메뉴 건너뛰기




Volumn 16, Issue 3, 2005, Pages 259-275

An autonomous decentralized supply chain planning system for multi-stage production processes

Author keywords

Autonomous decentralized system; Distributed scheduling; Flowshop problem; Planning and scheduling; Simulated annealing; Supply chain

Indexed keywords

COMPUTATIONAL METHODS; OPTIMIZATION; PROCESS ENGINEERING; PRODUCTION; SCHEDULING; SIMULATED ANNEALING; STRATEGIC PLANNING;

EID: 21144445739     PISSN: 09565515     EISSN: None     Source Type: Journal    
DOI: 10.1007/s10845-005-7022-7     Document Type: Article
Times cited : (30)

References (27)
  • 3
    • 84952521179 scopus 로고
    • On the design of hierarchical production planning systems
    • Bitran, R. and Hax, A. (1977) On the design of hierarchical production planning systems. Decision Sciences, 8, 29-55.
    • (1977) Decision Sciences , vol.8 , pp. 29-55
    • Bitran, R.1    Hax, A.2
  • 6
    • 0033617056 scopus 로고    scopus 로고
    • Agent-based design of holonic manufacturing systems
    • Fischer, K. (1999) Agent-based design of holonic manufacturing systems. Robotics and Autonomous Systems, 27, 3-13.
    • (1999) Robotics and Autonomous Systems , vol.27 , pp. 3-13
    • Fischer, K.1
  • 7
    • 0032202838 scopus 로고    scopus 로고
    • Holonic manufacturing scheduling: Architecture, cooperation mechanism, and implementation
    • Gou, L., Luh, P.B., Kyoya, Y. (1998) Holonic manufacturing scheduling: architecture, cooperation mechanism, and implementation. Computers in Industry, 37, 213-231.
    • (1998) Computers in Industry , vol.37 , pp. 213-231
    • Gou, L.1    Luh, P.B.2    Kyoya, Y.3
  • 8
    • 0032960899 scopus 로고    scopus 로고
    • Hierarchical lagrangean relaxation procedure for solving mid term planning problems
    • Gupta, A. and Maranas, C.D. (1999) Hierarchical Lagrangean relaxation procedure for solving mid term planning problems. Industrial and Engineering Chemistry Research, 38, 1937-1947.
    • (1999) Industrial and Engineering Chemistry Research , vol.38 , pp. 1937-1947
    • Gupta, A.1    Maranas, C.D.2
  • 9
    • 0342501654 scopus 로고
    • Autonomous decentralized scheduling system for single production line processes
    • Presented at Paper 235c, USA
    • Hasebe, S., Kitajima, T., Shiren, T. and Murakami, Y. (1994) Autonomous decentralized scheduling system for single production line processes, Presented at AIChE Annual Meeting, Paper 235c, USA.
    • (1994) AIChE Annual Meeting
    • Hasebe, S.1    Kitajima, T.2    Shiren, T.3    Murakami, Y.4
  • 12
    • 0031144297 scopus 로고    scopus 로고
    • Distributed decision-making using the contract net within a mediator architecture
    • Maturana, F.P. and Norrie, D.H. (1997) Distributed decision-making using the contract net within a mediator architecture. Decision Support Systems, 20, 53-64.
    • (1997) Decision Support Systems , vol.20 , pp. 53-64
    • Maturana, F.P.1    Norrie, D.H.2
  • 13
    • 0031188902 scopus 로고    scopus 로고
    • Planning and scheduling of parallel semicontinuous processes 1. Production planning
    • McDonald, C. and Karimi, I. (1997) Planning and scheduling of parallel semicontinuous processes 1. Production planning. Industrial and Engineering Chemistry Research, 36, 2691-2700.
    • (1997) Industrial and Engineering Chemistry Research , vol.36 , pp. 2691-2700
    • McDonald, C.1    Karimi, I.2
  • 14
    • 0035482403 scopus 로고    scopus 로고
    • A Web-based tool and a heuristic method for cooperation of manufacturing supply chain decisions
    • Mckay, A., Pennington, D. and Barnes, C. (2001) A Web-based tool and a heuristic method for cooperation of manufacturing supply chain decisions. Journal of Intelligent Manufacturing 12, 433-453.
    • (2001) Journal of Intelligent Manufacturing , vol.12 , pp. 433-453
    • Mckay, A.1    Pennington, D.2    Barnes, C.3
  • 18
    • 23044524605 scopus 로고    scopus 로고
    • Autonomous decentralized scheduling system for flowshop problems with storage cost and due-date penalties
    • in Japanese
    • Nishi, T., Sakata, A., Hasebe, S. and Hashimoto, I. (2000c) Autonomous decentralized scheduling system for flowshop problems with storage cost and due-date penalties. Kagaku Kogaku Ronbunshu, 26, 661-668 (in Japanese).
    • (2000) Kagaku Kogaku Ronbunshu , vol.26 , pp. 661-668
    • Nishi, T.1    Sakata, A.2    Hasebe, S.3    Hashimoto, I.4
  • 19
    • 0030102324 scopus 로고    scopus 로고
    • Solving production scheduling problems with a simple model of biological-oriented manufacturing systems
    • in Japanese
    • Ohkuma, K. and Ueda, K., (1996) Solving production scheduling problems with a simple model of biological-oriented manufacturing systems. Nihon Kikaigakkai Ronbunshu C, 62, 429-435 (in Japanese).
    • (1996) Nihon Kikaigakkai Ronbunshu C , vol.62 , pp. 429-435
    • Ohkuma, K.1    Ueda, K.2
  • 20
    • 0034316827 scopus 로고    scopus 로고
    • Fine planning for supply chains in semiconductor manufacture
    • Rupp, T.M. and Ristic, M. (2000) Fine planning for supply chains in semiconductor manufacture. Journal of Material Processing Technology, 107, 390-397.
    • (2000) Journal of Material Processing Technology , vol.107 , pp. 390-397
    • Rupp, T.M.1    Ristic, M.2
  • 21
    • 0023419094 scopus 로고
    • A distributed scheduling method for computer integrated manufacturing: The use of local area network in cellular systems
    • Shaw, M.J. (1987) A distributed scheduling method for computer integrated manufacturing: the use of local area network in cellular systems. International Journal of Production Research, 25(9), 1285-1303.
    • (1987) International Journal of Production Research , vol.25 , Issue.9 , pp. 1285-1303
    • Shaw, M.J.1
  • 23
    • 0019180974 scopus 로고
    • The contract net protocol: High-level communication control in a distributed problem solver
    • Smith, R.G. (1980) The contract net protocol: high-level communication control in a distributed problem solver. IEEE Transactions on Computers, 29(12), 1104-1113.
    • (1980) IEEE Transactions on Computers , vol.29 , Issue.12 , pp. 1104-1113
    • Smith, R.G.1
  • 25
    • 0031245009 scopus 로고    scopus 로고
    • Approaches and issues in scheduling a distributed shop-floor environment
    • Tharumarajah, A. and Bemelman, R. (1997) Approaches and issues in scheduling a distributed shop-floor environment. Computers in Industry, 34, 95-109.
    • (1997) Computers in Industry , vol.34 , pp. 95-109
    • Tharumarajah, A.1    Bemelman, R.2
  • 26
    • 0031119856 scopus 로고    scopus 로고
    • Strategic production-distribution models: A critical review with emphasis on global supply chain models
    • Vidal, C.J. and Goetschalckx, M. (1997) Strategic production-distribution models: A critical review with emphasis on global supply chain models. European Journal of Operational Research, 98, 1-18.
    • (1997) European Journal of Operational Research , vol.98 , pp. 1-18
    • Vidal, C.J.1    Goetschalckx, M.2
  • 27
    • 0033885605 scopus 로고    scopus 로고
    • Integration of process planning and scheduling - A review
    • Wei, T. (2000) Integration of process planning and scheduling - a review. Journal of Intelligent Manufacturing, 11, 51-63.
    • (2000) Journal of Intelligent Manufacturing , vol.11 , pp. 51-63
    • Wei, T.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.