|
Volumn 38, Issue 11, 2005, Pages 1828-1837
|
Calculations of high-power production target and beamdump for the GSI future Super-FRS for a fast extraction scheme at the FAIR Facility
a a a a,b a,c a a a a,d e a a |
Author keywords
[No Author keywords available]
|
Indexed keywords
ENERGY DISSIPATION;
HEAT CONDUCTION;
HEAVY IONS;
HIGH ENERGY PHYSICS;
IRRADIATION;
KINEMATICS;
RADIOISOTOPES;
SUBLIMATION;
BEAMDUMP;
FAST EXTRACTION SCHEMES;
ISOTOPE RESOLUTION;
SUPERCONDUCTING FRAGMENT SEPARATORS (SUPER-FRS);
SUPERCONDUCTING MATERIALS;
|
EID: 21044450335
PISSN: 00223727
EISSN: None
Source Type: Journal
DOI: 10.1088/0022-3727/38/11/023 Document Type: Conference Paper |
Times cited : (18)
|
References (22)
|