메뉴 건너뛰기




Volumn 1, Issue , 2004, Pages 1-7

An airspace concept evaluation system characterization of national airspace system delay

Author keywords

[No Author keywords available]

Indexed keywords

AIR TRAFFIC CONTROL; AIRCRAFT LANDING; AIRPORTS; ALGORITHMS; COMPUTER SIMULATION; ERROR ANALYSIS; SCHEDULING; TAKEOFF;

EID: 19644391916     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.2514/6.2004-6200     Document Type: Conference Paper
Times cited : (17)

References (8)
  • 1
    • 33846497410 scopus 로고    scopus 로고
    • July
    • Department Of Transportation and Federal Aviation Administration. Airport Capacity Benchmark Report 2001. http://www.faa.gov/events/benchmarks/. July 2004.
    • (2004) Airport Capacity Benchmark Report 2001
  • 2
    • 19644384773 scopus 로고    scopus 로고
    • Creation of a modeling and simulation capability to support NAS-wide analysis of advances ATM tools and concepts
    • NASA contract NAS2-00015. February
    • Creation of a Modeling and Simulation Capability to Support NAS-Wide Analysis of Advances ATM tools and Concepts. CTOD 7.19 Software Demonstration and Validation Report. NASA contract NAS2-00015. February 2003.
    • (2003) CTOD 7.19 Software Demonstration and Validation Report
  • 6
    • 0024771844 scopus 로고
    • National airspace system demand and capacity modeling
    • November
    • I. Frolow and J. Sinnott, National Airspace System Demand and Capacity Modeling. In Proceedings of the IEEE, Vol. 77, No. 11, November 1989.
    • (1989) Proceedings of the IEEE , vol.77 , Issue.11
    • Frolow, I.1    Sinnott, J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.