메뉴 건너뛰기




Volumn , Issue , 2004, Pages 77-90

Full-scale evaluation of TOXECON II™ on a lignite-fired boiler

Author keywords

Activated Carbon Injection Lignite Coal; Coal creek station; EPRI; Mercury Control; Sorbent Injection

Indexed keywords

ACTIVATED CARBON INJECTION (ACI); LIGNITE-FIRED BOILERS; MERCURY CONTROL; MERCURY REMOVAL;

EID: 19944403209     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (1)

References (7)
  • 3
    • 19944383300 scopus 로고    scopus 로고
    • Full-scale evaluation of mercury control by injecting carbon upstream of ESP's
    • Arlington, VA, September 24
    • Martin, C., S. Renninger, R. Chang, L. Monroe, D. Johnson, B. Wright and M. Kane (2003). "Full-Scale Evaluation of Mercury Control by Injecting Carbon Upstream of ESP's," Air Quality IV, Arlington, VA, September 24.
    • (2003) Air Quality IV
    • Martin, C.1    Renninger, S.2    Chang, R.3    Monroe, L.4    Johnson, D.5    Wright, B.6    Kane, M.7
  • 4
    • 19944419947 scopus 로고    scopus 로고
    • Full-scale evaluation of mercury control at great river energy's stanton generating station using injected sorbents and a spray dryer/baghouse
    • Arlington, VA, September 9-12
    • Sjostrom, S., T. Ebner, R. Slye, R. Chang, M. Strohfus, J. Pelerine, and S. Smokey (2002). "Full-Scale Evaluation of Mercury Control at Great River Energy's Stanton Generating Station using Injected Sorbents and a Spray Dryer/Baghouse," Air Quality III Conference, Arlington, VA, September 9-12.
    • (2002) Air Quality III Conference
    • Sjostrom, S.1    Ebner, T.2    Slye, R.3    Chang, R.4    Strohfus, M.5    Pelerine, J.6    Smokey, S.7
  • 5
    • 19944390016 scopus 로고    scopus 로고
    • Key parameters impacting mercury control for coal-fired power plants
    • Arlington, VA, September 24
    • Sjostrom, S., J. Bustard, M. Durham and R. Chang (2003a). "Key Parameters Impacting Mercury Control for Coal-Fired Power Plants," Air Quality IV, Arlington, VA, September 24.
    • (2003) Air Quality IV
    • Sjostrom, S.1    Bustard, J.2    Durham, M.3    Chang, R.4
  • 6
    • 19944388086 scopus 로고    scopus 로고
    • Evaluation of sorbent injection and MerCAP™ for mercury control at great river energy stanton station units 1 and 10
    • October 7
    • Sjostrom, S., R. Chang, et al. (2003b), "Evaluation of Sorbent Injection and MerCAP™ for Mercury Control at Great River Energy Stanton Station Units 1 and 10," EPRI Internal Report, October 7.
    • (2003) EPRI Internal Report
    • Sjostrom, S.1    Chang, R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.