메뉴 건너뛰기




Volumn 46, Issue 2, 2004, Pages 195-204

Estimating design effort for GE hydro projects

Author keywords

Design effort; Estimation; Parametric models

Indexed keywords

COST BENEFIT ANALYSIS; ERROR ANALYSIS; HYDROELECTRIC GENERATORS; MACHINE DESIGN; PARAMETER ESTIMATION; PROJECT MANAGEMENT; TURBINES;

EID: 2042509014     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2003.12.005     Document Type: Conference Paper
Times cited : (31)

References (26)
  • 2
    • 0000435058 scopus 로고    scopus 로고
    • Metrics for design projects: A review
    • Bashir H.A., Thomson V. Metrics for design projects: a review. Design Studies. 20:(3):1999;263-277.
    • (1999) Design Studies , vol.20 , Issue.3 , pp. 263-277
    • Bashir, H.A.1    Thomson, V.2
  • 5
    • 0035284272 scopus 로고    scopus 로고
    • Models for estimating design effort and time
    • Bashir H.A., Thomson V. Models for estimating design effort and time. Design Studies. 22:(2):2001;141-155.
    • (2001) Design Studies , vol.22 , Issue.2 , pp. 141-155
    • Bashir, H.A.1    Thomson, V.2
  • 6
    • 0035284019 scopus 로고    scopus 로고
    • An Analogy-based model for estimating design effort
    • Bashir H.A., Thomson V. An Analogy-based model for estimating design effort. Design Studies. 22:(2):2001;157-167.
    • (2001) Design Studies , vol.22 , Issue.2 , pp. 157-167
    • Bashir, H.A.1    Thomson, V.2
  • 9
    • 0032204186 scopus 로고    scopus 로고
    • The last word on project management
    • Bounds G. The last word on project management. IIE Solutions, November. 1998;41-43.
    • (1998) IIE Solutions , vol.NOVEMBER , pp. 41-43
    • Bounds, G.1
  • 13
    • 0000927245 scopus 로고
    • Metrics for measuring product development cycle time
    • Griffin A. Metrics for measuring product development cycle time. Journal of Product Innovation Management. 10:(2):1993;112-125.
    • (1993) Journal of Product Innovation Management , vol.10 , Issue.2 , pp. 112-125
    • Griffin, A.1
  • 15
    • 0030736583 scopus 로고    scopus 로고
    • NREC: Risk assessment and planning of complex designs
    • Jacome M.F., Lapinskii V. NREC: risk assessment and planning of complex designs. IEEE Design and Test of Computers. 14:(1):1997;42-49.
    • (1997) IEEE Design and Test of Computers , vol.14 , Issue.1 , pp. 42-49
    • Jacome, M.F.1    Lapinskii, V.2
  • 17
    • 0029203563 scopus 로고
    • Function metrics for engineered devices
    • Kannapan S.M. Function metrics for engineered devices. Applied Artificial Intelligence. 9:(1):1995;45-64.
    • (1995) Applied Artificial Intelligence , vol.9 , Issue.1 , pp. 45-64
    • Kannapan, S.M.1
  • 19
    • 0026994249 scopus 로고
    • A formal approach to specifications in conceptual design
    • Kusiak A., Szczerbicki E. A formal approach to specifications in conceptual design. Journal of Mechanical Design. 114:1992;659-666.
    • (1992) Journal of Mechanical Design , vol.114 , pp. 659-666
    • Kusiak, A.1    Szczerbicki, E.2
  • 23
    • 0009800684 scopus 로고
    • The search for perfect project management
    • Phan D., Vogel D., Nunamaker J. The search for perfect project management. Computerworld. 22:(39):1988;95-100.
    • (1988) Computerworld , vol.22 , Issue.39 , pp. 95-100
    • Phan, D.1    Vogel, D.2    Nunamaker, J.3
  • 24
    • 0022732645 scopus 로고
    • Criteria for controlling projects according to plan
    • Thamhain H.J., Wilemon D.L. Criteria for controlling projects according to plan. Project Management Journal. 17:(2):1986;75-81.
    • (1986) Project Management Journal , vol.17 , Issue.2 , pp. 75-81
    • Thamhain, H.J.1    Wilemon, D.L.2
  • 26
    • 0017449997 scopus 로고
    • A method of programming measurement and estimation
    • Walston C.E., Felix C.P. A method of programming measurement and estimation. IBM System Journal. 16:(1):1977;54-73.
    • (1977) IBM System Journal , vol.16 , Issue.1 , pp. 54-73
    • Walston, C.E.1    Felix, C.P.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.