메뉴 건너뛰기




Volumn 23, Issue , 2005, Pages 330-342

Application of value management in project briefing

Author keywords

Construction industry; Customer requirements; Resource description framework

Indexed keywords


EID: 20444435516     PISSN: 02632772     EISSN: None     Source Type: Journal    
DOI: 10.1108/02632770510600281     Document Type: Article
Times cited : (52)

References (33)
  • 1
    • 84986013937 scopus 로고
    • Australian/New Zealand Standard: Value Management, Joint Technical Committee, OB/6, April, Sydney.
    • AS/NZS 4183 (1994), Australian/New Zealand Standard: Value Management, Joint Technical Committee, OB/6, April, Sydney.
    • (1994)
  • 5
    • 13944268857 scopus 로고    scopus 로고
    • Soft value management methodology for use in projection initiation – a learning journey
    • Barton, R.T. (2000), “Soft value management methodology for use in projection initiation – a learning journey”, Journal of Construction Research, Vol. 1 No. 2, pp. 109-22.
    • (2000) Journal of Construction Research , vol.1 , Issue.2 , pp. 109-122
    • Barton, R.T.1
  • 9
    • 1842831427 scopus 로고
    • Client's guide to traditional contract building
    • Special Publication No. 29, Construction Industry Research and information Association, London.
    • CIRIA (1984), “Client's guide to traditional contract building”, Special Publication No. 29, Construction Industry Research and information Association, London.
    • (1984)
  • 11
    • 0011107673 scopus 로고    scopus 로고
    • Thomas Telford Publishing, London.
    • Construction Industry Board (1997), Briefing the Team, Thomas Telford Publishing, London.
    • (1997) Briefing the Team
  • 15
    • 1842864302 scopus 로고
    • Reading the client's mind
    • 30 September
    • Graham, P. (1983), “Reading the client's mind”, Building, 30 September, pp. 22-3.
    • (1983) Building , pp. 22-23
    • Graham, P.1
  • 16
    • 0006305361 scopus 로고
    • Beyond value engineering: SMART value management for building projects
    • Green, S.D. (1994), “Beyond value engineering: SMART value management for building projects”, International Journal of Project Management, Vol. 12 No. 1, pp. 49-56.
    • (1994) International Journal of Project Management , vol.12 , Issue.1 , pp. 49-56
    • Green, S.D.1
  • 17
    • 84986153042 scopus 로고    scopus 로고
    • New directions in value management
    • paper presented at Hong Kong Institute of Value Management International Conference – Effective Management of Change through Value Management, Hong Kong, November.
    • Green, S.D. (1997), “New directions in value management”, paper presented at Hong Kong Institute of Value Management International Conference – Effective Management of Change through Value Management, Hong Kong, November.
    • (1997)
    • Green, S.D.1
  • 18
    • 3042633546 scopus 로고    scopus 로고
    • A critical appraisal of the briefing process in construction
    • Kamara, J.M. and Anumba, C.J. (2001), “A critical appraisal of the briefing process in construction”, Journal of Construction Research, Vol. 2 No. 1, pp. 13-24.
    • (2001) Journal of Construction Research , vol.2 , Issue.1 , pp. 13-24
    • Kamara, J.M.1    Anumba, C.J.2
  • 20
    • 84986050146 scopus 로고    scopus 로고
    • The briefing process – a knowledge transfer and creation perspective
    • paper presented at ARCOM Doctoral Workshop (Managing Innovation and Knowledge Management in the Construction Industry), Glasgow Caledonian University, Glasgow, 18 June.
    • Kao, C.C. (2003), “The briefing process – a knowledge transfer and creation perspective”, paper presented at ARCOM Doctoral Workshop (Managing Innovation and Knowledge Management in the Construction Industry), Glasgow Caledonian University, Glasgow, 18 June.
    • (2003)
    • Kao, C.C.1
  • 24
    • 0345727554 scopus 로고
    • Brief formulation and the design of buildings
    • Oxford Polytechnic, Oxford.
    • Newman, R., Jenks, M., Dawson, S. and Bacon, V. (1981), “Brief formulation and the design of buildings”, Oxford Polytechnic, Oxford.
    • (1981)
    • Newman, R.1    Jenks, M.2    Dawson, S.3    Bacon, V.4
  • 25
    • 84864238688 scopus 로고
    • New South Wales Government, Sydney.
    • NSW Government (1993), Capital Project Procurement Manual, New South Wales Government, Sydney.
    • (1993) Capital Project Procurement Manual
  • 28
    • 84986021865 scopus 로고
    • Planning to build: a practical introduction to the construction process
    • No. 113, Construction Industry Research and Information Association, London.
    • Potter, M. (1995), “Planning to build: a practical introduction to the construction process”, Special Publication, No. 113, Construction Industry Research and Information Association, London.
    • (1995) Special Publication
    • Potter, M.1
  • 31
    • 84986063876 scopus 로고    scopus 로고
    • US Government Value Engineering Requirement, Los Angeles, CA, available at:
    • SAVE International (1997), US Government Value Engineering Requirement, Los Angeles, CA, available at: www.value-eng.com/aboutgov.html.
    • (1997)
  • 32
    • 84986063879 scopus 로고    scopus 로고
    • Implementation of value management in public works projects
    • No. 35/2002, HKSAR, Kowlcon, Hong Kong, August.
    • Works Bureau (2002), “Implementation of value management in public works projects”, Environment, Transport and Works Bureau Technical Circular, No. 35/2002, HKSAR, Kowlcon, Hong Kong, August.
    • (2002) Environment, Transport and Works Bureau Technical Circular
  • 33
    • 0003734657 scopus 로고
    • Cambridge University Press, Cambridge.
    • Zeisel, J. (1984), Inquiry by Design, Cambridge University Press, Cambridge.
    • (1984) Inquiry by Design
    • Zeisel, J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.