp. 323-328
    • Honkomp, S.J.1    Lombardo, S.2    Rosen, O.3    Penkny, J.F.4
  • 12
    • 0032093841 scopus 로고    scopus 로고
    • Application of production planning and scheduling in the process industries
    • Loos, P. and Allweyer, T., Application of production planning and scheduling in the process industries. Comput. Ind. 36, 199-208 (1998).
    • (1998) Comput. Ind. , vol.36 , pp. 199-208
    • Loos, P.1    Allweyer, T.2
  • 14
    • 0034300834 scopus 로고    scopus 로고
    • Scheduling multipurpose batch process industries with no-wait restrictions by simulated annealing
    • Raaymakers, W. H. M. and Hoogeveen, J. A., Scheduling multipurpose batch process industries with no-wait restrictions by simulated annealing. Eur. J. Oper. Res. 126, 131-151 (2000).
    • (2000) Eur. J. Oper. Res. , vol.126 , pp. 131-151
    • Raaymakers, W.H.M.1    Hoogeveen, J.A.2
  • 15
    • 0037121475 scopus 로고    scopus 로고
    • Job-shop scheduling with blocking and no-wait constraints
    • Mascis, A. and Pacciarelli, D., Job-shop scheduling with blocking and no-wait constraints. Eur. J. Oper. Res. 143, 498-517 (2000).
    • (2000) Eur. J. Oper. Res. , vol.143 , pp. 498-517
    • Mascis, A.1    Pacciarelli, D.2
  • 16
    • 84890803993 scopus 로고    scopus 로고
    • Feasibility study on the two-stage gel washing subprocess scheduling/control in Cinkarna Celje d.d. Chemicalworks
    • Workpackage No. 9's Deliverable No: D25 of the 5th RTD Framework Programme under Contract G1RD-CT-2000-00318
    • Jovan, V. and Hauptman, B., Feasibility study on the two-stage gel washing subprocess scheduling/control in Cinkarna Celje d.d. Chemicalworks. Workpackage No. 9's Deliverable No: D25 of the 5th RTD Framework Programme under Contract G1RD-CT-2000-00318, "VIP-NET - Virtual Plant-Wide Management and Optimisation of Responsive Manufacturing Networks," 2002.
    • (2002) VIP-NET - Virtual Plant-wide Management and Optimisation of Responsive Manufacturing Networks
    • Jovan, V.1    Hauptman, B.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.