메뉴 건너뛰기




Volumn 157, Issue 2, 2004, Pages 296-306

Simultaneous minimization of total completion time and total deviation of job completion times

Author keywords

Deterministic; Dynamic programming; Multiple criteria; Pseudo polynomial algorithm; Scheduling; Single machine

Indexed keywords

ALGORITHMS; APPROXIMATION THEORY; COMPUTATIONAL COMPLEXITY; COMPUTATIONAL METHODS; DYNAMIC PROGRAMMING; POLYNOMIALS; PROBLEM SOLVING; SCHEDULING;

EID: 2042540024     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0377-2217(03)00193-0     Document Type: Article
Times cited : (9)

References (16)
  • 1
    • 0024480571 scopus 로고
    • Simultaneous minimization of mean and variation of flow time and waiting time in single machine systems
    • Bagchi U. Simultaneous minimization of mean and variation of flow time and waiting time in single machine systems. Operations Research. 37:1989;118-125.
    • (1989) Operations Research , vol.37 , pp. 118-125
    • Bagchi, U.1
  • 2
    • 0022714365 scopus 로고
    • Minimizing mean absolute deviation of completion times about a common due-date
    • Bagchi U., Sullivan R., Cheng Y. Minimizing mean absolute deviation of completion times about a common due-date. Naval Research Logistics Quarterly. 33:1986;227-240.
    • (1986) Naval Research Logistics Quarterly , vol.33 , pp. 227-240
    • Bagchi, U.1    Sullivan, R.2    Cheng, Y.3
  • 3
    • 0025211593 scopus 로고
    • Sequencing with earliness and tardiness penalties: A review
    • Baker K.R., Scudder G.D. Sequencing with earliness and tardiness penalties: A review. Operations Research. 38:1990;22-36.
    • (1990) Operations Research , vol.38 , pp. 22-36
    • Baker, K.R.1    Scudder, G.D.2
  • 4
  • 5
    • 0001254311 scopus 로고
    • On the minimization of completion time variance with a bicriteria extension
    • De P., Ghosh J.B., Wells C.W. On the minimization of completion time variance with a bicriteria extension. Operations Research. 40:1992;1148-1155.
    • (1992) Operations Research , vol.40 , pp. 1148-1155
    • De, P.1    Ghosh, J.B.2    Wells, C.W.3
  • 6
    • 0027886805 scopus 로고
    • Simultaneous optimization of efficiency and performance balance measures in single-machine scheduling problems
    • Federgruen A., Mosheiov G. Simultaneous optimization of efficiency and performance balance measures in single-machine scheduling problems. Naval Research Logistics. 40:1993;951-970.
    • (1993) Naval Research Logistics , vol.40 , pp. 951-970
    • Federgruen, A.1    Mosheiov, G.2
  • 7
    • 0002393136 scopus 로고
    • Single- and multi-processor models for minimizing completion time variance
    • Hall N.G. Single- and multi-processor models for minimizing completion time variance. Naval Research Logistics Quarterly. 33:1986;49-54.
    • (1986) Naval Research Logistics Quarterly , vol.33 , pp. 49-54
    • Hall, N.G.1
  • 8
    • 0026223827 scopus 로고
    • Earliness-tardiness scheduling problems II: Deviation of completion times about a restrictive common due-date
    • Hall N.G., Kubiak W., Sethi S.P. Earliness-tardiness scheduling problems II: Deviation of completion times about a restrictive common due-date. Operations Research. 39:1991;847-856.
    • (1991) Operations Research , vol.39 , pp. 847-856
    • Hall, N.G.1    Kubiak, W.2    Sethi, S.P.3
  • 9
    • 0026223840 scopus 로고
    • Earliness-tardiness scheduling problems I: Weighted deviation of completion times about a common due-date
    • Hall N.G., Posner M.E. Earliness-tardiness scheduling problems I: Weighted deviation of completion times about a common due-date. Operations Research. 39:1991;836-846.
    • (1991) Operations Research , vol.39 , pp. 836-846
    • Hall, N.G.1    Posner, M.E.2
  • 11
    • 0027906623 scopus 로고
    • On scheduling to minimize earliness-tardiness and batch delivery costs with a common due-date
    • Herrmann J.W., Lee C.-Y. On scheduling to minimize earliness-tardiness and batch delivery costs with a common due-date. European Journal of Operational Research. 70:1993;272-288.
    • (1993) European Journal of Operational Research , vol.70 , pp. 272-288
    • Herrmann, J.W.1    Lee, C.-Y.2
  • 12
    • 0019702937 scopus 로고
    • Minimizing the average deviation of job completion times about a common due-date
    • Kanet J.J. Minimizing the average deviation of job completion times about a common due-date. Naval Research Logistics Quarterly. 28:1981;643-651.
    • (1981) Naval Research Logistics Quarterly , vol.28 , pp. 643-651
    • Kanet, J.J.1
  • 13
    • 0025519036 scopus 로고
    • Equivalence of mean flow time problems and mean absolute deviation problems
    • Kubiak W., Lou S., Sethi S. Equivalence of mean flow time problems and mean absolute deviation problems. Operations Research Letters. 9:1990;371-374.
    • (1990) Operations Research Letters , vol.9 , pp. 371-374
    • Kubiak, W.1    Lou, S.2    Sethi, S.3
  • 14
    • 0025897854 scopus 로고
    • Minimizing weighted number of tardy jobs and weighted earliness-tardiness penalties about a common due-date
    • Lee C.-Y., Danusapturo S.L., Lin C.S. Minimizing weighted number of tardy jobs and weighted earliness-tardiness penalties about a common due-date. Computers and Operations Research. 18:1991;379-389.
    • (1991) Computers and Operations Research , vol.18 , pp. 379-389
    • Lee, C.-Y.1    Danusapturo, S.L.2    Lin, C.S.3
  • 15
    • 2042494953 scopus 로고    scopus 로고
    • Simultaneous Minimization of Total Completion Time and Total Deviation of Job Completion Times
    • School of Business Administration, The Hebrew University, Jerusalem
    • Mosheiov, G., 2000. Simultaneous Minimization of Total Completion Time and Total Deviation of Job Completion Times. Working Paper, School of Business Administration, The Hebrew University, Jerusalem.
    • (2000) Working Paper
    • Mosheiov, G.1
  • 16
    • 0021439811 scopus 로고
    • Minimizing the sum of absolute lateness in single-machine and multi-machine scheduling
    • Sundararaghavan P., Ahmed M. Minimizing the sum of absolute lateness in single-machine and multi-machine scheduling. Naval Research Logistics Quarterly. 31:1984;325-333.
    • (1984) Naval Research Logistics Quarterly , vol.31 , pp. 325-333
    • Sundararaghavan, P.1    Ahmed, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.