메뉴 건너뛰기




Volumn 33, Issue 5, 2005, Pages 486-496

A comparison of methods for lot-sizing in a rolling horizon environment

Author keywords

Dynamic lot sizing; End effects; Ending inventory valuation; Rolling horizon scheme

Indexed keywords

COMPUTATIONAL METHODS; COSTS; DECISION MAKING; FORECASTING; HEURISTIC METHODS; INVENTORY CONTROL; MATHEMATICAL MODELS; PRODUCTIVITY;

EID: 19944411870     PISSN: 01676377     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.orl.2004.10.001     Document Type: Article
Times cited : (35)

References (11)
  • 1
    • 0001233812 scopus 로고
    • Improved algorithms for economic lot-size problems
    • A. Aggarwal, and J.K. Park Improved algorithms for economic lot-size problems Oper. Res. 14 1993 549 571
    • (1993) Oper. Res. , vol.14 , pp. 549-571
    • Aggarwal, A.1    Park, J.K.2
  • 2
    • 0026208005 scopus 로고
    • A simple forward algorithm to solve general dynamic lot sizing models with n periods in O(n log n) or O(n) time
    • A. Federgruen, and M. Tzur A simple forward algorithm to solve general dynamic lot sizing models with n periods in O (n log n) or O(n) time Manag. Sci. 37 1991 909 925
    • (1991) Manag. Sci. , vol.37 , pp. 909-925
    • Federgruen, A.1    Tzur, M.2
  • 3
    • 0028423763 scopus 로고
    • Minimal forecast horizons and a new planning procedure for the general dynamic lot sizing model: Nervousness revisited
    • A. Federgruen, and M. Tzur Minimal forecast horizons and a new planning procedure for the general dynamic lot sizing model Nervousness revisited Oper. Res. 42 1994 456 468
    • (1994) Oper. Res. , vol.42 , pp. 456-468
    • Federgruen, A.1    Tzur, M.2
  • 4
    • 0035351896 scopus 로고    scopus 로고
    • Ending inventory valuation in multiperiod production scheduling
    • M. Fisher, K. Ramdas, and Y. Zheng Ending inventory valuation in multiperiod production scheduling Manage. Sci. 47 2001 679 692
    • (2001) Manage. Sci. , vol.47 , pp. 679-692
    • Fisher, M.1    Ramdas, K.2    Zheng, Y.3
  • 5
    • 0020748382 scopus 로고
    • Model building techniques for the correction of end effects in multistage convex programs
    • R.C. Grinold Model building techniques for the correction of end effects in multistage convex programs Oper. Res. 31 1983 407 431
    • (1983) Oper. Res. , vol.31 , pp. 407-431
    • Grinold, R.C.1
  • 6
    • 0018296191 scopus 로고
    • A lot sizing rule for time-phased component demand
    • G.K. Groff A lot sizing rule for time-phased component demand Product. Invent. Manage. 20 1979 47 53
    • (1979) Product. Invent. Manage. , vol.20 , pp. 47-53
    • Groff, G.K.1
  • 7
    • 0027539456 scopus 로고
    • Horizon extensions for rolling production schedules: Length and accuracy requirements
    • R.A. Russel, and T.L. Urban Horizon extensions for rolling production schedules Length and accuracy requirements Int. J. Product. Econ. 29 1993 111 122
    • (1993) Int. J. Product. Econ. , vol.29 , pp. 111-122
    • Russel, R.A.1    Urban, T.L.2
  • 8
    • 0002657699 scopus 로고
    • A heuristic selecting lot size requirements for the case of a deterministic time-varying demand rate and discrete opportunities for replenishment
    • E.A. Silver, and H.C. Meal A heuristic selecting lot size requirements for the case of a deterministic time-varying demand rate and discrete opportunities for replenishment Product. Invent. Manage. 14 1973 64 77
    • (1973) Product. Invent. Manage. , vol.14 , pp. 64-77
    • Silver, E.A.1    Meal, H.C.2
  • 9
    • 0033886730 scopus 로고    scopus 로고
    • Improved rolling schedules for the dynamic single-level lot-sizing problem
    • H. Stadtler Improved rolling schedules for the dynamic single-level lot-sizing problem Manage. Sci. 46 2000 318 326
    • (2000) Manage. Sci. , vol.46 , pp. 318-326
    • Stadtler, H.1
  • 10
    • 0000495984 scopus 로고
    • Economic lot sizing: An O(n long n)-algorithm that runs in linear time in the Wagner-Whitin case
    • A. Wagelmans, S. Van Hoesel, and A. Kolen Economic lot sizing An O (n log n) -algorithm that runs in linear time in the Wagner-Whitin case Oper. Res. 40 1992 S145 S156
    • (1992) Oper. Res. , vol.40
    • Wagelmans, A.1    Van Hoesel, S.2    Kolen, A.3
  • 11
    • 0001962762 scopus 로고
    • Dynamic version of the economic lot size model
    • H.M. Wagner, and T.M. Whitin Dynamic version of the economic lot size model Manage. Sci. 5 1958 89 96
    • (1958) Manage. Sci. , vol.5 , pp. 89-96
    • Wagner, H.M.1    Whitin, T.M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.